Allied Air Enterprises Upflow manuel d'utilisation
- Voir en ligne ou télécharger le manuel d’utilisation
- 28 pages
- 0.91 mb
Aller à la page of
Les manuels d’utilisation similaires
-
Furnace
Allied Air Enterprises 92G1DF
48 pages 3.59 mb -
Furnace
Allied Air Enterprises A80UH
39 pages 0.65 mb -
Furnace
Allied Air Enterprises 95G1UH
48 pages 0.79 mb -
Furnace
Allied Air Enterprises 92G1UH
48 pages 0.79 mb -
Furnace
Allied Air Enterprises A95DF
48 pages 3.59 mb -
Furnace
Allied Air Enterprises 80G1UH
39 pages 0.65 mb -
Furnace
Allied Air Enterprises Downflow or Horizontal 2 Stage Heat Variable Speed Gas Fired Non-Condensing Warm Air Furnace
28 pages 0.91 mb -
Furnace
Allied Air Enterprises A95UH
48 pages 0.79 mb
Un bon manuel d’utilisation
Les règles imposent au revendeur l'obligation de fournir à l'acheteur, avec des marchandises, le manuel d’utilisation Allied Air Enterprises Upflow. Le manque du manuel d’utilisation ou les informations incorrectes fournies au consommateur sont à la base d'une plainte pour non-conformité du dispositif avec le contrat. Conformément à la loi, l’inclusion du manuel d’utilisation sous une forme autre que le papier est autorisée, ce qui est souvent utilisé récemment, en incluant la forme graphique ou électronique du manuel Allied Air Enterprises Upflow ou les vidéos d'instruction pour les utilisateurs. La condition est son caractère lisible et compréhensible.
Qu'est ce que le manuel d’utilisation?
Le mot vient du latin "Instructio", à savoir organiser. Ainsi, le manuel d’utilisation Allied Air Enterprises Upflow décrit les étapes de la procédure. Le but du manuel d’utilisation est d’instruire, de faciliter le démarrage, l'utilisation de l'équipement ou l'exécution des actions spécifiques. Le manuel d’utilisation est une collection d'informations sur l'objet/service, une indice.
Malheureusement, peu d'utilisateurs prennent le temps de lire le manuel d’utilisation, et un bon manuel permet non seulement d’apprendre à connaître un certain nombre de fonctionnalités supplémentaires du dispositif acheté, mais aussi éviter la majorité des défaillances.
Donc, ce qui devrait contenir le manuel parfait?
Tout d'abord, le manuel d’utilisation Allied Air Enterprises Upflow devrait contenir:
- informations sur les caractéristiques techniques du dispositif Allied Air Enterprises Upflow
- nom du fabricant et année de fabrication Allied Air Enterprises Upflow
- instructions d'utilisation, de réglage et d’entretien de l'équipement Allied Air Enterprises Upflow
- signes de sécurité et attestations confirmant la conformité avec les normes pertinentes
Pourquoi nous ne lisons pas les manuels d’utilisation?
Habituellement, cela est dû au manque de temps et de certitude quant à la fonctionnalité spécifique de l'équipement acheté. Malheureusement, la connexion et le démarrage Allied Air Enterprises Upflow ne suffisent pas. Le manuel d’utilisation contient un certain nombre de lignes directrices concernant les fonctionnalités spécifiques, la sécurité, les méthodes d'entretien (même les moyens qui doivent être utilisés), les défauts possibles Allied Air Enterprises Upflow et les moyens de résoudre des problèmes communs lors de l'utilisation. Enfin, le manuel contient les coordonnées du service Allied Air Enterprises en l'absence de l'efficacité des solutions proposées. Actuellement, les manuels d’utilisation sous la forme d'animations intéressantes et de vidéos pédagogiques qui sont meilleurs que la brochure, sont très populaires. Ce type de manuel permet à l'utilisateur de voir toute la vidéo d'instruction sans sauter les spécifications et les descriptions techniques compliquées Allied Air Enterprises Upflow, comme c’est le cas pour la version papier.
Pourquoi lire le manuel d’utilisation?
Tout d'abord, il contient la réponse sur la structure, les possibilités du dispositif Allied Air Enterprises Upflow, l'utilisation de divers accessoires et une gamme d'informations pour profiter pleinement de toutes les fonctionnalités et commodités.
Après un achat réussi de l’équipement/dispositif, prenez un moment pour vous familiariser avec toutes les parties du manuel d'utilisation Allied Air Enterprises Upflow. À l'heure actuelle, ils sont soigneusement préparés et traduits pour qu'ils soient non seulement compréhensibles pour les utilisateurs, mais pour qu’ils remplissent leur fonction de base de l'information et d’aide.
Table des matières du manuel d’utilisation
-
Page 1
AFFIX LABEL HERE INSTALLATION AND SERVICING INSTRUCTIONS UPFLOW, DOWNFLOW OR HORIZONTAL TWO STAGE HEAT VARIABLE SPEED GAS-FIRED NON-CONDENSING WARM AIR FURNACE Issue 0527 TABLE OF CONTENTS Safety ........................................... 2 Furnace Specifications ............................... 3 Furnace Wiring Specifications .....................[...]
-
Page 2
SAFETY The following is a list of safety precautions and their locations in this manual. These safety rules and precautions must be followed when installing this furnace. 1. Use only with type of gas approved for this furnace. Refer to the furnace rating plate. 2. Install this furnace only in a location and position as specified in The Location/Pla[...]
-
Page 3
FURNACE SPECIFICATIONS MODEL UNIT DIMENSIONS DUCT SUPPLY OPENING DUCT RETURN OPENING VENT PIPE DIA. MAX. OVER CURRENT PROTECTION MAX. UNIT AMPS ELECTRICAL SUPPLY MIN. WIRE SIZE(AWG) TEMPERATURE RISE RANGE NET WEIGHT LBS LENGTH WIDTH HEIGHT A B C D E F G H LOW FIRE HIGH FIRE AV050B3 29 1/2 13 1/2 38 1/4 11 1/2 20 3/8 12 21 5/8 4 15 9.9 14 30 - 60 40[...]
-
Page 4
BLOWER MOTOR SPECIFICATIONS AND AIRFLOW ADJUSTING DATA Adjusting Airflow MODEL MOTOR HP BLOWER WHEEL HEAT SETTINGS COOL SETTINGS HEATING CFM @ .50 STATIC COOL CFM @ .50 STATIC SETTING "A" SETTING "B" SETTING "C" SETTING "D" COOLING ADJUSTMENT SETTING "A" SETTING "B" SETTING "C" S[...]
-
Page 5
FURNACE WIRING SPECIFICATIONS 20571201 Issue 0527 Page 5 of 28[...]
-
Page 6
The furnace cabinet must have an uninterrupted or unbroken electrical ground to minimize personal injury if an electrical fault should occur. The unit must also be electrically grounded in accordance with local codes, or in the absence of local codes, with the latest edition of the (U.S.) National Electrical Code ANSI/NFPA No. 70 or CSA Standard C2[...]
-
Page 7
LOCATION / PLACEMENT Site Selection : This furnace may be located in an attic, closet, basement, crawl space, alcove or suspended from the ceiling of a utility room or basement. Select a location that will meet all requirements for safety, clearances, ventilation and combustion air, ductwork design, gas piping, electrical wiring and venting. Cleara[...]
-
Page 8
If the furnace is to be installed in a crawl space, consult local codes. (Use of a concrete pad 1" to 2" thick is recommended.) If the furnace is to be suspended from the ceiling, it will be necessary to use steel pipe straps around each end of the furnace. These straps should be attached to the furnace with sheet metal screws and to the [...]
-
Page 9
If the installation area meets the definition of "Unconfined Space" and does not have additional air requirements as described, the furnace may be installed without making special provisions for combustion and ventilation air. Whenever this furnace is installed in an area along with one or more gas appliances, the total Btu/hr input of al[...]
-
Page 10
Figure 4 CONFINED SPACE / OUTDOOR AIR FROM ATTIC Figure 5 CONFINED SPACE / OUTDOOR AIR FROM ATTIC & CRAWL SPACE For an attic installation it is important to keep insulation 12" or more away from any furnace openings. Some types of insulating materials may be combustible. When horizontal ducts are used to supply air from the outdoors, they [...]
-
Page 11
DUCTING The proper sizing of warm air ducts is necessary to insure satisfactory heating operation. Ductwork should be in accordance with the latest editions of (U.S.) NFPA-90A ( Air Conditioning Systems ) and NFPA-90B ( Warm Air Heating and Air Conditioning Systems ) or Canadian equivalent. Ductwork Recommendation: The supply duct work should be at[...]
-
Page 12
Filters: Air filters must be used in every installation. For side return installations, air filters must be installed external to the furnace casing. An external filter rack kit with filter (parts No. 20069901 or Cat. No. 68L75 12 / 15½" x 25" sizes and 20069902 or Cat. No. 68L76 for 15½" / 19" x 25" sizes) is available a[...]
-
Page 13
vent. If deterioration is discovered, the chimney must be repaired or the "B" vent must be replaced. 2. Inspection to ascertain that the vent system is clear and free of obstructions. Any blockage must be cleared before installing this furnace. 3. Cleaning the chimney or "B" vent if previously used for venting a solid fuel burni[...]
-
Page 14
4. All pipe should be supported using the proper clamps and/or straps. These supports should be at least every four (4') feet. 5. All horizontal runs of pipe should have at least a 1/4" (in.) per foot of upward slope from the furnace to the vent terminal. 6. All runs of pipe should be as short as possible with as few turns as possible. 7.[...]
-
Page 15
CARBON MONOXIDE POISONING HAZARD Failure to follow the steps outlined below for each appliance connected to the venting system being placed into operation could result in carbon monoxide poisoning or death. The following steps shall be followed for each appliance connected to the venting system being placed into operation, while all other appliance[...]
-
Page 16
Figure 11 AUTOMATIC HEAT STAGING JUMPER When installing optional accessories to this appliance, follow the manufacturer's installation instructions included with the accessory. The unit cabinet must have an uninterrupted or unbroken electrical ground to minimize personal injury if an electrical fault should occur. This may consist of electrica[...]
-
Page 17
This furnace is manufactured for use with Natural gas and must be converted using the proper LP conversion kit for use with LP (Propane) gas. For LP (Propane) gas, a tank regulator is required to reduce supply pressure to 12"-13"w.c. For manifold pressure see Table 6. A main manual shut off valve must be used in the gas piping. The shut o[...]
-
Page 18
Cooling Mode : The units are factory set for the highest airflow for each model. Adjustments can be made to the cooling airflow by repositioning the jumper plug marked COOL - A, B, C, D (see AirFlow Adjustment Table on page 4) based on the information found in the table. By moving the ADJUST jumper plug (see Table on page 4) from the NORM position [...]
-
Page 19
STARTUP AND OPERATIONAL CHECKOUT It is not recommended that this furnace be used as a construction heater during any phase of construction. Very low return air temperatures, harmful vapors and operation of the unit with clogged or misplaced filters will damage the unit. The unit may only be used for heating of buildings or structures under construc[...]
-
Page 20
The gas control (Figure 13) has two separate pressure regulator adjustment screws, one for 1 st stage (marked "LO") and the second one for 2 nd stage (marked "HI"). The adjusting screws are positioned on either side of the barbed fitting. The pressure regulator adjustment is sensitive: one turn of the adjusting screw will result[...]
-
Page 21
Burner Orifice Sizing: The furnace is supplied with standard orifices for the gas shown on the rating plate. Table 6 shows combinations of heating values and specific gravities for various gases, from which proper input can be obtained. If changing orifices is required, remove the manifold from the furnace (following the instructions found on page [...]
-
Page 22
Limit Control Checkout: After the furnace has been in operation for at least 15 minutes, restrict the return air supply by blocking the filters or closing the return registers and allow the furnace to shut down on high limit. The main burners will shut OFF and the main blower and combustion blower should continue to run. Remove the restriction and [...]
-
Page 23
SEQUENCE OF OPERATION DIRECT IGNITION SYSTEM CONTROL 20571201 Issue 0527 Page 23 of 28[...]
-
Page 24
SERVICING THE FURNACE ELECTRICAL SHOCK, FIRE OR EXPLOSION HAZARD Failure to follow safety warnings exactly could result in dangerous operation, serious injury, death or property damage. Improper servicing could result in dangerous operation, serious injury, death or property damage. • Before servicing, disconnect all electrical power to furnace. [...]
-
Page 25
4. Disconnect wires from rollout switch. 5. Remove manifold or burner/manifold assembly. Manifold ONLY a. Remove the No. 10 screws that secure the manifold pipe to both legs of the manifold assembly. The manifold pipe must be supported during this step, or it could fall and damage the furnace or cause bodily injury! b. Slide the manifold pipe (with[...]
-
Page 26
TROUBLE SHOOTING With LED Indicator Assistance Troubleshooting Make the following visual checks before toubleshooting: 1. Check to see that the power to the furnace and the integrated ignition/blower control board is ON. 2. The manual shutoff valves in the gas line to the furnace must be open 3. Make sure all wiring connections are secure. 4. Revie[...]
-
Page 27
WIRING DIAGRAM 20571201 Issue 0527 Page 27 of 28[...]
-
Page 28
NOTES 20571201 Issue 0527 Page 28 of 28[...]