Warning: mysql_fetch_array() expects parameter 1 to be resource, boolean given in /home/newdedyk/domains/bkmanuals.com/public_html/includes/pages/manual_inc.php on line 26
GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT manuale d’uso - BKManuals

GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT manuale d’uso

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107

Vai alla pagina of

Un buon manuale d’uso

Le regole impongono al rivenditore l'obbligo di fornire all'acquirente, insieme alle merci, il manuale d’uso GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT. La mancanza del manuale d’uso o le informazioni errate fornite al consumatore sono la base di una denuncia in caso di inosservanza del dispositivo con il contratto. Secondo la legge, l’inclusione del manuale d’uso in una forma diversa da quella cartacea è permessa, che viene spesso utilizzato recentemente, includendo una forma grafica o elettronica GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT o video didattici per gli utenti. La condizione è il suo carattere leggibile e comprensibile.

Che cosa è il manuale d’uso?

La parola deriva dal latino "instructio", cioè organizzare. Così, il manuale d’uso GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT descrive le fasi del procedimento. Lo scopo del manuale d’uso è istruire, facilitare lo avviamento, l'uso di attrezzature o l’esecuzione di determinate azioni. Il manuale è una raccolta di informazioni sull'oggetto/servizio, un suggerimento.

Purtroppo, pochi utenti prendono il tempo di leggere il manuale d’uso, e un buono manuale non solo permette di conoscere una serie di funzionalità aggiuntive del dispositivo acquistato, ma anche evitare la maggioranza dei guasti.

Quindi cosa dovrebbe contenere il manuale perfetto?

Innanzitutto, il manuale d’uso GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT dovrebbe contenere:
- informazioni sui dati tecnici del dispositivo GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT
- nome del fabbricante e anno di fabbricazione GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT
- istruzioni per l'uso, la regolazione e la manutenzione delle attrezzature GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT
- segnaletica di sicurezza e certificati che confermano la conformità con le norme pertinenti

Perché non leggiamo i manuali d’uso?

Generalmente questo è dovuto alla mancanza di tempo e certezza per quanto riguarda la funzionalità specifica delle attrezzature acquistate. Purtroppo, la connessione e l’avvio GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT non sono sufficienti. Questo manuale contiene una serie di linee guida per funzionalità specifiche, la sicurezza, metodi di manutenzione (anche i mezzi che dovrebbero essere usati), eventuali difetti GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT e modi per risolvere i problemi più comuni durante l'uso. Infine, il manuale contiene le coordinate del servizio GE in assenza dell'efficacia delle soluzioni proposte. Attualmente, i manuali d’uso sotto forma di animazioni interessanti e video didattici che sono migliori che la brochure suscitano un interesse considerevole. Questo tipo di manuale permette all'utente di visualizzare tutto il video didattico senza saltare le specifiche e complicate descrizioni tecniche GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT, come nel caso della versione cartacea.

Perché leggere il manuale d’uso?

Prima di tutto, contiene la risposta sulla struttura, le possibilità del dispositivo GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT, l'uso di vari accessori ed una serie di informazioni per sfruttare totalmente tutte le caratteristiche e servizi.

Dopo l'acquisto di successo di attrezzature/dispositivo, prendere un momento per familiarizzare con tutte le parti del manuale d'uso GE GE OSMONICS MILLENIUMTM REVERSE OSMOSIS UNIT. Attualmente, sono preparati con cura e tradotti per essere comprensibili non solo per gli utenti, ma per svolgere la loro funzione di base di informazioni e di aiuto.

Sommario del manuale d’uso

  • Pagina 1

    GE OSMONICS MILLENIUM™ REVERSE OSMOSIS UNIT Operation and Maintenance Manual SUPERCEDES P/N 14693 REV. D[...]

  • Pagina 2

    [...]

  • Pagina 3

    14693e A A 31 March 2003 MILLENIUM REVERSE OSMOSIS UNIT Installation, Operation and Maintenance Manual TABLE OF CONTENTS Page CHAPTER ONE: GENERAL INFORMATION 1-1 Section 1.1 The Manual 1-3 1.2 Safety Summary 1-3 1.3 Applications 1-4 1.4 Contraindications 1-4 1.5 Environmental Considerations 1-5 1.6 Theory of Operation 1-6 1.7 Fluid Components 1-7 [...]

  • Pagina 4

    14693e B B 31 March 2003 CHAPTER FOUR: ROUTINE MAINTENANCE 4-1 Section 4.1 4.1.1 Routine Maintenance of Millenium™ RO System Daily / Per Treatment Maintenance 4-3 4-3 4.1.2 Weekly Maintenance 4-4 4.1.3 Monthly Maintenance 4-4 4.1.4 Quarterly Maintenance 4-4 4.1.5 Semi-Annual Maintenance 4-5 4.1.6 Annual Maintenance 4-5 4.2 4.2.1 Specific Maintena[...]

  • Pagina 5

    14693e C C 31 March 2003 CHAPTER FIVE: TROUBLESHOOTING 5-1 Table of Content 5-3 Section 5.1 Unit Fails to Run 5-5 5.2 Unit Runs Intermittently 5-5 5.3 Motor Runs Hot 5-6 5.4 Water Produced While Unit is Off 5-6 5.5 Low Pump Pressure 5-7 5.6 Pressure Gauge Vibrates Erratically 5-7 5.7 Excess Product Pressure (too high) 5-7 5.8 Product Flow Too Low 5[...]

  • Pagina 6

    14693e D D 31 March 2003 This page intentionally left blank[...]

  • Pagina 7

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 1 General Information Millenium RO System CHAPTER ONE: GENERAL INFORMATION[...]

  • Pagina 8

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 2 General Information This page intentionally left blank.[...]

  • Pagina 9

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 3 General Information 1.1 The Manual This manual has been prepared to provide th e operator with inform ation and instructions regarding the installation, use, maintenan ce and troubleshooting of the GE Osmonics Millenium™ Reverse Osmosis System . CAUTION: When used as a medical dev[...]

  • Pagina 10

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 4 General Information SHOCK HAZARD: Connect this device to a proper ground c onnection in accordance with the National Electrical Code. DO NOT under any circum stances remove the ground wire or ground prong from any power plug. DO NOT use an exte nsion cord with this equipment. Keep t[...]

  • Pagina 11

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 5 General Information 1.5 Environmental Considerations Prior to the installation of the Millenium™ RO System, it will be necessary to provide utilities and create an environment suitable for the trouble free operation of the RO system and its accessories. POWER: The Millenium™ ope[...]

  • Pagina 12

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 6 General Information WATER PURITY: Plumbing materials can significantly contribut e to the contam ination of the water. Metallic pipes (with the exception of 316 stai nless steel) must be elim inated once the purification process has begun. Sche dule 40 or 80 PVC pipes, polypropylene[...]

  • Pagina 13

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 7 General Information 1.7 Fluid Components Inlet Solenoid: Located inside the Millenium™ RO at the inlet, and serves to shut off the water supply to the system, until it is actuated wh en the Inlet water valve switch is placed in the ON position. Pressure Adjust Regulator: Used to a[...]

  • Pagina 14

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 8 General Information Product Water Pressure: Product Water Pressure is read on a 0 to 100 PSI gauge on the front panel. Product pressures will register only when the product is back pressured (product hose removed from fitting or connected to dialysis unit). Product Recirculation Che[...]

  • Pagina 15

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 9 General Information 1.8 Monitors and Controls Inlet Water Valve Switch: The Inlet Water Valve Switch is mounted on the control panel. The switch is used to energize a solenoid, pressurizing the system with feed water. RO Pump Power Switch: The RO Pump Power Switch is mounted on the [...]

  • Pagina 16

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 10 General Information Product Port: The Product Port is a quick-disconnecti on port for the output of purified product water. The port has a check valve that closes when there is no hose connected to the fitting. Waste Port: The Waste Port is a quick-disconnection por t for the outpu[...]

  • Pagina 17

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 11 General Information 1.9 Optional Equipment GE Osmonics offers a number of optional item s to adapt the equipment to meet specific needs. Options are available to improve portability, and to im prove the quality of the feedwater to the RO. Frequently requested options are briefly de[...]

  • Pagina 18

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 12 General Information 1.10 Specifications: 1.10.1 Input Water Requirements M i n i m u m Maximum Input flow Rate 2.0 GPM N/A Temperature (water) 1.7°C (35°F) 32°C (90°F) NOTE : Operating at lower temperatures may m a ke it impossible for the Millenium ™ to produce adequate perm[...]

  • Pagina 19

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 13 General Information 1.10.4 Dimensions V e r t i c a l C a b i n e t Horizo ntal Cabinet Height 25 ½ inches 8 inches Depth 15 inches 15 inches Width 8 inches 25½ inches Weight – Operating – 55 lbs. 1.10.5 Membrane Performance Characteristics Salt rejection (TF Membranes): 95% [...]

  • Pagina 20

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 14 General Information 1.12 Electromagnetic Interference This equipment can generate, uses and can radiate radio frequency energy and, if not installed and used in accordance with these instructions, may cause harmful interference to other devices in the vicinity. However, there is no[...]

  • Pagina 21

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 15 General Information 1.14 Return Goods Authorization (RGA) Procedure If you wish to return goods for, warranty evaluation and/or credit please have your original sales order, invoice and device serial number available when you call GE Osmonics. Call GE Osmonics at (800)-633- 3080 an[...]

  • Pagina 22

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 16 General Information 1.15 Symbols and Abbreviations “RENALIN®” Refers to Peracetic Acid and Pe roxide-based Com pounds, such as Renalin®, Minncare™, Peracidin™ (20% peroxide, 4% Peracetic Acid) ASTM American Society for Testing and Materials AAMI Association for the Advanc[...]

  • Pagina 23

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 17 General Information MNPT Male National Pipe Thread MSDS Material Safety Data Sheet Megohm/cm Million Ohms/Centimeter mw Molecular Weight NaCl Sodium Chloride N/A Not Applicable NPT National Pipe Thread NSF National Sanitation Foundation PA Polyamide P/N P a r t N u m b e r ppm Part[...]

  • Pagina 24

    M Millenium™ RO System by GE Osmonics 14693e – 31 Mar 03 1 - 18 General Information NOTES:[...]

  • Pagina 25

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 2 - 1 Installation Guidelines and Instructi ons Millenium RO System CHAPTER 2: INSTALLATION GUIDELINES AND INITIAL SYSTEM START-UP[...]

  • Pagina 26

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 2 - 2 Installation Guidelines and Instructi ons This page intentionally left blank.[...]

  • Pagina 27

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 2 - 3 Installation Guidelines and Instructi ons 2.1 Installation Considerations 1. Select a location for the Millenium™ near the required utilities and dialysis equipment. 2. The RO unit requires 115 VAC power for operation and consumes 8 amps of current (the 230 VAC model consumes 5 am p[...]

  • Pagina 28

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 2 - 4 Installation Guidelines and Instructi ons valve allowing product flow. When the hose is disconnected, the product flow is stopped. 4. Make sure that the inlet water valve switch and the RO pump power switch are in the OFF position. Plug the power cord into a 115 VAC (230 VAC) grounded[...]

  • Pagina 29

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 2 - 5 Installation Guidelines and Instructi ons 10. Let the RO run for an additional 15 minutes or until the percent rejection and TDS values have stabilized. WARNING: Ensure that TDS and membrane perfor m ance (% rejection) are normal for the regions water quality. Consult your facility ph[...]

  • Pagina 30

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 2 - 6 Installation Guidelines and Instructi ons 2.3 Product Water Analysis Procedure: In order to ensure that the RO is performing at or above AAMI (Association for the Advancement of Medical Instrumentation) St andards, it is necessary to perform an AAMI Water Quality Analysis test. For ne[...]

  • Pagina 31

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 2 - 7 Installation Guidelines and Instructi ons This page intentionally left blank.[...]

  • Pagina 32

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 3 - 1 1 System Operation Millenium RO System CHAPTER 3: SYSTEM OPERATION[...]

  • Pagina 33

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 3 - 2 2 System Operation This page intentionally left blank.[...]

  • Pagina 34

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 3 - 3 3 System Operation 3.1 Daily Start-up WARNING: Verification of the absence of all sa nitizers, cleaners, disinfectants and chlorine/chloramines must be perform ed before RO product water is used for any patient related uses. 1. Connect the RO unit to the required utilities (feed water[...]

  • Pagina 35

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 3 - 4 4 System Operation 4. Briefly turn on the inlet water valve sw itch. This will release pressure from the feed water hose. When the pressure is released, turn the switch off. NOTE: If the Millenium™ RO is to be stored for more than 24 hours (RO not being operated), the RO should be s[...]

  • Pagina 36

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 3 - 5 5 System Operation NOTES:[...]

  • Pagina 37

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 3 - 6 6 System Operation This page intentionally left blank.[...]

  • Pagina 38

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 1 Routine Maintenance Millenium RO System CHAPTER FOUR: ROUTINE MAINTENANCE[...]

  • Pagina 39

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 2 Routine Maintenance This page intentionally left blank.[...]

  • Pagina 40

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 3 Routine Maintenance 4.1 Routine Maintenance of Millenium™ RO System GE Osmonics Millenium™ RO system s have been designed to operate with a minimum of operator attention. Like all mechanical system s they will operate longer and with less trouble when operator maintenance is perfor[...]

  • Pagina 41

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 4 Routine Maintenance 4.1.2 Weekly Maintenance 1. Observe, or measure, and record the waste and product flow rates on the operation log. Allow the water temperature to stabilize before attem pting to record the results. This will help prevent errors due to fluctuating temperature. 2. Obs[...]

  • Pagina 42

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 5 Routine Maintenance 4.1.5 Semi-annual Maintenance 1. Check and clean the Millenium™ cooling fan and grill. 2. Check the Product Recirculation check va lve for proper operation. Refer to the check valve test instructions in this chapter. 4.1.6 Annual Maintenance 1. An AAMI Water Quali[...]

  • Pagina 43

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 6 Routine Maintenance 4.2 Specific Maintenance Procedures and Instructions 4.2.1 Motor Lubricant Procedure 1. Remove the plastic plugs at both ends of the motor housing near the m otor shaft. 2. Add three drops of SAE 20 wt. non-detergent motor oil into the opening. 3. Replace the plasti[...]

  • Pagina 44

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 7 Routine Maintenance Tubing connections:[...]

  • Pagina 45

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 8 Routine Maintenance 1. Prior to performing this maintenance on any tube fitting, release any pressure on the tubing system (i.e., turn off the pump, open a drain port, etc.). 2. Remove the red locking clip (if applicable). 3. Push the dark gray collar in towards the body of fitting (li[...]

  • Pagina 46

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 9 Routine Maintenance 4.2.4 Product Recirculation Check Valve Test With Valve In RO Unit 1. Measure TDS of Product water using a handheld meter. If RO display and TDS measurement do not m atch within a small am ount, replace check valve. If values match, check valve is functioning correc[...]

  • Pagina 47

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 10 Routine Maintenance 4.3 Millenium™ Cleaning Indications Foulants such as minerals, silt and organic substances may collect on the RO m embrane surface and cause the RO membra ne to foul and diminish in its function. Many of these foulants are prevented by proper selection of pretrea[...]

  • Pagina 48

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 11 Routine Maintenance 4.3.1 Pre-Cleaning Preparation There are two types of cleaners available, a low pH cleaner (Calcium/Iron rem oval) and a high pH cleaner (Silt/Organics removal). GE Osm onics provides these cleaners in liquid form. The low pH cleaner attacks mineral scale deposits [...]

  • Pagina 49

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 12 Routine Maintenance CAUTION: Water to be used must be chlorine free or dam age to the RO membranes m ay result. 4. Turn the RO pump power and inlet water valve switches off. WARNING: Label machine with appropriate warning signs such as "Do Not Use / Contains Cleaner" to prev[...]

  • Pagina 50

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 13 Routine Maintenance output after the dwell time. 6. Place the waste hose back in the cleaning solution container. 7. Using the disinfect switch, turn the RO on and operate it for five minutes. 8. Remove the product and waste hoses fr om the cleaning solution tank and place them in the[...]

  • Pagina 51

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 14 Routine Maintenance 11. Turn the RO pump and inlet water valve switches OFF. Disconnect the product rinse line, and drain and store it. 12. Reconnect the product line to its original connection. 13. Remove the “Do Not Use/Contains Cleaner” warning label. 14. The Millenium™ RO sy[...]

  • Pagina 52

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 15 Routine Maintenance 4.3.2 BIOSAN™ Pre-Cleaning Preparation BIOSAN™ is a liquid cleaner/descaler agent intended for use in removing mineral scale and organic biofilm and is a short-term storage solution for RO water system s. CAUTION: BIOSAN™ is not intended for use in Hemodialys[...]

  • Pagina 53

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 16 Routine Maintenance 5. Connect the disinfect line quick-disconnect fitting to the disinfect port on the RO. Place the other (open) end of the line in the cleaning solution. 6. Connect the product rinse line to the product QD port and place the other end of the line in the cleaning sol[...]

  • Pagina 54

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 17 Routine Maintenance NOTE: Thin-film RO mem branes: The Millenium™ RO unit may be stored in BIOSAN™ for up to two weeks. 5. Remove the waste and product lines from the cleaning solution and place them in the drain. 4.3.2.3 BIOSAN™ Post-Cleaning Rinse Procedure 1. Using the disinf[...]

  • Pagina 55

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 18 Routine Maintenance 4.4 Millenium™ Disinfection Indications DETERMINATION OF MICROBIAL CULTURING AND DISINFECTION FREQUENCY IS THE RESPONSIBILITY OF THE OPERATING FACILITY. The following is recommended for critical app lications where bacteria and endotoxins are a major concern, suc[...]

  • Pagina 56

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 19 Routine Maintenance Label the machine with appropriate warni ng signs such as "Do Not Use / Contains Formaldehyde " to prevent use of the RO until it is properly rinsed. 4.4.1.1 Formaldehyde Pre-Disinfection Procedure 1. Turn the Millenium™ RO off. 2. Disconnect the RO sys[...]

  • Pagina 57

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 20 Routine Maintenance 4. Momentarily turn the inlet water valve switch on (approximately 5 seconds), then turn it off again. This allows the water to rinse the disinfectant from the disinfect line and quick-disconnect connection. WARNING: Failure to perform this step creates a potential[...]

  • Pagina 58

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 21 Routine Maintenance 11. Remove the warning signs from the RO only after a negative test confirm s the absence of formaldehyde. 12. The Millenium™ RO System is now ready for use. NOTE: Success of the disinfection procedure may be ascertained by taking a water culture after completion[...]

  • Pagina 59

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 22 Routine Maintenance 4.4.2 Peracetic Acid/Peroxide-Based Compounds (Renalin®) Disinfection Procedure Renalin®, Minncare™, Peracidin™ and others are trade names for compounds based on Peracetic Acid and Hydrogen Peroxide compounds, and are comm on in dialysis facilities. The produ[...]

  • Pagina 60

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 23 Routine Maintenance 4.4.2.1 Renalin® Pre-Disinfection Preparation CAUTION: When ‘RENALIN®’ is to be used as a di sinfectant, several preparatory steps are required by GE Osmonics as well as the mem brane manufacturer. Failure to comply with these instructions, which incorporate [...]

  • Pagina 61

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 24 Routine Maintenance 4.4.2.2 Renalin® Disinfection and Dwell Time 1. Verify that the operate/flush valve is in the OPERATE position. 2. Use the disinfect switch to circulate the solution through the system for five minutes. After three minutes of circulation, test the product line for[...]

  • Pagina 62

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 25 Routine Maintenance The operate/flush valve may need to be rotated partially closed, (towards the operate position) if the pump makes excessive noise. 6. Rotate the operate/flush valve to the operate position. 7. Turn the RO pump power switch off for 1 minute. Turn the RO pump switch [...]

  • Pagina 63

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 26 Routine Maintenance 4.5 Product Water Culture FREQUENCY : Once a month or more often, depending upon culture results, and unit protocol. We recomm end before and after disinfection. Materials Required: • Bucket or similar container • Sterile specimen container, such as Millipore ([...]

  • Pagina 64

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 27 Routine Maintenance 4.5.1 Product Water Culture Procedure This procedure assumes the RO is connected to power and water, and is in operating condition. 1. Connect the product rinse line to the product port. Place the other end in a drain. 2. Connect the waste line to the waste port. P[...]

  • Pagina 65

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 28 Routine Maintenance 4.6 System Storage This storage procedure has been established to store Millenium™ RO machines. It is not recommended that a unit be dorm ant longer than 24 hours without disinfectant. ROs that have been left unused for more than 24 hours risk the possibility of [...]

  • Pagina 66

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 29 Routine Maintenance 4.6.2 BIOSAN™ Storage Procedure WARNING: It is recommended that gloves (latex/vinyl and eye protection be worn when handling BIOSAN™. 1. Disinfect and rinse the RO with an acceptable disinfectant. 2. Follow the BIOSAN™ procedure in this chapter. 3. Do not rin[...]

  • Pagina 67

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 4- 30 Routine Maintenance NOTES:[...]

  • Pagina 68

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 1 Troubleshooting Millenium RO System CHAPTER FIVE: TROUBLESHOOTING[...]

  • Pagina 69

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 2 Troubleshooting This page intentionally left blank.[...]

  • Pagina 70

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 3 Troubleshooting Table of Contents SECTION TITLE PAGE 5.1 RO Fails to Run 5-5 5.2 RO Runs Intermittently 5-5 5.3 Motor Runs Hot 5-6 5.4 Water Produced While RO is Off 5-6 5.5 Low Pump Pressure 5-7 5.6 Pressure Gauge Vibrates Erratically 5-7 5.7 Excess Product Pressure (too high) 5-7 5.8[...]

  • Pagina 71

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 4 Troubleshooting This page intentionally left blank.[...]

  • Pagina 72

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 5 Troubleshooting 5.1 RO Fails to Run 1. Power off. a. Check position of inlet and pump switches. b. Check power cord (plugged in). c. Check outlet and circuit breaker/fuse panel for power with voltmeter. d. Check fuses in RO. 2. Improper line voltage. a. Verify that line and equipment v[...]

  • Pagina 73

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 6 Troubleshooting 2. Pump pressure too high. a. Adjust pressure at pump head. b. Check waste flow-path for obstruction. c. See 5.1.6 d. See 5.1.7 3. Thermal overload trips a. Verify line voltage and motor amperage draw. b. Disassemble pump/m otor at clamp and inspect coupler for wear. c.[...]

  • Pagina 74

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 7 Troubleshooting 5.5 Low Pump Pressure 1. No pressure develops above level of feed pressure. a. Verify motor operation and water line connections. b. Verify flush valve is in the operate position. c. Verify (lower than normal) flow fr om product, if high see mem brane problem. d. Verify[...]

  • Pagina 75

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 8 Troubleshooting 2. Product flow rate too high. a. Decrease pump operating pressure if above specifications. b. Feed water temperature too high. Reduce temperature or discontinue use of RO to prevent damage to mem branes. c. Damage or failure of mem brane has occurred, replace membranes[...]

  • Pagina 76

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 9 Troubleshooting 5.9 Product Flow Too High 1. Rejection Satisfactory A. Pump pressure too high. a. Adjust pressure regulator setting to specifications. B. Feedwater temperature too high. a. Adjust temperature blending valve. b. Correct plumbing error that allows the cold water to be hea[...]

  • Pagina 77

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 10 Troubleshooting 5.11 Low Percent Rejection The overall membrane perform ance can be a ffected by a number of factors. Poor rejection performance, as well as high TDS, can result from fouled m embranes, low pump pressure, inadequate waste flow, or feed water problems. An apparent perfo[...]

  • Pagina 78

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 11 Troubleshooting 5.12 TDS Value High The overall membrane perform ance can be a ffected by a number of factors. Poor rejection performance, as well as high TDS, can result from fouled m embranes, low pump pressure, inadequate waste flow, or feed water problems. An apparent performance [...]

  • Pagina 79

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 12 Troubleshooting 5.13 RO Fails to Draw Disinfectant 1. Pre-filter bowl leaking on vacuum. a. Tighten bowl b. Inspect and clean pre-filter bowl seal / replace seal. c. Replace filter bowl 2. Disinfect line kinked or plugged. a. Clear disinfect line. 3. Air leak on disinfect draw line. a[...]

  • Pagina 80

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 13 Troubleshooting NOTES:[...]

  • Pagina 81

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 5- 14 Troubleshooting This page intentionally left blank.[...]

  • Pagina 82

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 1 Drawings Millenium RO System CHAPTER SIX: DRAWINGS[...]

  • Pagina 83

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 2 Drawings This page intentionally left blank.[...]

  • Pagina 84

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 3 Drawings Millenium RO (Component Layout)[...]

  • Pagina 85

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 4 Drawings Millenium RO (Disinfect View)[...]

  • Pagina 86

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 5 Drawings Millenium RO (Flow Schematic)[...]

  • Pagina 87

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 6 Drawings INLET WATER VALVE SWITCH POWER SWITCH RO PUMP SWITCH DISINFECT SUPPLY POWER SOLENOID INLET PUMP MOTOR FAN 4 3 2 1 5 F3 7 8 9 10 6 1) POWER NOT AP PLIED. NOTES: F3 − 1/8 AMP SLO BLOW (50Hz ) F3 − 1/4 AMP SLO BL OW (60Hz) F1 − 8 AMP SLO BLOW F2 − 5 AMP SLO BLOW FUSE CAL[...]

  • Pagina 88

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 7 Drawings ALARM SET SWITCH CONDUCTIVITY PC BOARD DISPLAY PC BOARD PRODUCT WATER TDS % REJECTION PC BOARD SENSOR SENSOR SENSOR SONALERT CONDUCTIVIT Y INLET WATER PRODUCT WATER THERMISTOR POWER SUPPLY (% REJECTION) Millenium RO (Electrical Schematic, Low Voltage, 50/60Hz)[...]

  • Pagina 89

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 8 Drawings 1234687 (50Hz) 12315 (60HZ) 12315−1 (50HZ) ELECTRICAL CONTROL BOX ELECTRICAL CONTROL PANEL 12311 30010 1236062 (60Hz) 12310 30005 20203 20204 20205 12312 21080 Millenium RO (Electrical Layout)[...]

  • Pagina 90

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 9 Drawings 40569 1234678 Millenium RO (Input Manifold 50/60Hz)[...]

  • Pagina 91

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 10 Drawings 20178 40602 12131 14765 40569 40564 40218 Millenium RO (Main Manifold)[...]

  • Pagina 92

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 11 Drawings 40570 40218 40976 40976 40976 40976 40976 40218 14738 Millenium RO (Waste Manifold)[...]

  • Pagina 93

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 12 Drawings (NOT TO SCALE) DETAIL ’A’ OS1151581 Millenium RO (ROMA Assembly)[...]

  • Pagina 94

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 13 Drawings TO HOLE IN RO CABINET 41566 50112 41566 42014 14493 Millenium RO (Flush Valve Assembly)[...]

  • Pagina 95

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 14 Drawings 6. TURN ON WATER AND POWER AND THEN CHECK PRESSURE READING. R EPEAT AS NECESSARY. 4. USE SCREWDRIVER AND TURN SCR EW AS SHOWN. CLOCKW ISE TO INCR EASE PRESSURE, COUNTER CLOCKWISE TO DECREASE PRESSURE. EACH 90 ° ROTATION WILL CHAN GE PRESSURE ABOUT 25 PSI. WASHER PUMP ACORN [...]

  • Pagina 96

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 15 Drawings “Push-In” Fitting Instructions[...]

  • Pagina 97

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 16 Drawings This page intentionally left blank.[...]

  • Pagina 98

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 17 Drawings NOTES:[...]

  • Pagina 99

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 6 - 18 Drawings This page intentionally left blank.[...]

  • Pagina 100

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 7 - 1 Spare Parts List Millenium RO System CHAPTER SEVEN: SPARE PARTS LIST[...]

  • Pagina 101

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 7 - 2 Spare Parts List This page intentionally left blank.[...]

  • Pagina 102

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 7 - 3 Spare Parts List Millenium RO System SPARE PARTS LIST NOTE: Part Numbers are subject to change and should be verified when ordering spare parts. CATALOG NUMBER DESCRIPTION PARTS 42047 Check Valve, Feed Line 42047 Check Valve, Product Line 1228224 Check Valve, Product Return 1236062 Fu[...]

  • Pagina 103

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 7 - 4 Spare Parts List CATALOG NUMBER DESCRIPTION PARTS (cont.) 20203 Switch, Inlet Water Valve 20203 Switch, RO Pump Power 40574 Valve, Feed Water Solenoid, 110 V, 60 Hz 40739 Valve, Feed Water Solenoid, 220 V, 50Hz 42014 Valve, Operate/Flush 42014 Valve, Product 50003 Clamp, Pump to Motor[...]

  • Pagina 104

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 7 - 5 Spare Parts List 12128 Pre-filter Housing Assembly 40694 O-ring, Pre-filter (9 7/8”) 40695 Filter, 1 Micron, 9 7/8" 40696 Filter, 5 Micron, 9 7/8" 40698 Filter, Carbon, 9 7/8" 14924 Kit, Mil, Prefilter Install (Mounts prefilter to RO or to wall. Includes all necessary[...]

  • Pagina 105

    M Millenium™ RO System by GE Osmonics 14693e - 31 Mar 03 7 - 6 Spare Parts List NOTES[...]

  • Pagina 106

    [...]

  • Pagina 107

    Call (253) 395-2200 for additional information, (800) 633-3080 i n the U .S. , o r vis it www.osmonics.com Corporate Headquarters Kent Operations 5951 Clearwater Drive 7848 South 202 nd ST Minnetonka, MN Kent, W A 55343-8995 98032-1345 U S A U S A (952) 933 2277 Phone ( 253) 395-2200 Phone (952) 933-0141 Fax (253) 395-2363 Fax[...]