Smith Cast Iron Boilers GB250 SERIES manual
- Consulta online o descarga el manual de instrucciones
- 28 páginas
- 0.51 mb
Ir a la página of
manuales de instrucciones parecidos
-
Boiler
Smith Cast Iron Boilers GVIOM-5R
24 páginas 0.48 mb -
Boiler
Smith Cast Iron Boilers GS110W
32 páginas 1.73 mb -
Boiler
Smith Cast Iron Boilers GB300
52 páginas 2.95 mb -
Boiler
Smith Cast Iron Boilers GB200 SERIES
20 páginas 0.47 mb -
Boiler
Smith Cast Iron Boilers 19A SERIES
12 páginas 0.26 mb -
Boiler
Smith Cast Iron Boilers Series 28A
28 páginas 2.25 mb -
Boiler
Smith Cast Iron Boilers GB250 SERIES
28 páginas 0.51 mb -
Boiler
Smith Cast Iron Boilers GT Series
44 páginas 3.23 mb
Buen manual de instrucciones
Las leyes obligan al vendedor a entregarle al comprador, junto con el producto, el manual de instrucciones Smith Cast Iron Boilers GB250 SERIES. La falta del manual o facilitar información incorrecta al consumidor constituyen una base de reclamación por no estar de acuerdo el producto con el contrato. Según la ley, está permitido adjuntar un manual de otra forma que no sea en papel, lo cual últimamente es bastante común y los fabricantes nos facilitan un manual gráfico, su versión electrónica Smith Cast Iron Boilers GB250 SERIES o vídeos de instrucciones para usuarios. La condición es que tenga una forma legible y entendible.
¿Qué es un manual de instrucciones?
El nombre proviene de la palabra latina “instructio”, es decir, ordenar. Por lo tanto, en un manual Smith Cast Iron Boilers GB250 SERIES se puede encontrar la descripción de las etapas de actuación. El propósito de un manual es enseñar, facilitar el encendido o el uso de un dispositivo o la realización de acciones concretas. Un manual de instrucciones también es una fuente de información acerca de un objeto o un servicio, es una pista.
Desafortunadamente pocos usuarios destinan su tiempo a leer manuales Smith Cast Iron Boilers GB250 SERIES, sin embargo, un buen manual nos permite, no solo conocer una cantidad de funcionalidades adicionales del dispositivo comprado, sino también evitar la mayoría de fallos.
Entonces, ¿qué debe contener el manual de instrucciones perfecto?
Sobre todo, un manual de instrucciones Smith Cast Iron Boilers GB250 SERIES debe contener:
- información acerca de las especificaciones técnicas del dispositivo Smith Cast Iron Boilers GB250 SERIES
- nombre de fabricante y año de fabricación del dispositivo Smith Cast Iron Boilers GB250 SERIES
- condiciones de uso, configuración y mantenimiento del dispositivo Smith Cast Iron Boilers GB250 SERIES
- marcas de seguridad y certificados que confirmen su concordancia con determinadas normativas
¿Por qué no leemos los manuales de instrucciones?
Normalmente es por la falta de tiempo y seguridad acerca de las funcionalidades determinadas de los dispositivos comprados. Desafortunadamente la conexión y el encendido de Smith Cast Iron Boilers GB250 SERIES no es suficiente. El manual de instrucciones siempre contiene una serie de indicaciones acerca de determinadas funcionalidades, normas de seguridad, consejos de mantenimiento (incluso qué productos usar), fallos eventuales de Smith Cast Iron Boilers GB250 SERIES y maneras de solucionar los problemas que puedan ocurrir durante su uso. Al final, en un manual se pueden encontrar los detalles de servicio técnico Smith Cast Iron Boilers en caso de que las soluciones propuestas no hayan funcionado. Actualmente gozan de éxito manuales de instrucciones en forma de animaciones interesantes o vídeo manuales que llegan al usuario mucho mejor que en forma de un folleto. Este tipo de manual ayuda a que el usuario vea el vídeo entero sin saltarse las especificaciones y las descripciones técnicas complicadas de Smith Cast Iron Boilers GB250 SERIES, como se suele hacer teniendo una versión en papel.
¿Por qué vale la pena leer los manuales de instrucciones?
Sobre todo es en ellos donde encontraremos las respuestas acerca de la construcción, las posibilidades del dispositivo Smith Cast Iron Boilers GB250 SERIES, el uso de determinados accesorios y una serie de informaciones que permiten aprovechar completamente sus funciones y comodidades.
Tras una compra exitosa de un equipo o un dispositivo, vale la pena dedicar un momento para familiarizarse con cada parte del manual Smith Cast Iron Boilers GB250 SERIES. Actualmente se preparan y traducen con dedicación, para que no solo sean comprensibles para los usuarios, sino que también cumplan su función básica de información y ayuda.
Índice de manuales de instrucciones
-
Página 1
GB250-IM-5 42-9185 GB250 SERIES INST ALLA TION, OPERA TION & MAINTENANCE MANU AL AND REPLA CEMENT P AR TS LIST Gas-Fired Steam Cast Ir on Boilers 175,000 to 400,000 Btuh Input Standing Pilot, Standing Pilot & V ent Damper , Intermittent Pilot, Intermittent Pilot & V ent Damper SECTION 1: INTRODUCTION Code Compliance. ...................[...]
-
Página 2
CODE COMPLIANCE Boiler installations must conf or m to the requirements of the authority having jurisdiction or , in the absence of such requirements, to the National Fuel Gas Code ANSI Z223.1-latest edition. Where required by the authority having jurisdiction, the installation must also conf orm to the Standard f or Controls and Safety De vices f [...]
-
Página 3
VENTING REQUIREMENTS When connecting to gas vents or chimne ys, v ent instal- lations shall be in accordance with P ar t 7, V enting of Equipment, of the National Fuel Gas Code, ANSI Z223.1-latest edition, or applicable pro visions of the local building codes . For Canada, the pro visions of B149.1 and B149.2 shall apply . V ent connectors ser ving[...]
-
Página 4
4 NO TE: Boiler employs atmospheric comb ustion. Combustion air m ust not be contaminated with halogenated hydr ocarbon vapors, aer osol propellants or freon. Otherwise, boiler heat exchanger will be subject to corr osion, reducing boiler life. W A TER TREA TMENT W ater treatment is recommended in areas where water quality is a problem. A local w a[...]
-
Página 5
SECTION 2: BOILER INST ALLA TION STEP 1: LOCA TING AND SETTING THE BOILER ➤ PROCEDURE A: Chec k that pro visions for comb ustion air are in accordance with National Fuel Gas Code ANSI Z223.1-latest edition and all applicable local codes. In Canada, f ollow CAN/CGA B149(.1 or .2) installation codes. 58" FOR GB250-S-8 THR U GB250-S-9 1 1 1 1 1[...]
-
Página 6
6 ➤ PROCEDURE C: Check component positioning. 1. Remov e all packing material from boiler . 2. Install on non-combustib le floor only , unless local codes permit use and f abrication of a fireproof base (see Fig. 2.2). 3. Check that b ur ners and controls are in the proper position. 4" HOLLOW CLAY TILE (TWO COURSES) OPENINGS THRU BLOCKS IN T[...]
-
Página 7
7 STEP 3: INST ALLING HYDRONIC COMPONENTS A low-w ater cutoff must be installed to protect the unit from dr y-fire. Screw e xtension nipple into 3/4" tapping on top of the absor ption unit and install relief v alve into top of nipple with the spindle in the ve r tical position (i.e., with the valv e discharge in the hor izontal)(See Figure 2.4[...]
-
Página 8
8 The flue or vent connectors m ust be installed flush with the inside chimney liner surf ace and sealed in place with fur nace cement. Horizontal por tions of the single wall and type B venting systems shall be supported by use of strap hangers or their equiv alent. V ent suppor ts should be placed a maximum of 15-f eet apar t and as required to p[...]
-
Página 9
9 ADDITIONAL VENTING REQUIREMENTS: When connecting to gas vents or chimne ys, v ent installations shall be in accordance with P ar t 7, V enting of Equipment, of the National Fuel Gas Code, ANSI Z223.1-latest edition, or applicab le provisions of the local b uilding codes. V ent connectors ser ving appliances v ented by natural draft shall not be c[...]
-
Página 10
10 STEP 5: INST ALLING & TESTING GAS PIPING Connect the gas piping from the meter to the boiler using a pipe size which will result in a pressure drop of less than 0.3" W .C. f or natural gas or 0.5" W .C. f or propane. See Figure 2.10 f or the appropriate gas pipe sizing and e xample. Good piping practices should be f ollowed at all [...]
-
Página 11
11 T esting Gas Piping F or any pressure testing in e xcess of 1/2 psi, the boiler and its individual shutoff valv e must be isolated from the piping system by disconnecting them and capping the outlet(s). F or any pressure testing equal to or less than 1/2 psi, the boiler must be isolated from the piping system by closing its man ual shutoff valv [...]
-
Página 12
F or vent damper-equipped models , connect ther mostat to blue leads (see Figure 2.6). NO TE: If any of original wire supplied with boiler must be replaced, use similar wire of 105 ° C rating. Otherwise, insulation may melt or degrade, exposing bare wire. NO TE: Boiler transformer m ust not be used to power e xternal accessories (i.e ., zone valve[...]
-
Página 13
13 FIGURE 2.13: WIRING DIA GRAM & OPERA TION SEQUENCE FOR BOILERS EQUIPPED WITH INTERMITTENT PILO T , VENT DAMPER & MCDONNELL-MILLER #67 LO W W A TER CUT -OFF FIGURE 2.14: WIRING DIA GRAM & OPERA TION SEQUENCE FOR BOILERS EQUIPPED WITH ST ANDING PILO T , VENT D AMPER & MCDONNELL- MILLER #67 LO W W A TER CUT -OFF (EXCEPT FOR GB250-8 [...]
-
Página 14
14 FIGURE 2.15: WIRING DIA GRAM & OPERA TION SEQUENCE FOR BOILERS EQUIPPED WITH ST ANDING PILO T , VENT D AMPER & MCDONNELL- MILLER #67 LO W W A TER CUT -OFF (FOR GB250-8 & GB250-9, N.G.) FIGURE 2.16: WIRING DIA GRAM & OPERA TION SEQUENCE FOR BOILERS EQUIPPED WITH INTERMITTENT PILO T , VENT DAMPER & 400 SERIES L WCO[...]
-
Página 15
15 FIGURE 2.17: WIRING DIA GRAM & OPERA TION SEQUENCE FOR BOILERS EQUIPPED WITH ST ANDING PILO T , VENT D AMPER & 400 SERIES L WCO (EXCEPT FOR GB-250-8 & 9) FIGURE 2.18: WIRING DIA GRAM & OPERA TION SEQUENCE FOR BOILERS EQUIPPED WITH ST ANDING PILO T , VENT D AMPER & 400 SERIES L WCO (GB250-8 & 9 ONL Y)[...]
-
Página 16
16 SEQUENCE OF OPERA TION F or sequence of operation of the par ticular boiler being installed, ref er to Figures 2.13 through 2.18 in Section 2 of this manual. Spill and rollout s witches are mounted on Model GB250-5L, GB250-5H, and GB250-6 boilers. F or boilers with a spill switch, the s witch detects the escape of combustion products through the[...]
-
Página 17
17 5. Boilers are shipped from the f actor y with the primar y air shutters on the main burner wide open. It is recommended these air shutters be left in the wide open position unless there is lifting of the flame abov e the burner por ts. If there is lifting, the air shutters should be gradually closed until the lifting is eliminated. it ma y also[...]
-
Página 18
18 W ARNING: If you do not f ollo w these instructions exactl y , a fire or explosion may result with pr operty damage , personal injury , or loss of life. A . BEFORE OPERA TING smell all around the appliance area f or gas. Be sure to smell ne xt to the floor because some gas is heavier than air and will settle on the floor . WHA T TO DO IF Y OU SM[...]
-
Página 19
19 This boiler has been designed to provide y ears of trouble free perf or mance in nor mal installations. Examination by the homeo wner at the beginning of each heating season, and in mid-heating season, should assure continued good perf or mance. In addition, the boiler should be e xamined by a qualified service prof essional at least once ev ery[...]
-
Página 20
7. Continue this process f or a minimum of one hour . The process should continue until the steam is dry (no water coming from the v ent when the water in the gauge glass is at a nor mal le vel, appro ximately 2/3 full). The time required could vary up to 3 hours. 8. T ur n burner to off position. While boiler is still hot, drain completely through[...]
-
Página 21
1 Jac ket - Complete 59226 1 1 Jac ket - Complete 59227 1 Jac ket - Complete 59228 1 Jac ket - Complete 59229 1 Jac ket - Complete 59230 1 2 Base P an 59058 1 1 Base P an 59059 1 Base P an 59060 1 Base P an 59061 1 Base P an 59062 1 3 Burner - N.G./L.P . 59089 556789 4 Burner w/Pilot Bracket - N.G./L.P . 59091 111111 5 Base Door Ass'y 59094 1 [...]
-
Página 22
13 Section, Rear 3672 111111 14 Section, Intermediate 3671 334567 15 Section, F ront (No Coll Opening) 3670 111111 16 Heat Exchanger/Assembled Bloc k 72403 1 1 Heat Exchanger/Assembled Bloc k 72404 1 Heat Exchanger/Assembled Bloc k 72405 1 Heat Exchanger/Assembled Bloc k 72406 1 Heat Exchanger/Assembled Bloc k 72407 1 17 P or t Seal - 5" 60306[...]
-
Página 23
Honeywell Intermittent Pilot System 6 Pilot Ass'y N.G. - Q3451B-1103 72354 1 1 Pilot Ass'y N.G. - Q3451B-1103 70003 1 Pilot Ass'y N.G. - Q3451B-1103 72355 1 Pilot Ass'y N.G. - Q3451B-1103 72356 1 Pilot Ass'y N.G. - Q3451B-1103 72357 1 Pilot Ass'y L.P . - Q3451B-1103 72360 1 1 Pilot Ass'y L.P . - Q3451B-1103 72361 [...]
-
Página 24
24 29 33 17 15 14 13 18 19 25 27 10 6 7 4 3 11 31 30 5 2 28 32 1 JA CKET ASSEMBL Y 34 16 26 9 23 24 22[...]
-
Página 25
Any appliance that b ur ns natural gas, propane gas , fuel oil, wood or coal is capable of producing carbon mono xide (CO). Carbon mono xide (CO) is a gas which is odor less, colorless and tasteless but is v ery toxic. If your Smith boiler is not w or king properly , or is not vented properly , dangerous lev els of CO may accum ulate. CO is lighter[...]
-
Página 26
26[...]
-