American Power Conversion 400V manuel d'utilisation
- Voir en ligne ou télécharger le manuel d’utilisation
- 100 pages
- 2.13 mb
Aller à la page of
Les manuels d’utilisation similaires
-
Power Supply
American Power Conversion S20BLK
54 pages 0.4 mb -
Power Supply
American Power Conversion 480kW400V
32 pages 3.5 mb -
Power Supply
American Power Conversion SUDP10000I
24 pages 0.81 mb -
Power Supply
American Power Conversion MX06 100
37 pages 2.01 mb -
Power Supply
American Power Conversion 10-30 KVA
52 pages 2.94 mb -
Power Supply
American Power Conversion 3000VA 3U
25 pages 0.48 mb -
Power Supply
American Power Conversion 350 DC/AC
2 pages 0.53 mb -
Power Supply
American Power Conversion 1400VA XL
27 pages 0.73 mb
Un bon manuel d’utilisation
Les règles imposent au revendeur l'obligation de fournir à l'acheteur, avec des marchandises, le manuel d’utilisation American Power Conversion 400V. Le manque du manuel d’utilisation ou les informations incorrectes fournies au consommateur sont à la base d'une plainte pour non-conformité du dispositif avec le contrat. Conformément à la loi, l’inclusion du manuel d’utilisation sous une forme autre que le papier est autorisée, ce qui est souvent utilisé récemment, en incluant la forme graphique ou électronique du manuel American Power Conversion 400V ou les vidéos d'instruction pour les utilisateurs. La condition est son caractère lisible et compréhensible.
Qu'est ce que le manuel d’utilisation?
Le mot vient du latin "Instructio", à savoir organiser. Ainsi, le manuel d’utilisation American Power Conversion 400V décrit les étapes de la procédure. Le but du manuel d’utilisation est d’instruire, de faciliter le démarrage, l'utilisation de l'équipement ou l'exécution des actions spécifiques. Le manuel d’utilisation est une collection d'informations sur l'objet/service, une indice.
Malheureusement, peu d'utilisateurs prennent le temps de lire le manuel d’utilisation, et un bon manuel permet non seulement d’apprendre à connaître un certain nombre de fonctionnalités supplémentaires du dispositif acheté, mais aussi éviter la majorité des défaillances.
Donc, ce qui devrait contenir le manuel parfait?
Tout d'abord, le manuel d’utilisation American Power Conversion 400V devrait contenir:
- informations sur les caractéristiques techniques du dispositif American Power Conversion 400V
- nom du fabricant et année de fabrication American Power Conversion 400V
- instructions d'utilisation, de réglage et d’entretien de l'équipement American Power Conversion 400V
- signes de sécurité et attestations confirmant la conformité avec les normes pertinentes
Pourquoi nous ne lisons pas les manuels d’utilisation?
Habituellement, cela est dû au manque de temps et de certitude quant à la fonctionnalité spécifique de l'équipement acheté. Malheureusement, la connexion et le démarrage American Power Conversion 400V ne suffisent pas. Le manuel d’utilisation contient un certain nombre de lignes directrices concernant les fonctionnalités spécifiques, la sécurité, les méthodes d'entretien (même les moyens qui doivent être utilisés), les défauts possibles American Power Conversion 400V et les moyens de résoudre des problèmes communs lors de l'utilisation. Enfin, le manuel contient les coordonnées du service American Power Conversion en l'absence de l'efficacité des solutions proposées. Actuellement, les manuels d’utilisation sous la forme d'animations intéressantes et de vidéos pédagogiques qui sont meilleurs que la brochure, sont très populaires. Ce type de manuel permet à l'utilisateur de voir toute la vidéo d'instruction sans sauter les spécifications et les descriptions techniques compliquées American Power Conversion 400V, comme c’est le cas pour la version papier.
Pourquoi lire le manuel d’utilisation?
Tout d'abord, il contient la réponse sur la structure, les possibilités du dispositif American Power Conversion 400V, l'utilisation de divers accessoires et une gamme d'informations pour profiter pleinement de toutes les fonctionnalités et commodités.
Après un achat réussi de l’équipement/dispositif, prenez un moment pour vous familiariser avec toutes les parties du manuel d'utilisation American Power Conversion 400V. À l'heure actuelle, ils sont soigneusement préparés et traduits pour qu'ils soient non seulement compréhensibles pour les utilisateurs, mais pour qu’ils remplissent leur fonction de base de l'information et d’aide.
Table des matières du manuel d’utilisation
-
Page 1
Smart Distribution Panel with A TS InfraStruXur e Power Generation System 400V Operation Manual[...]
-
Page 2
This manual is available in English on the enclosed CD. Uživ atelská pøíruèka v èeštinì je k dispozici na pøiloženém CD. Dieses Handbuch ist in Deutsch auf der beiliegenden CD-ROM verfügbar . Deze handleiding staat in het Ne derlands op de bijgevoegde cd. Este manual está disponible en español en el CD-ROM adjunto. Ce manuel est dispo[...]
-
Page 3
Smart Distribution Panel with ATS i About This Manual Audience This manual is intended for end-users of the In fraS truXure Smart Distribution Panel with A TS. It provides important safety warnings and instructions, an overview of the A TS components, a detailed discussion of the A TS display interface, instructions on how to add comp onents to the[...]
-
Page 4
[...]
-
Page 5
Contents Smart Distribution Panel with ATS iii Safety ............................. ........................ ................. 1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Save these instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Safety symbols used in this man ual . . . . . [...]
-
Page 6
iv Smart Distribution Panel with ATS ATS Component Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Motorized switches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Automatic operation control panel . . . . . . . . . . . . . . . . . . . 16 User connection plate . . . . . . . . . . . . . . . . . . . . . . . . . .[...]
-
Page 7
v Smart Distribution Panel with ATS Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 View Test Log . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 Run/View Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 Test Schedule . . . . . . . . . . . . . . . . . . . . .[...]
-
Page 8
vi Smart Distribution Panel with ATS How to Access the ATS Network Management Interface . . . . . . 57 Web interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57 Telnet and SSH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58 SNMP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5[...]
-
Page 9
Smart Distribution Panel with ATS vii Appendix A: Custom Instal lations ........................... 83 If Source 2 is a Second Mains Connection . . . . . . . . . . . . . . . . 83 If Source 2 is a Generator that is Not an APC InfraStruXure Generator . . . . . . . . . . . . . . . . . . . . 84[...]
-
Page 10
[...]
-
Page 11
Smart Distribution Panel with ATS 1 Safety Over view Save these instru ctions This manual contains important instructions t hat must be followed during installation, operation, and maintenance of the Smart Distribution Panel with A TS. Safety symbols used in this manual C ro s s - re f e re n c e s y m b o l s u s e d i n t h i s m a n u a l El ec [...]
-
Page 12
2 Smart Distribution Panel with ATS Wa r n i n g s The componen ts in the InfraSt ruXure Power Generation System and UPS power distribution system can pose life-threatening danger when im properly installed, operated, or maintained. T o prevent accidents, be aware of the dangers and act safely . Read and follow all of the safety instructions and wa[...]
-
Page 13
Safety Smart Distribution Panel with ATS 3 This product and this manual were designed for the 250 -amp A TS. All wiring recommendations were sized for this amperage in accordance w ith IEC 60364-5-52. This does not prevent you from using the A TS at a lower curre nt with smaller wire sizes. If yo u decide to operate this A TS at a lower current, en[...]
-
Page 14
[...]
-
Page 15
Smart Distribution Panel with ATS 5 Over view InfraStruXur e Power Generation System The InfraStruXure Power Generation System consis ts of a diesel-powered generator and a Smart Distribution Panel with A TS. The A T S is connected to mains (Source 1) and the generator (Source 2), with mains as the preferred source. The A TS is d esigned for the da[...]
-
Page 16
6 Smart Distribution Panel with ATS How the InfraStruXur e Power Generation System Operates Operation of the A TS during a mains failure when auto matic operation is enabled T ypically , your data center equipment is powered by mains [Source 1] ( ), and the generator is off. When the Source 1 line quality is bad ( ), the A TS signals the ge[...]
-
Page 17
Overview Smart Distribution Panel with ATS 7 Generator start sequence The generator start sequence is followed only if the Crank setting in the Operati ng Settings menu on the Generator Settings screen on the A TS display interface menu is set to Ye s . If it is enabled, the following sequence will occur: After a start signal is initiated, either b[...]
-
Page 18
Overview 8 Smart Distribution Panel with ATS Open and closed transfers When a transfer is not occurring, one swit ch is ON and the second switch is OFF . During a closed transfer , the second switch will turn ON before the first switch turns OFF , creating a brief period of time when both switches are ON. During an open tr ansfer , the firs t switc[...]
-
Page 19
Overview Smart Distribution Panel with ATS 9 Fuel monitoring/runtime calcula tion Fuel monitoring is a unique feature of the Infra S truXure Power Generation System. Fuel level is monitored at the generator (if pu rchased through APC) and load is measured at the A TS. These measurements are used to calcula te runtime, as explained in the follo wing[...]
-
Page 20
[...]
-
Page 21
Smart Distribution Panel with ATS 11 Smart Distribution Panel with A TS Fr ont view , do or closed Tw e n t y knockouts are provided on the roof, the sides, and on the floor of the A TS for running mains and generator conductors and for di stributing power t o equipment in your da ta center . Connecting cable to the A TS does not require drilli[...]
-
Page 22
Overview 12 Smart Distribution Panel with ATS Fr ont view , door open The deadfront provides access to the panel board for maintenance an d wiring. The Source 1 input is controlled by the Sour ce 1 motorized switch. See “Motorized switches” on page 15 for more information on the operation of this switch. The automatic operation cont[...]
-
Page 23
Overview Smart Distribution Panel with ATS 13 A TS panel boar d, left side The handle aids the optional removal of the panel board from the A TS enclosure. Use at least two people to remove the panel board from the A TS enclosure. See the InfraS truXur e Power Generation System Installation Manual for instructions. Control power from Source[...]
-
Page 24
Overview 14 Smart Distribution Panel with ATS AT S p a n e l b o a rd , r i g h t s i d e Input conductors from th e mains connect to the Source 1 input switch . See the InfraS truXur e Power Generation System Installation Manual for connection instructions. WA R N I N G : O n l y a certified electrician should connect power to the A TS! Be[...]
-
Page 25
Smart Distribution Panel with ATS 15 A TS Component Details Motorized switches The operating lever indicates the present position of the switch [OFF ( ), trip, or ON ( ) ]. This lever is also used to operate the switch manually . See “Emergency Manu al Operation” on page 22 for proper operating procedures. Choose whether the mot[...]
-
Page 26
Overview 16 Smart Distribution Panel with ATS Automatic operation contr ol panel For a discussion of Automatic Operation of the InfraS truXure Power Generation System, see “Automatic Operation” on page 19. User connection plate For a description and the location of the user connection plate, see number 2 on page 1 1. For clarity , the user conn[...]
-
Page 27
Overview Smart Distribution Panel with ATS 17 A TS monitor ing unit This port connects to the Source 2 volt-sensing (S2 P T) circuit board, Source 1 volt-sensing (S1 P T) circuit board, Source 1 current transformers, and distribution panel volt-sensin g output circuit board. This port connects to th e A TS interface circuit board. The d[...]
-
Page 28
Overview 18 Smart Distribution Panel with ATS AT S l a b e l k i t A TS Label —Place this label on the outsi de of the A TS enclosure to identify the A TS, and to associate it with the appropriate source 1 and source 2. Source Label —Use a Sour ce 1 label at the primary mains breaker to identify the A TS that it is connected to. Use a Sour ce 2[...]
-
Page 29
Smart Distribution Panel with ATS 19 Operation Automatic Operation How to place the Inf raStruXur e Power Generatio n System in automa tic operation 1. Ensure that mains is availabl e. The generator w ill be signaled to start if mains is not available. 2. Ensure that the /Manual/Auto switch on the generator co ntrol panel is in the Auto positio[...]
-
Page 30
Operation 20 Smart Distribution Panel with ATS How to reset automatic operation on the ATS and on the generator Resetting auto matic operation on th e A TS. If the Not in Automatic Operation LED is lit and the Automatic Operation switch is in the Enable position, you need to reset aut omatic operation after the event that caused this condition has [...]
-
Page 31
Operation Smart Distribution Panel with ATS 21 Pr oblem—loss of automatic operation T ypically , th e Not In Automatic Operation LED tracks the state of the Automatic Operation switch (i.e., the LED is lit when the Automatic Operation switch is i n the Disable position). If the Not In Automatic Operation LED is lit while the Automatic Operation s[...]
-
Page 32
22 Smart Distribution Panel with ATS Emer gency Manual Operation Warning—befor e you op erate the A TS manually The procedures in this section only apply to situa tions where automa tic operation thro ugh the A TS is impossible. One example of such a situation is if the A TS monitori ng unit were not functioning. If automatic operation through th[...]
-
Page 33
Operation Smart Distribution Panel with ATS 23 How to power the load from the generator 1. Place the A T S Automatic Operation switch in the Disable position. 2. Ensure that the Source 2 switch on the A TS is OFF ( ). 3. At the generator: a. Place the /Manual/Auto switch on the generator control panel in the Manual position. b. Press the Ma[...]
-
Page 34
Operation 24 Smart Distribution Panel with ATS 5. T urn the Source 2 switch to ON ( ): a. Set the selector switch on the Source 2 switch to Manual . The operating lever will sw ing out when the selector switch is in Manual . b. T urn the Source 2 switch clockwise to ON ( ). Y ou can use the operating lever key (prov ided), for easier operat[...]
-
Page 35
Operation Smart Distribution Panel with ATS 25 How to r eturn to powering the load from mains 1. Ensure that the A TS Automatic Operation switch is in the Disable position. 2. Ensure that the Source 1 switch on the A TS is OFF ( ). 3. T urn the Source 2 switch on the A TS to OFF ( ): a. Set the selector switch on the Source 2 switch to Manu[...]
-
Page 36
Operation 26 Smart Distribution Panel with ATS 5. T urn of f the generator by following this procedure: a. Ensure that the /Manual/Au to switch on the generator control panel is in the Manual position. b. Press the Manual Run/S top button on the generator control panel. Pressing this button causes the generator to complete its normal shutdown s[...]
-
Page 37
Smart Distribution Panel with ATS 27 T otal Power Off T o reduce risk of electric shock or injury to pers ons, disconnect all sources of supply before servicing by following this procedure: 1. Set the A TS Automatic Operation switch to Disable . 2. Set the Source 1 switch on the A TS to OFF ( ): a. Set the selector switch on the Source 1 switch[...]
-
Page 38
Operation 28 Smart Distribution Panel with ATS 3. Set the Source 2 switch on the A TS to OFF ( ): a. Set the selector switch on the Source 2 switch to Manual . The operating lever will swing out when the selector switch is in Manual . b. T urn the Source 2 switch counterclockwise to OFF ( ). Y ou can use the o perating lever key (provided),[...]
-
Page 39
Smart Distribution Panel with ATS 29 Display Interface Over view Y ou can use the display interface to configure settin gs, set alarm thresholds, and provide audible and visual alarms. Load On LED When green, all output phases are within th e limits specified by the output alarm limit thresholds. Check Log [...]
-
Page 40
Display Interface 30 Smart Distribution Panel with ATS T op-level status screens After start-up, a the interface disp lays a brief introduction screen an d then scrolls automatically and continuously through five screens of basic status information. Press the Up and Down arrow keys to interrupt the automatic scrolling to view a specific status scre[...]
-
Page 41
Display Interface Smart Distribution Panel with ATS 31 Navigating thr ough scr eens T o open any screen, press the Up and Do wn arrow keys until the selector arrow ( rests next to your desired selection. Press the E NTER key to view the selected screen. When configuring settin gs, press the Up and Dow n arrow keys until the selector arrow ([...]
-
Page 42
32 Smart Distribution Panel with ATS Load-Meter T otal Load by Phase T otal Load Summary Power Factor Total Load by Phase Total Load Summary Power Factor Sub-Feed Monitoring For each phase ( L1 , L2 , L3 ) the following information is displayed: kV A The apparen t power provided, in kilo volt amps. Iout The output RMS load current. %LD The load as [...]
-
Page 43
Smart Distribution Panel with ATS 33 A TS/V oltage AT S P o s i t i o n S1-Utility ATS Position: S1 S1-Utility: OK S2-Generator: OFF ATS Setup One of the follow ing options is di splayed to de scribe the selected so urce: S1 The Source 1 switch is ON (closed). S ource 1 is connected to the output. S2 The Source 2 switch is ON (closed). S ource 2 is[...]
-
Page 44
Display Interface 34 Smart Distribution Panel with ATS S2-Generator One of the following is displayed to describe the condit ion of the input from Source 2. OK Source 2 is acceptable, as defined in the T ransfer Points men u. (The generator is running.) OFF The generator is not ru nning. BAD Source 2 is not acceptable, as defined in the T ransfer P[...]
-
Page 45
Display Interface Smart Distribution Panel with ATS 35 AT S S e t u p Press the E NTER key when the selector arrow rests at the A TS Setup item to change the following settings: T ransfer Points The point, when sen sing the volt age, that you would transfer to the other source. Based on voltage and frequency . • S1-Utility : The input voltage rea[...]
-
Page 46
Display Interface 36 Smart Distribution Panel with ATS A TS Blocking • T ransfer Blocking : Defines conditions that wil l pr event the A T S from transferring from Source 1 to Source 2. The followi ng is displayed on the Transfer Blocking screen: – Block T ransfer : Lists configured inpu t contacts that keep a transfer from occurring. – Map :[...]
-
Page 47
Smart Distribution Panel with ATS 37 Generator Generator Status Generator Status Fuel & Runtime Statistics & Maint. Generator Settings The following items are available on this menu: Generator S tatus One of the following conditions is disp layed to describe the Gen S tate: • Off : The generator is not running. • Cranking : The generato[...]
-
Page 48
Display Interface 38 Smart Distribution Panel with ATS • Maintenance Record : Scroll through a list of it ems that accumulate after the maintenance record is reset, including: – Last M aintenance Date – Op erating Days – Engi ne Starts – T otal kWh – T otal Runh ours • Next Maintenance : V iew the month an d year of the next scheduled[...]
-
Page 49
Smart Distribution Panel with ATS 39 Te s t i n g Vie w T est Lo g Run/View T es t View Test Log Run/View Test Test Schedule Test Duration Displays all logged test results in a scrolling list. For each item in the list, the screen lists the Gen S tart test and the Load T est resul ts with a date and time st amp of when the test occurred. Use this m[...]
-
Page 50
Display Interface 40 Smart Distribution Panel with ATS Te s t S c h e d u l e Te s t D u r a t i o n Use this menu to schedule a test in the future. Define Schedule Set the test schedule by changing the following param eters: • Gen S tart : Choose when to perform a generator start test. Choices are Never , Monthly , W eekly , or Daily . • Day :[...]
-
Page 51
Display Interface Smart Distribution Panel with ATS 41 How a test occurs When a test is not in progress, the A TS is waiting for a test to occur . Y ou initiate a test by scheduling a test on the T est Schedule screen on the display interface, or by starting a test immediately through the Run/V iew T est screen on the display interface. Once a test[...]
-
Page 52
42 Smart Distribution Panel with ATS Stats Statistics: 00 of 00 XX,XXXX Reset Reset All Name of statistic here Scroll through a list of items that accumulate after the sta tistics record is reset, including: • Open Xfer Count : The number of op en transfers since this statistic was reset. • Closed Xfer Count : The number of closed transfers sin[...]
-
Page 53
Smart Distribution Panel with ATS 43 Alarms Vie w A cti ve Al arm s V iew a list of all alarms th at exist presently . When an alarm is pres ent, the A TS display interface Alarm LED is red. Choosing this option to View Active Alarms turns the LED off. Alarm/Event Log Alarm Setup View Active Alarms Alarm/Event Log Alarm Setup Alarm Beeper The follo[...]
-
Page 54
Display Interface 44 Smart Distribution Panel with ATS Alarm Beeper Clearing latched alarms When an alarm is presen t, the A TS display interface Alarm LED is red. T o clear latched alarms, you must acknowledge them differently than all other alarms. The fo llowing are latched alarms: • T est Complete-Failed : The system has failed a self-test. ?[...]
-
Page 55
Smart Distribution Panel with ATS 45 Config System/Network System/Network Contacts & Relays Sub-Feed Config. Factory Defaults Manufacturer Data System ID Firmware Updates Electrical Config. The following items are available on this menu: System Password • Password : Change the system password requi red to access protected screens and fields i[...]
-
Page 56
Display Interface 46 Smart Distribution Panel with ATS Contacts & Relays The A TS can monitor external cont act closure events. Possible app lications include the followin g: • Magnetic contact switches • W indow foil • T amper switches • Heat detectors • W ater sensors • Pressure sensors • Building smoke and fire detection system[...]
-
Page 57
Display Interface Smart Distribution Panel with ATS 47 Electrical Config Factory Defaults Manufactur er Data System ID Firmwar e Updates The following items are available on this menu: V oltage The inp ut voltage rating for the A TS. Switch Ratin g The amperage rating of the A TS. Frequen cy The frequency rating of the A TS. DC Backup Whether the A[...]
-
Page 58
[...]
-
Page 59
Smart Distribution Panel with ATS 49 Communication Configuration A TS Management Options Overview Y ou have two management options for th e A TS. Y ou can manage the A TS along with the rest of your InfraStruXure equipment through the InfraStruXure Mana ger (AP C LAN), or you can manage yo ur A TS through APC’ s network management interfaces (Use[...]
-
Page 60
50 Smart Distribution Panel with ATS Configuring the InfraStruXur e Manager Connect the ATS to the InfraStruXur e Manager 1. Connect a Cat-5 ne twork cable to the surge-prot ected ethernet port on the A TS user connection plate. The arrow in the illustration below is poin ting to the port. The figure on page 1 1 shows the location of the user conne[...]
-
Page 61
Smart Distribution Panel with ATS 51 Configuring the A TS Network Management Interface Connect the A TS to your network 1. Connect a Cat-5 network cable to the surge-protected ethernet port on the A TS user connection plate. The arrow in the illustration below is poin ting to t he port. The figure on page 1 1 shows the location of the user connecti[...]
-
Page 62
Communication Configu ration 52 Smart Distribution Panel with ATS Configuration overview Y ou must configure the following TCP/IP settings before the A TS can operate on a network: • IP address of the A TS (only needed for manual address assignment) • Subnet mask • Default gateway TCP/IP configuration methods Use one of the following meth ods[...]
-
Page 63
Communication Configu ration Smart Distribution Panel with ATS 53 BOOTP & DHCP configuration The Boot Mode setting, a TCP/IP option in the A TS’ s Network menu, identifies how the TCP/IP settings will be defined. The possible settings are Manual , DHCP only , BOOTP only , and DHCP & BOOTP (the default setting). W ith Boot Mode set to DHCP[...]
-
Page 64
Communication Configu ration 54 Smart Distribution Panel with ATS DHCP . Y ou can use a RFC2131/RFC2132-compliant DHCP server to configure the TCP/IP settings for the A TS. 1. An A TS sends out a DHCP request tha t uses the following to identify itself: – A V endor Class Identifier (APC by default) – A Client Identifier (by default, the A TS’[...]
-
Page 65
Communication Configu ration Smart Distribution Panel with ATS 55 Local access to the control console Y ou can use a local computer that connects to the A TS through the console po rt on the A TS monitoring unit to access the control console. If you are accessing the A TS on the local control console, you will not receive any information about the [...]
-
Page 66
Communication Configu ration 56 Smart Distribution Panel with ATS – LINUX command format: ping 156.205.14.141 -s 113 3. Use T elnet to access the A TS at its newly ass igned IP address. For example: telnet 156.205.14.141 4. Us e apc for both User Name and Password . 5. See “Control console” on this page to finish the configuration. Contr ol c[...]
-
Page 67
Smart Distribution Panel with ATS 57 How to Access the A TS Network Management Interface We b i n t e r f a c e As your browser, you can use Microsoft ® Intern et Explorer 5.0 (and hig her) or Netscape ® 4. 0.8 (and higher , except Netsca pe 6. x ) to access the A TS through its W eb interface. Other commonly availa ble browsers also may work but[...]
-
Page 68
Communication Configu ration 58 Smart Distribution Panel with ATS Te l n e t a n d S S H Y ou can access the control console through T elnet or Secure SHell (SSH), depending on which is enabled. (An Administrator can enab le these access methods through the T e lnet/SSH option of the Network menu.) By default, T elnet is enabled. Enabling S SH auto[...]
-
Page 69
Communication Configu ration Smart Distribution Panel with ATS 59 FT P a n d S C P Y ou can use FTP (enabled by default) o r Secure CoPy (SCP) to transfer new firmware to the A TS, or to access a copy of the A TS’ s event logs. SCP provides the higher security of encrypted data transmission and is enabled auto matically when you enable SSH. T o a[...]
-
Page 70
60 Smart Distribution Panel with ATS How to Recover Fr om a Lost Network Management Interface Passwor d 1. Select a serial port at the local computer , and disable any service that uses that port. 2. Connect the serial cable (APC part number 940- 0103) to the selected po rt on the computer and to the console port on the AT S monitoring unit . 3. Ru[...]
-
Page 71
Smart Distribution Panel with ATS 61 Customizing and Updating the A TS How to Connect User Input Contacts and Relay Outputs to the A TS Overview The A TS can monitor external contact closure events. Possible applications include the following: • Magnetic contact switches • W indow foil • T amper switches • Heat detectors • W ater sensors [...]
-
Page 72
Customizing and Updating th e ATS 62 Smart Distribution Panel with ATS How to connect contacts to the ATS user connection plate T o conn ect and monitor your contacts: 1. Choose one or more contact numbers on the user connection plate to wh ich you will connect the contacts. (The user connection plate is connected to the User/EPO port on the A TS m[...]
-
Page 73
Smart Distribution Panel with ATS 63 How to Connect an EPO Switch to the A TS Overview Connecting the switch. The Emergency Power Off (EPO) switch connects to the A TS user connection plate. The figure on pa ge 1 1 shows the location of the user connection pla te on the roof of the A TS. Connect a switch to the user interface circuit board (shown a[...]
-
Page 74
Customizing and Updating th e ATS 64 Smart Distribution Panel with ATS Connect an EPO switch to t he user connection plate and test the switch 1. Connect the switch to the EPO connection point terminals located on the bottom side of the A TS user connection plate. Read the la bel next to th e terminal block to determine which terminals to connect t[...]
-
Page 75
Customizing and Updating th e ATS Smart Distribution Panel with ATS 65 3. T est the EPO switch to ensure that it is wired and working correctly: a. Place the Arm/T est rocker switch on the A TS monitoring unit in the Te s t position. The EPO state LEDs will be off and the A TS display in terface will show the following alarm (in addition to any oth[...]
-
Page 76
Customizing and Updating th e ATS 66 Smart Distribution Panel with ATS Safety warnings This Smart Distribution Panel with A TS is pr ovided with an Emergency Power Off switch connection. When this EPO switch is energized, el ectrical power to the units are de-engergized and the system will not transfer to on-battery operation. EPO can be achieved w[...]
-
Page 77
Smart Distribution Panel with ATS 67 How to Allow Easy Access to the A TS Display Interface The front door of the A TS has a Plexiglas plate prot ecting acces s to the switches, circuit breakers, and the display interface. If you want to preve nt access to the display interface th rough the opening in the front door , you can place the rectangle of[...]
-
Page 78
68 Smart Distribution Panel with ATS How to Add Sub-Feed Output Distribution Cir cuit Br eakers to the A TS Output distribution cir cuit br eakers available fr om APC El ec t ri cal Hd Only a certified electrician can add sub -feed output distribution breakers to the AT S . Part Number Description Width PG1P15A T1B 15 A, single-pole breaker , T1 fr[...]
-
Page 79
Customizing and Updating th e ATS Smart Distribution Panel with ATS 69 Determine the configuration of the panel Before you begin installing circui t breakers on the A TS distribution panel, be sure that you have enough space on the panel for the breakers that you want to install. Us e the information in the diagrams below to determine the final con[...]
-
Page 80
Customizing and Updating th e ATS 70 Smart Distribution Panel with ATS Pr eparing the br eakers for installation Before installing the breakers on the A TS panel boar d, follow the steps in this section for the breaker you are installing. The parts that are identified in th e illustrations below are included with your circuit breaker kit. Slide the[...]
-
Page 81
Customizing and Updating th e ATS Smart Distribution Panel with ATS 71 Parts and tools needed fo r install ation pr ocedur es T1, single-pole breaker assembly T1, single-pole module T1, single-pole breaker s M3 × 75 screws, washers, and ret ainers Breaker bracket s M6 × 12 T orx screws M4 × 15 screws and washers T1, three-pole breaker as sembly [...]
-
Page 82
Customizing and Updating th e ATS 72 Smart Distribution Panel with ATS Installing br eakers on the A TS panel boar d This procedure shows the installation of the T1, three-pole breaker asse mbly on a 250 A A TS panel board. The steps are identical for installing th e T1 single-pole and T3 three-pole breakers. 1. Attach the module to the A TS pa nel[...]
-
Page 83
Smart Distribution Panel with ATS 73 How to Update A TS Firmwar e The InfraStruXure Smart Distributio n Panel with A TS requires multiple files to be downloaded to update the firmware. Be sure to select all rele vant files from the APC website for download, and repeat this procedure for e ach of the firmware files. This section describes the instru[...]
-
Page 84
Customizing and Updating th e ATS 74 Smart Distribution Panel with ATS Downloading firmwar e upda tes fr om a local computer 1. Select a serial port at the local computer , and disable any service that uses that port. 2. Use the configuration c able to connect the se lected port to the console port on the A TS monitoring unit. 3. Run a terminal pr [...]
-
Page 85
Smart Distribution Panel with ATS 75 Specifications Smart Distribution Panel with A TS Electrical Current Rating 250 A V oltag e Class ~ 400/230 V V oltage A v ailable 230 V Rated Insulation V oltage (U i ) 500 V Rated Impulse V oltage (U imp ) 7000 V Maximum Power 172.5 kV A Frequency 50 Hz Nominal, ± 5 Hz Conditional Short Circuit Cu rrent (Icc)[...]
-
Page 86
Specifications 76 Smart Distribution Panel with ATS Physical Enclosure IP40; Raven black Access Control Key-locked door and fastener-locked deadfront, user -removable cover for user keypad/display , and password Installation and Wiring Mains Input Connection T ype 3 / N / PE Size of upstream mains circuit breaker 250 A Recommended wire size † 95 [...]
-
Page 87
Specifications Smart Distribution Panel with ATS 77 Environmental Operating T emperature Range –5 to 40 °C; The averag e temperat ure over a 24-hour perio d should not exceed 35°C. Operating Relative Humidity 5 to 95%, non-condensing Operating Elevation 0 to 2 000 m Storage T emperature R ange –25 to 55 °C; The av erage temperature over a 24[...]
-
Page 88
[...]
-
Page 89
Smart Distribution Panel with ATS 79 W arranty , Life-Support Policy , and Ser vice Wa r r a n t y APC warrants that all components of the InfraS truXure system will be free from defect i n material and workmanship for a period of two years from th e date of start up when start up has been performed by APC authorized service personnel*. If assembly[...]
-
Page 90
Warranty, Life-Suppo rt Policy, and Service 80 Smart Distribution Panel with ATS THERE ARE NO W ARRANTIES, EXPRESS OR IMPLIED, BY OPERA T ION OF LA W OR OTHER WISE, OF PRODUCTS SOLD, SER VICED, OR FURNISHED UNDER THIS AGREEMENT OR IN CONNECTION HEREWITH. APC DISCLAIMS ALL IMPLIED W ARRANTIES OF MERCHANT ABILITY , SA TISF ACTION AND FITNESS FOR A P [...]
-
Page 91
Smart Distribution Panel with ATS 81 Life-Support Policy As a general policy , American Po wer Conversion Corporation and its affiliates and subsidiaries worldwide (APC) do not recommen d the use of any of its products in life support applicati ons where failure or malfunction of the APC product can be reasonably expect ed to cause failure of the l[...]
-
Page 92
82 Smart Distribution Panel with ATS Service How to contact APC Customer support for this or any other APC product is available at no char ge in any of the following ways: • V isit the APC W eb site to access documents in the APC Knowledge Base and to submit customer support requests. – www .apc.com (Corporate Headquarters) Connect to localized[...]
-
Page 93
Smart Distribution Panel with ATS 83 Appendix A: Custom Installations If Sour ce 2 is a Second Mains Connection Differ ences in your system fr om information presented in this manual This manual assumes that Source 2 is an APC InfraStruXure Generator . If you have a secondary mains connected to the A TS, some of the information in this ma nual will[...]
-
Page 94
84 Smart Distribution Panel with ATS If Sour ce 2 is a Generator that is Not an APC InfraStruXur e Generator Differ ences in your system fr om information presented in this manual This manual assumes that Source 2 is an APC InfraS truXure Generator . If you have a generator other than an APC InfraStruXure generato r , some of the information in t h[...]
-
Page 95
Index Smart Distribution Panel with ATS 85 A Access panel, on panel bo ard , 13 – 14 Accessing the display interface , 67 Agency approvals , 77 Alarm beeper , 44 Alarm LED , 29 Alarm/event log , 43 Alarms clearing latched , 44 configuring limits , 43 – 44 viewing active , 43 Alarms screen , 43 – 44 Allow closed setting , 8 Arm/Test rocker swi[...]
-
Page 96
86 Smart Distribution Panel with ATS Generator status, where displayed , 37 Generator, non-APC , 84 Get set on LED , 29 H Handle, on panel board , 13 Humidity, for operation , 3 I InfraStruXure mana ger connecting and configu ring , 50 overview , 49 Input contacts configuring , 46 connecting to the ATS , 61 – 62 where connected , 16 Inspection w [...]
-
Page 97
Smart Distribution Panel with ATS 87 SNMP, for accessing the ATS , 58 Source 1 control transformer, location of , 13 Source 1 current transformer, location of , 14 Source 1 fuse block, location of , 13 Source 1 input switch, location of , 14 Source 1 lamp, location of , 12 Source 1 motorized switch, location of , 12 Source 2 if it is a utility main[...]
-
Page 98
[...]
-
Page 99
Radio Fr equency Interfer ence Not e Changes or modifica tions to this unit not ex pressly ap proved by the party responsible for compliance could void the user ’ s authority to operate this equipment. This is a Class A produc t. In a domestic environmen t, the product may cause radio interference, in which case, the user may be required to take [...]
-
Page 100
*990-2355-001* APC W orldwide Customer Support Customer support for this or any other APC produ ct is available at no char ge in any of the following ways: • V isit the APC W eb site to access documents in the APC Knowledge Base and to submit customer support requests. – www .apc.com (Corporate Headquarters) Connect to localized APC W eb sites [...]