Go to page of
Similar user manuals
-
Air Conditioner
Mitsubishi Electronics PCH36GK
70 pages 1.52 mb -
Air Conditioner
Mitsubishi Electronics PDFY-P24NMU-E
25 pages 1.79 mb -
Air Conditioner
Mitsubishi Electronics MS09NW2
21 pages 0.48 mb -
Air Conditioner
Mitsubishi Electronics MS-GA60VB
13 pages 1 mb -
Air Conditioner
Mitsubishi Electronics MUZ-GE25VA
96 pages 7.04 mb -
Air Conditioner
Mitsubishi Electronics MSZ-GA22VA
16 pages 3.48 mb -
Air Conditioner
Mitsubishi Electronics PEFY-P15
13 pages 1.97 mb -
Air Conditioner
Mitsubishi Electronics MSZ-FD35VAS
40 pages 5.83 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Mitsubishi Electronics 125, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Mitsubishi Electronics 125 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Mitsubishi Electronics 125. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Mitsubishi Electronics 125 should contain:
- informations concerning technical data of Mitsubishi Electronics 125
- name of the manufacturer and a year of construction of the Mitsubishi Electronics 125 item
- rules of operation, control and maintenance of the Mitsubishi Electronics 125 item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Mitsubishi Electronics 125 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Mitsubishi Electronics 125, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Mitsubishi Electronics service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Mitsubishi Electronics 125.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Mitsubishi Electronics 125 item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
INST ALLA TION MANUAL For safe and correct use, please read this in stallation manual thoroughly before installing the air-conditioner unit. Air-Conditioners PEAD-RP71, 100, 125, 140JAA English FOR INST ALLER KD79D905H01_Cove r.fm Page 1 Friday, October 14, 2011 10 :08 AM[...]
-
Page 2
2 3 [Fig. 3-1] 4 [Fig. 4-1] C D C E D A Unit body B Lifting machine 5 [Fig. 5-1] [Fig. 5-2] [Fig. 5-3] A Center of gravity A Indoor unit’s bottom surface 5.2 5.1 A Access door B Electrical parts box C Air inlet D Air outlet E Ceiling surface F Service space (viewed from the side) G Service space (viewed from the direction of arrow) 1 600 mm or mo[...]
-
Page 3
3 6 ø B ø A a b [Fig. 6-1] a Indoor unit b Outdoor unit a d c b ef 90 ° d c b a b a a b e b c d c A c b a de fg h i [Fig. 6-9] A Pipe cover (small) (accessory) B Caution: Pull out the thermal insulation on the refrigerant piping at the site, insert the flare nut to flare the end, and replace the insu- lation in its original position. T ake care [...]
-
Page 4
4 [Fig. 6-10] [Fig. 6-1 1] 6 6.5 C D G F E B 52 5 A A Indoor unit B Tie band (accessory) C Band fixing part D Insertion margin E Drain socket (accessory) F Drain pipe (O.D. ø 32 PVC TUBE, field supply) G Insulating material (field supply) A B1 C C C D2 E A Downward s lope 1/100 or mo re B Connection dia. R1 exte rnal thread C Indoor unit D Collect[...]
-
Page 5
5 8 [Fig. 8-1] 8.1 7 7.1 A Outdoor unit power supply B Earth leakage breaker C Wiring circuit breaker or isolating switch D Outdoor unit E Indoor unit/outdoor unit connecting cords F Remote controller (option) G Indoor unit S1 S2 L N 1 2 S1 S2 S3 S3 AB C D E F G A Outdoor unit power supply B Earth leakage breaker C Wiring circuit breaker or isolati[...]
-
Page 6
6 8.2 F Use PG bushing to keep the weight of the cable and external force from being applied to the power supply terminal connector . Use a cable tie to secure the cable. G Power source wiring H Use ordinary bushing I Transmission wiring J T erminal block for power source and indoor transmission K T erminal block for remote controller [Fig. 8-2-3] [...]
-
Page 7
7 A For installation in the switch box: B For direct installation on the wall select one of the following: • Prepare a hole through the wall to pass the remote controller cord (in order to run the remote controller cord from the back), then seal the hole with putty . • Run the remote controller cord through the cut-out upper case, then seal the[...]
-
Page 8
8 A B C D E G H F A Signal receiving unit external B Center of Switch box C Switch box D Installation pitch E 6.5 mm (1/4 inch) F 70 mm (2 - 3/4 inch) G 83.5 ± 0.4 mm (3 - 9/32 inch) H Protrusion (pillar , etc) [Fig. 8-9] A B C A Remote controller wire B Hole (drill a hole on the ceiling to pass the remote controller wire.) C Signal Receiving Unit[...]
-
Page 9
9 8 8.4 [Fig. 8-12] [Fig. 8-13] AB C D A Thin-wall portion B Bottom case C Remote controller wire D Conducting wire [Fig. 8-14] A A Screw (M4 x 30) * When installing the lower case directly on the wall or the ceiling, use wood screws. Insert the minus screwdriver toward the arrow pointed and wrench it to remove the cover . A flat screwdriver whose [...]
-
Page 10
10 8 8.4 [Fig. 8-16] IC IC IC IC CN90 CN90 CN90 CN90 Pair number: 0 [Fig. 8-17] IC CN90 IC CN90 Pair n umber: 0 Pair n umber: 0 Pair n umber: 0 Pair number: 0 IC IC IC IC CN90 CN90 CN90 CN90 [Fig. 8-19] [Fig. 8-18] Pair number: 0 Pair number: 1 Pair number: 2 Pair number: 3 Pair number: 0 Pair number: 1 Pair number: 2 Pair number: 3 Pair number: 0 [...]
-
Page 11
11 9 [Fig. 9-1] [Fig. 9-2] 9.2 ˚ C ˚ C SIMPLE PAR-21MAA ON/OFF FILTER CHECK OPERATION CLEAR TEST TEMP. MENU BACK DAY MONITOR/SET CLOCK ON/OFF TEST RUN COOL, HEAT A F C ED B M I H G ˚ C ˚ C SIMPLE PAR-21MAA ON/OFF FILTER CHECK OPERATION CLEAR TEST TEMP. MENU BACK DAY MONITOR/SET CLOCK ON/OFF B C A E D A ON/OFF button B T est run display C Indoor[...]
-
Page 12
12 10 [Fig. 10-1] B A G H K L M I J C D E F A Indoor unit B Union C Liquid pipe D Gas pipe E Stop valve F Outdoor unit G Refrigerant gas cylinder operating valve H Refrigerant gas cylinder for R410A with siphon I Refrigerant (liquid) J Electronic scale for refrigerant charging K Charge hose (for R410A) L Gauge manifold valve (for R410A) M Service p[...]
-
Page 13
13 Contents 1. Safety precautions ................................................................................. 13 2. Selecting the installation location ........................................................... 13 3. Selecting an installation site & Accessories ........................................... 14 4. Fixing hanging bolts ......[...]
-
Page 14
14 3. Selecting an installation site & Accessories • Select a site with sturdy fixed surface sufficiently durable against the weight of unit. • Before installing unit, the routing to carry in unit to the installation site should be determined. • Select a site where the unit is not affected by entering air . • Select a site where the flo[...]
-
Page 15
15 6. Refrigerant piping work [Fig. 6-5] (P .3) a Flare nut b Copper tube • Remove flare nuts attached to indoor and outdoor unit, then put them on pipe/tube having completed burr removal. (not possible to put them on after flaring work) 6.2.4. Flaring work [Fig. 6-6] (P .3) a Flaring tool b Die c Copper tube d Flare nut e Y oke • Carry out fla[...]
-
Page 16
16 6. Refrigerant piping work 6.4. Purging procedures leak test PURGING PROCEDURES Connect the refrigerant pipes (both the liquid and gas pipes) between the indoor and the outdoor units. Remove the service port cap of the stop valve on the side of the outdoor unit gas pipe. (The stop valve will not work in its initial state fresh out of the factory[...]
-
Page 17
17 • Connect canvas duct between unit and duct. [Fig. 7-1] (P .5) • Use incombustible material for duct parts. • Provide full insulation to inlet duct flange and outlet duct to prevent condensation. • Be sure to change the position of air filter to a position where it can be serviced. <A> In case of rear inlet <B> In case of bot[...]
-
Page 18
18 8.1. Power supply 8.1.1. Indoor unit power supplied from outdoor unit The following connection patterns are available. The outdoor unit power supply patterns vary on models. 1:1 System [Fig. 8-1] (P .5) A Outdoor unit power supply B Earth leakage breaker C Wiring circuit breaker or isolating switch D Outdoor unit E Indoor unit/outdoor unit conne[...]
-
Page 19
19 8. Electrical work 8.2. Indoor wire connection Work procedure 1.Remove 2 screws to detach the electric component cover. 2.Route each cable through the wiring intake into the electric component box. (Pro- cure power cable and in-out connecting cable locally and use remote control cable supplied with the unit.) 3.Securely connect the power cable a[...]
-
Page 20
20 8. Electrical work 2) How T o Install [Fig. 8-8] (P .8) to [Fig. 8-15] (P .9) 1. Common items for “ Installation on the ceiling ” and “ Installation on the switch box or on the wall ” [Fig. 8-8] (P .8) A Signal receiving unit external E 6.5 mm (1/4 inch) B Center of Switch box F 70 mm (2 - 3/4 inch) C Switch box G 83.5 ± 0.4 mm (3 - 9/3[...]
-
Page 21
21 8.5. Function settings (Function selection via the remote controller) 8.5.1 Function setting on the unit (Selecting the unit functions) 1) For wired remote controller [Fig. 8-21] (P .1 1) 1. Changing the external static pressure setting. • Be sure to change the external static pressure setting depending on the duct and the grill used. 1 Go to [...]
-
Page 22
22 9.1. Before test run After completing installation and the wiring and piping of the indoor and outdoor units, check for refrigerant leakage, looseness in the power supply or control wiring, wrong polarity , and no disconnection of one phase in the supply . Use a 500-volt megohmmeter to check that the resistance between the power supply terminals[...]
-
Page 23
23 9. T est run • If the unit cannot be operated properly after the above test run has been performed, refer to the following table to remove the cause. PLEASE W AIT PLEASE W AIT → Error code Display messages do not appear even when operation switch is turned ON (operation lamp does not light up). Symptom After LED 1, 2 are lighted, LED 2 is tu[...]
-
Page 24
24 10 . Maintenance 10.1. Gas charge [Fig. 10-1] (P .12) A Indoor unit B Union C Liquid pipe D Gas pipe E Stop valve F Outdoor unit G Refrigerant gas cylinder operating valve H Refrigerant gas cylinder for R410A with siphon I Refrigerant (liquid) J Electronic scale for refrigerant charging K Charge hose (for R410A) L Gauge manifold valve (for R410A[...]
-
Page 25
01_KB79U749H01_GB.p65 2011.10.26, 4:49 PM 25[...]
-
Page 26
01_KB79U749H01_GB.p65 2011.10.26, 4:49 PM 26[...]
-
Page 27
01_KB79U749H01_GB.p65 2011.10.26, 4:49 PM 27[...]
-
Page 28
KD79D905H0 2 Please be sure to put the cont act address/telephone number on this manual before handing it to the customer . HEAD OFFICE : TOKYO BLDG ., 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAP AN KD79D905H01_Back cover.fm Page 24 Fr iday, October 14, 201 1 10:11 AM[...]