Heatcraft Refrigeration Products H-IM-79E Bedienungsanleitung
- Schauen Sie die Anleitung online durch oderladen Sie diese herunter
- 36 Seiten
- 3.29 mb
Zur Seite of
Ähnliche Gebrauchsanleitungen
-
Refrigerator
Heatcraft Refrigeration Products SWN0075M2B
12 Seiten 1.8 mb -
Refrigerator
Heatcraft Refrigeration Products SWN0100H2C
12 Seiten 1.8 mb -
Refrigerator
Heatcraft Refrigeration Products SWN0090H2B
12 Seiten 1.8 mb -
Refrigerator
Heatcraft Refrigeration Products PST034L6B*
8 Seiten 1.05 mb -
Refrigerator
Heatcraft Refrigeration Products BN-PL0208
76 Seiten 3.33 mb -
Refrigerator
Heatcraft Refrigeration Products PRO3
24 Seiten 2.83 mb -
Refrigerator
Heatcraft Refrigeration Products SWN0300H2G
12 Seiten 1.8 mb -
Refrigerator
Heatcraft Refrigeration Products SWN0200M2D
12 Seiten 1.8 mb
Richtige Gebrauchsanleitung
Die Vorschriften verpflichten den Verkäufer zur Übertragung der Gebrauchsanleitung Heatcraft Refrigeration Products H-IM-79E an den Erwerber, zusammen mit der Ware. Eine fehlende Anleitung oder falsche Informationen, die dem Verbraucher übertragen werden, bilden eine Grundlage für eine Reklamation aufgrund Unstimmigkeit des Geräts mit dem Vertrag. Rechtsmäßig lässt man das Anfügen einer Gebrauchsanleitung in anderer Form als Papierform zu, was letztens sehr oft genutzt wird, indem man eine grafische oder elektronische Anleitung von Heatcraft Refrigeration Products H-IM-79E, sowie Anleitungsvideos für Nutzer beifügt. Die Bedingung ist, dass ihre Form leserlich und verständlich ist.
Was ist eine Gebrauchsanleitung?
Das Wort kommt vom lateinischen „instructio”, d.h. ordnen. Demnach kann man in der Anleitung Heatcraft Refrigeration Products H-IM-79E die Beschreibung der Etappen der Vorgehensweisen finden. Das Ziel der Anleitung ist die Belehrung, Vereinfachung des Starts, der Nutzung des Geräts oder auch der Ausführung bestimmter Tätigkeiten. Die Anleitung ist eine Sammlung von Informationen über ein Gegenstand/eine Dienstleistung, ein Hinweis.
Leider widmen nicht viele Nutzer ihre Zeit der Gebrauchsanleitung Heatcraft Refrigeration Products H-IM-79E. Eine gute Gebrauchsanleitung erlaubt nicht nur eine Reihe zusätzlicher Funktionen des gekauften Geräts kennenzulernen, sondern hilft dabei viele Fehler zu vermeiden.
Was sollte also eine ideale Gebrauchsanleitung beinhalten?
Die Gebrauchsanleitung Heatcraft Refrigeration Products H-IM-79E sollte vor allem folgendes enthalten:
- Informationen über technische Daten des Geräts Heatcraft Refrigeration Products H-IM-79E
- Den Namen des Produzenten und das Produktionsjahr des Geräts Heatcraft Refrigeration Products H-IM-79E
- Grundsätze der Bedienung, Regulierung und Wartung des Geräts Heatcraft Refrigeration Products H-IM-79E
- Sicherheitszeichen und Zertifikate, die die Übereinstimmung mit entsprechenden Normen bestätigen
Warum lesen wir keine Gebrauchsanleitungen?
Der Grund dafür ist die fehlende Zeit und die Sicherheit, was die bestimmten Funktionen der gekauften Geräte angeht. Leider ist das Anschließen und Starten von Heatcraft Refrigeration Products H-IM-79E zu wenig. Eine Anleitung beinhaltet eine Reihe von Hinweisen bezüglich bestimmter Funktionen, Sicherheitsgrundsätze, Wartungsarten (sogar das, welche Mittel man benutzen sollte), eventueller Fehler von Heatcraft Refrigeration Products H-IM-79E und Lösungsarten für Probleme, die während der Nutzung auftreten könnten. Immerhin kann man in der Gebrauchsanleitung die Kontaktnummer zum Service Heatcraft Refrigeration Products finden, wenn die vorgeschlagenen Lösungen nicht wirksam sind. Aktuell erfreuen sich Anleitungen in Form von interessanten Animationen oder Videoanleitungen an Popularität, die den Nutzer besser ansprechen als eine Broschüre. Diese Art von Anleitung gibt garantiert, dass der Nutzer sich das ganze Video anschaut, ohne die spezifizierten und komplizierten technischen Beschreibungen von Heatcraft Refrigeration Products H-IM-79E zu überspringen, wie es bei der Papierform passiert.
Warum sollte man Gebrauchsanleitungen lesen?
In der Gebrauchsanleitung finden wir vor allem die Antwort über den Bau sowie die Möglichkeiten des Geräts Heatcraft Refrigeration Products H-IM-79E, über die Nutzung bestimmter Accessoires und eine Reihe von Informationen, die erlauben, jegliche Funktionen und Bequemlichkeiten zu nutzen.
Nach dem gelungenen Kauf des Geräts, sollte man einige Zeit für das Kennenlernen jedes Teils der Anleitung von Heatcraft Refrigeration Products H-IM-79E widmen. Aktuell sind sie genau vorbereitet oder übersetzt, damit sie nicht nur verständlich für die Nutzer sind, aber auch ihre grundliegende Hilfs-Informations-Funktion erfüllen.
Inhaltsverzeichnis der Gebrauchsanleitungen
-
Seite 1
™ H-IM-79E JANUAR Y 201 1PartNo.25001401 Beacon II™ R efrigeration Sy s t em s Installationand OperationManual Replaces H-IM-79E (09/07) T ableofContents Beacon II™ Board Layout .....................................[...]
-
Seite 2
2 © 2007, Heatcraft Refrigeration Products LLC[...]
-
Seite 3
3 BeaconII™BoardLayout BEACONII™BOARD Defrost Heater Relay Evaporator Fan Relay LED Display Room Sensor Defrost Sensor Suction Sensor Suction Pressur e Expansion V alve Connection Selection Buttons 24V T erminal Block[...]
-
Seite 4
4 InstallationT ips • Use a minimum 18 gauge wire for all low voltage connections • The Beacon II board gets its 24 V AC power supply from a transformer mounted in the electrical end of each evaporator . On 208-240 volt systems the multi-tap transformer is shipped from our factory wir ed for 240 volts. If your supply voltage is 208 volt you [...]
-
Seite 5
5 The electric expansion valve and the suction temperatur e sensor on the suction line are factory installed. Care must be taken when brazing these lines at the evaporator . T oohighatemperaturemaydestroythese components.Heatabsorbingcompoundsor“wet rags”mustbeusedtoprotecttheelectric?[...]
-
Seite 6
6 Each Beacon II board power is supplied by a transformer in the evaporator on which it is mounted. Do not run any 24 V AC wires between Beacon II boards on the evaporators. Conguration CU M S S S M = Master Evaporator S = Slave Evaporator CU = Condensing Unit If there ar e multiple evaporators on a system, the program for each SLA VE evaporator[...]
-
Seite 7
7 BoxT emperatureControlSettings • There is an on boar d roomthermostat on the Beacon II board which can be adjusted to the desired r oom temperatur e. The temperature dif fer ential is 2° F . T emperatureDifferential When a system is in the cooling mode and the box setpoint is 35°F , the system will continue to cool unti[...]
-
Seite 8
8 CU M M = Master Evaporator CU = Condensing unit Start-UpOperation SingleSystemWith1Evaporator • Check all wiring connections to be sure they are corr ect and tight. • On the condensing unit - Check the setting of time delay relay . It should be set at 1 minute (the second marker). - Check the low pressur e switch setting on [...]
-
Seite 9
9 SingleSystemWithMultiple Evaporators • Check all wiring connections to be sure they are corr ect and tight. • On the condensing unit - Check the setting of time delay relay . It should be set at 1 minute (the second marker). - Check the low pressure switch setting on freezer units. It must be set to 0 psig cut-out, 10 psig cut-[...]
-
Seite 10
10 Start-UpOperation MultipleSystemsWithMultiple Evaporators (Requires A Smart Controller) • Check all wiring connections to be sure they are corr ect and tight. • On the condensing units - Check setting of time delay relay . It should be set at 1 minute (the second marker). - Check the low pressur e switch setting on[...]
-
Seite 11
1 1 InitialPowerOn At the initial application of power to the system, the compressor and the evaporator fans will be in a 4 minute hold-off cycle and will not start immediately . When there is a call for COOLING , the expansion valve (EEV) opens, then the compressor is started. The compr essor will then run for a minimum of 2 minutes in th[...]
-
Seite 12
12 Programming&Reviewing Programming AndReviewingSettings/Changes “PROGRAMREVIEW”ITEMS A-E - Set Defr ost type (Air or ELE) rEF - Set Refrigerant type (R22, R404A or R507) bot - Set Box temperatur e (-30°F to +70°F) SUP - Set Superheat (4°F to 20°F) SLA - Set Board as a Sla[...]
-
Seite 13
13 • Defrost T ype – “A-E”- Selection is made for air defrost or electric defr ost coil. This will automatically set the system factory defaults for air defrost and electric defr ost. (See default settings.) Please note that the refrigerant type default for air defrost is R-22 and for electric defrost it is R404A. All units ar e sh[...]
-
Seite 14
14 Programming&Reviewing FORCE DEFROST RESET TIME MONITOR FORCE SERVICE Usethe“MONITOR” button to review these items: SUP - Superheat (°F/°C) ESP - Expansion valve steps (0 to 255 steps) SCt - Suction temperatur e (°F/°C) SSt - Saturated Suction temperatur e (°F/°C) SCP - Suction pr essur e at Evap[...]
-
Seite 15
15 Programming&Reviewing LockingTheBeaconIIBoard The Beacon II board is lockable to pr event pr ogrammed setting changes by unauthorized personnel. When locked, the program setpoints cannot be changed. T o lock the setting: • Pr ess “ PROGRAMREVIEW ” button. • Pr ess and hold “ MONITOR ” button. • Whilehold[...]
-
Seite 16
16 ST A TUSINDICA TORLED • ERRORS E1 - Room temperature sensor shorted, open or not installed E2 - Defrost temperatur e sensor shorted, open or not installed E3 - Suction temperature sensor shorted, open or not installed E4 - Suction pressur e transducer shorted, open or not[...]
-
Seite 17
17 DefrostDelayStartTime Example: The system is rst powered up at 8:00 AM and is programmed for 4 defr ost per day . The user would like the rst defrost at 10:00 AM. T o accomplish this, use the “PROGRAMREVIEW” button to scroll to dFS . Use the “SELECTOR” switch to select 2 hours delay start, then press “ENTER.” The[...]
-
Seite 18
18 ElectricDefrostMode When a defrost is initiated, the EEV closes, the compressor is allowed to pumpdown and shut of f. The evaporator fans are cycled of f and the defr ost heaters are ener gized. On multiple evaporator systems, all controllers must terminate their defrost, either on temperatur e or fail-safe time, before the master contr[...]
-
Seite 19
19 ErrorIndicator Air Defrost fan motors must be wir ed thr ough the fan relay on the Beacon II boar d for this to be ef fective on Air Defrost systems. The entir e system will be shut of f and remain of f until the SPST switch is opened. Air Defrost evaporator fans ar e setup to run constantly . If there is a need to shut down the evaporator fa[...]
-
Seite 20
20 CheckingOperationOfExpansion V alve(EEV) T o check if the expansion valve is closing properly: Install a pressur e gauge-set to suction line at the condensing unit. With the system running, close the valve on the liquid line, at the con densing unit. The system should pumpdown and shut off on the Low Pr essur e switch (LPS). If[...]
-
Seite 21
21 PowerFailures In the event of a power failure Beacon II will automatically close the expansion valve to prevent refrigerant fr om migrating thr oughout the system. After power returns, with 24 V AC at the board, the system will restart in the cooling mode after the four -minute hold of f period. SpareSensorT erminals Beacon II pro[...]
-
Seite 22
22 SystemDefaults T able2.SystemDefaults P ARAMETERS CODE AIR ELECTRIC Refrigerant rEF R-22 R-404A Box T emperature bot 35°F -10°F Superheat SUP 8°F 8°F Slave Evaporator SLA No No No. of Defrost per Day dFn 2 4 Defrost Fail-safe time dFF 40 min. 30 min. Defrost End T emperatur e dFt 45°F 60°F Defrost Delay Start Ti[...]
-
Seite 23
23 InterLinkReplacementPartsList T able3.InterLinkReplacementPartsList P ARTDESCRIPTION P ARTNUMBER Beacon II Control Boar d 28910101 *T emperature Sensor kit – White Leads 89904902 T ransformers: 120/24 volt – 40 V A 22529601 240/24 volt – 40 V A 22529602 460/24 volt – 40 V A 22529603 575[...]
-
Seite 24
24 BeaconIIT roubleshootingGuide Diagnostics ExpansionV alveCapacity PartNumber V alve 100 BTUH 100 BTUH 100 BTUH 100 BTUH 29320003 ESVB-1 0.68 8160 0.64 7680 0.48 5760 0.42 5040 29320004 ESVB-4 3.27 39240 3.07 36840 2.31 27720 2.05 [...]
-
Seite 25
25 BeaconIIT roubleshootingGuide(continued) Diagnostics PartNumber V alve 100 BTUH 100 BTUH 100 BTUH 100 BTUH 29320003 ESVB-1 0.68 8160 0.64 7680 0.48 5760 0.42 5040 29320004 ESVB-4 3.27 39240 3.07 36840 2.31 27720 2.05 24600 293[...]
-
Seite 26
26 BeaconIIT roubleshootingGuide(continued) Master in out Slave 1 in out Slave 2 in out Slave 3 in out 1 2 3 in out Master in out Slave 1 in out Slave 2 in out 1 2 3 5 Slave 3 in out 4 Diagnostics BeaconIISmart Controller 4 PROBLEM Step ACTION ITEM IF OK IF NOT OK E9 Multi-out to Multi-in 1. Check for 24 volts power to the [...]
-
Seite 27
27 BeaconIIT roubleshootingGuide(continued) Diagnostics PROBLEM Step ACTION ITEM IF OK IF NOT OK 1. Check system operation: Is it running? 1. Check power to condensing unit Check position of Service Mode switches Check compressor overloads and contactor 2. Check system charge 2. Add or remove r efrigerant to proper char ge 3. Check for [...]
-
Seite 28
28 Wiring[...]
-
Seite 29
29 Wiring[...]
-
Seite 30
30 Wiring[...]
-
Seite 31
31 Wiring[...]
-
Seite 32
32 Wiring[...]
-
Seite 33
33 Wiring[...]
-
Seite 34
34 EV APORA TORS All evaporator units should be checked once a month or more often for pr oper defr osting because the amount and pattern of frosting can vary greatly . It is dependent on the coil temperature, the temperatur e of the r oom, the type of product being stor ed, how often new pr oduct is brought into the r oom and the per centage of[...]
-
Seite 35
35 ServiceRecord DateofStart-up Location Address CONDENSINGUNIT MODEL# SERIAL# COOLERUNIT MODEL# SERIAL# FREEZERUNIT MODEL# SERIAL# ELECTRICAL • Check Primary Supply voltage. If 208 V , change transformer wiring in the Cooler and Freezer to the 208 V tap YES • Check Compressor Amps for COOLER and FR[...]
-
Seite 36
Since product improvement is a continuing effort, we reserve the right to make changes in specications without notice. C L I M A T E C O N T R O L Commercial Refrigeration Parts The name behind the brands you trust. ™ RECORD OUTDOOR TEMPERA TURE ______°F SYSTEM VOL T AGE ______V olts ______PH ______Hz Cooler Compressor Amps ______L1 ______L2 [...]