Heatcraft Refrigeration Products H-IM-79E manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Heatcraft Refrigeration Products H-IM-79E, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Heatcraft Refrigeration Products H-IM-79E one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Heatcraft Refrigeration Products H-IM-79E. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Heatcraft Refrigeration Products H-IM-79E should contain:
- informations concerning technical data of Heatcraft Refrigeration Products H-IM-79E
- name of the manufacturer and a year of construction of the Heatcraft Refrigeration Products H-IM-79E item
- rules of operation, control and maintenance of the Heatcraft Refrigeration Products H-IM-79E item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Heatcraft Refrigeration Products H-IM-79E alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Heatcraft Refrigeration Products H-IM-79E, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Heatcraft Refrigeration Products service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Heatcraft Refrigeration Products H-IM-79E.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Heatcraft Refrigeration Products H-IM-79E item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    ™ H-IM-79E JANUAR Y 201 1PartNo.25001401 Beacon II™ R efrigeration Sy s t em s Installationand OperationManual Replaces H-IM-79E (09/07) T ableofContents Beacon II™ Board Layout .....................................[...]

  • Page 2

    2 © 2007, Heatcraft Refrigeration Products LLC[...]

  • Page 3

    3 BeaconII™BoardLayout BEACONII™BOARD Defrost Heater Relay Evaporator Fan Relay LED Display Room Sensor Defrost Sensor Suction Sensor Suction Pressur e Expansion V alve Connection Selection Buttons 24V T erminal Block[...]

  • Page 4

    4 InstallationT ips • Use a minimum 18 gauge wire for all low voltage connections • The Beacon II board gets its 24 V AC power supply from a transformer mounted in the electrical end of each evaporator . On 208-240 volt systems the multi-tap transformer is shipped from our factory wir ed for 240 volts. If your supply voltage is 208 volt you [...]

  • Page 5

    5 The electric expansion valve and the suction temperatur e sensor on the suction line are factory installed. Care must be taken when brazing these lines at the evaporator . T oohighatemperaturemaydestroythese components.Heatabsorbingcompoundsor“wet rags”mustbeusedtoprotecttheelectric?[...]

  • Page 6

    6 Each Beacon II board power is supplied by a transformer in the evaporator on which it is mounted. Do not run any 24 V AC wires between Beacon II boards on the evaporators. Conguration CU M S S S M = Master Evaporator S = Slave Evaporator CU = Condensing Unit If there ar e multiple evaporators on a system, the program for each SLA VE evaporator[...]

  • Page 7

    7 BoxT emperatureControlSettings • There is an on boar d roomthermostat on the Beacon II board which can be adjusted to the desired r oom temperatur e. The temperature dif fer ential is 2° F .   T emperatureDifferential When a system is in the cooling mode and the box setpoint is 35°F , the system will continue to cool unti[...]

  • Page 8

    8 CU M M = Master Evaporator CU = Condensing unit Start-UpOperation SingleSystemWith1Evaporator • Check all wiring connections to be sure they are corr ect and tight. • On the condensing unit - Check the setting of time delay relay . It should be set at 1 minute (the second marker). - Check the low pressur e switch setting on [...]

  • Page 9

    9 SingleSystemWithMultiple Evaporators • Check all wiring connections to be sure they are corr ect and tight. • On the condensing unit - Check the setting of time delay relay . It should be set at 1 minute (the second marker). - Check the low pressure switch setting on freezer units. It must be set to 0 psig cut-out, 10 psig cut-[...]

  • Page 10

    10 Start-UpOperation MultipleSystemsWithMultiple Evaporators (Requires A Smart Controller) • Check all wiring connections to be sure they are corr ect and tight. • On the condensing units - Check setting of time delay relay . It should be set at 1 minute (the second marker). - Check the low pressur e switch setting on[...]

  • Page 11

    1 1 InitialPowerOn At the initial application of power to the system, the compressor and the evaporator fans will be in a 4 minute hold-off cycle and will not start immediately . When there is a call for COOLING , the expansion valve (EEV) opens, then the compressor is started. The compr essor will then run for a minimum of 2 minutes in th[...]

  • Page 12

    12 Programming&Reviewing Programming AndReviewingSettings/Changes “PROGRAMREVIEW”ITEMS  A-E - Set Defr ost type (Air or ELE)  rEF - Set Refrigerant type (R22, R404A or R507) bot - Set Box temperatur e (-30°F to +70°F)   SUP - Set Superheat (4°F to 20°F)   SLA  - Set Board as a Sla[...]

  • Page 13

    13 • Defrost T ype – “A-E”- Selection is made for air defrost or electric defr ost coil. This will automatically set the system factory defaults for air defrost and electric defr ost. (See default settings.) Please note that the refrigerant type default for air defrost is R-22 and for electric defrost it is R404A. All units ar e sh[...]

  • Page 14

    14 Programming&Reviewing FORCE DEFROST RESET TIME MONITOR FORCE SERVICE Usethe“MONITOR” button to review these items: SUP - Superheat (°F/°C)  ESP - Expansion valve steps (0 to 255 steps)  SCt - Suction temperatur e (°F/°C)  SSt - Saturated Suction temperatur e (°F/°C)  SCP - Suction pr essur e at Evap[...]

  • Page 15

    15 Programming&Reviewing LockingTheBeaconIIBoard The Beacon II board is lockable to pr event pr ogrammed setting changes by unauthorized personnel. When locked, the program setpoints cannot be changed. T o lock the setting: • Pr ess “ PROGRAMREVIEW ” button. • Pr ess and hold “ MONITOR ” button. • Whilehold[...]

  • Page 16

    16 ST A TUSINDICA TORLED  • ERRORS E1 - Room temperature sensor shorted, open or not installed    E2 - Defrost temperatur e sensor shorted, open or not installed    E3 - Suction temperature sensor shorted, open or not installed    E4 - Suction pressur e transducer shorted, open or not[...]

  • Page 17

    17 DefrostDelayStartTime Example: The system is rst powered up at 8:00 AM and is programmed for 4 defr ost per day . The user would like the rst defrost at 10:00 AM. T o accomplish this, use the “PROGRAMREVIEW” button to scroll to dFS . Use the “SELECTOR” switch to select 2 hours delay start, then press “ENTER.” The[...]

  • Page 18

    18 ElectricDefrostMode When a defrost is initiated, the EEV closes, the compressor is allowed to pumpdown and shut of f. The evaporator fans are cycled of f and the defr ost heaters are ener gized. On multiple evaporator systems, all controllers must terminate their defrost, either on temperatur e or fail-safe time, before the master contr[...]

  • Page 19

    19 ErrorIndicator Air Defrost fan motors must be wir ed thr ough the fan relay on the Beacon II boar d for this to be ef fective on Air Defrost systems. The entir e system will be shut of f and remain of f until the SPST switch is opened. Air Defrost evaporator fans ar e setup to run constantly . If there is a need to shut down the evaporator fa[...]

  • Page 20

    20 CheckingOperationOfExpansion V alve(EEV) T o check if the expansion valve is closing properly: Install a pressur e gauge-set to suction line at the condensing unit. With the system running, close the valve on the liquid line, at the con densing unit. The system should pumpdown and shut off on the Low Pr essur e switch (LPS). If[...]

  • Page 21

    21 PowerFailures In the event of a power failure Beacon II will automatically close the expansion valve to prevent refrigerant fr om migrating thr oughout the system. After power returns, with 24 V AC at the board, the system will restart in the cooling mode after the four -minute hold of f period. SpareSensorT erminals Beacon II pro[...]

  • Page 22

    22 SystemDefaults T able2.SystemDefaults  P ARAMETERS CODE AIR ELECTRIC Refrigerant rEF R-22 R-404A Box T emperature bot 35°F -10°F Superheat SUP 8°F 8°F Slave Evaporator SLA No No No. of Defrost per Day dFn 2 4 Defrost Fail-safe time dFF 40 min. 30 min. Defrost End T emperatur e dFt 45°F 60°F Defrost Delay Start Ti[...]

  • Page 23

    23 InterLinkReplacementPartsList T able3.InterLinkReplacementPartsList     P ARTDESCRIPTION P ARTNUMBER Beacon II Control Boar d 28910101 *T emperature Sensor kit – White Leads 89904902 T ransformers: 120/24 volt – 40 V A 22529601 240/24 volt – 40 V A 22529602 460/24 volt – 40 V A 22529603 575[...]

  • Page 24

    24 BeaconIIT roubleshootingGuide Diagnostics ExpansionV alveCapacity  PartNumber V alve 100 BTUH 100 BTUH 100 BTUH 100 BTUH  29320003 ESVB-1 0.68 8160 0.64 7680 0.48 5760 0.42 5040  29320004 ESVB-4 3.27 39240 3.07 36840 2.31 27720 2.05 [...]

  • Page 25

    25 BeaconIIT roubleshootingGuide(continued) Diagnostics  PartNumber V alve 100 BTUH 100 BTUH 100 BTUH 100 BTUH  29320003 ESVB-1 0.68 8160 0.64 7680 0.48 5760 0.42 5040  29320004 ESVB-4 3.27 39240 3.07 36840 2.31 27720 2.05 24600  293[...]

  • Page 26

    26 BeaconIIT roubleshootingGuide(continued) Master in out Slave 1 in out Slave 2 in out Slave 3 in out 1 2 3 in out Master in out Slave 1 in out Slave 2 in out 1 2 3 5 Slave 3 in out 4 Diagnostics BeaconIISmart Controller 4 PROBLEM Step ACTION ITEM IF OK IF NOT OK E9  Multi-out to Multi-in 1. Check for 24 volts power to the [...]

  • Page 27

    27 BeaconIIT roubleshootingGuide(continued) Diagnostics PROBLEM Step ACTION ITEM IF OK IF NOT OK 1. Check system operation: Is it running? 1. Check power to condensing unit Check position of Service Mode switches Check compressor overloads and contactor 2. Check system charge 2. Add or remove r efrigerant to proper char ge 3. Check for [...]

  • Page 28

    28 Wiring[...]

  • Page 29

    29 Wiring[...]

  • Page 30

    30 Wiring[...]

  • Page 31

    31 Wiring[...]

  • Page 32

    32 Wiring[...]

  • Page 33

    33 Wiring[...]

  • Page 34

    34 EV APORA TORS All evaporator units should be checked once a month or more often for pr oper defr osting because the amount and pattern of frosting can vary greatly . It is dependent on the coil temperature, the temperatur e of the r oom, the type of product being stor ed, how often new pr oduct is brought into the r oom and the per centage of[...]

  • Page 35

    35 ServiceRecord DateofStart-up Location Address CONDENSINGUNIT MODEL# SERIAL# COOLERUNIT MODEL# SERIAL# FREEZERUNIT MODEL# SERIAL# ELECTRICAL • Check Primary Supply voltage. If 208 V , change transformer wiring in the Cooler and Freezer to the 208 V tap  YES • Check Compressor Amps for COOLER and FR[...]

  • Page 36

    Since product improvement is a continuing effort, we reserve the right to make changes in specications without notice. C L I M A T E C O N T R O L Commercial Refrigeration Parts The name behind the brands you trust. ™ RECORD OUTDOOR TEMPERA TURE ______°F SYSTEM VOL T AGE ______V olts ______PH ______Hz Cooler Compressor Amps ______L1 ______L2 [...]