Xantrex Technology PV100S-208 manuale d’uso
- Visualizza on-line o scarica il manuale
- 124 pagine
- 3.44 mb
Vai alla pagina of
Manuali d’uso simili
-
Power Supply
Xantrex Technology SW Plus 4048
344 pagine 3.85 mb -
Power Supply
Xantrex Technology RS232-XT
62 pagine 0.54 mb -
Power Supply
Xantrex Technology ACCB
66 pagine 2 mb -
Power Supply
Xantrex Technology GT100E
40 pagine 0.24 mb -
Power Supply
Xantrex Technology XDC 80-150
284 pagine 6.29 mb -
Power Supply
Xantrex Technology XPL 30-1
36 pagine 0.61 mb -
Power Supply
Xantrex Technology XPR 600-10
80 pagine 2.08 mb -
Power Supply
Xantrex Technology XDC 150-40SL
36 pagine 1.49 mb
Un buon manuale d’uso
Le regole impongono al rivenditore l'obbligo di fornire all'acquirente, insieme alle merci, il manuale d’uso Xantrex Technology PV100S-208. La mancanza del manuale d’uso o le informazioni errate fornite al consumatore sono la base di una denuncia in caso di inosservanza del dispositivo con il contratto. Secondo la legge, l’inclusione del manuale d’uso in una forma diversa da quella cartacea è permessa, che viene spesso utilizzato recentemente, includendo una forma grafica o elettronica Xantrex Technology PV100S-208 o video didattici per gli utenti. La condizione è il suo carattere leggibile e comprensibile.
Che cosa è il manuale d’uso?
La parola deriva dal latino "instructio", cioè organizzare. Così, il manuale d’uso Xantrex Technology PV100S-208 descrive le fasi del procedimento. Lo scopo del manuale d’uso è istruire, facilitare lo avviamento, l'uso di attrezzature o l’esecuzione di determinate azioni. Il manuale è una raccolta di informazioni sull'oggetto/servizio, un suggerimento.
Purtroppo, pochi utenti prendono il tempo di leggere il manuale d’uso, e un buono manuale non solo permette di conoscere una serie di funzionalità aggiuntive del dispositivo acquistato, ma anche evitare la maggioranza dei guasti.
Quindi cosa dovrebbe contenere il manuale perfetto?
Innanzitutto, il manuale d’uso Xantrex Technology PV100S-208 dovrebbe contenere:
- informazioni sui dati tecnici del dispositivo Xantrex Technology PV100S-208
- nome del fabbricante e anno di fabbricazione Xantrex Technology PV100S-208
- istruzioni per l'uso, la regolazione e la manutenzione delle attrezzature Xantrex Technology PV100S-208
- segnaletica di sicurezza e certificati che confermano la conformità con le norme pertinenti
Perché non leggiamo i manuali d’uso?
Generalmente questo è dovuto alla mancanza di tempo e certezza per quanto riguarda la funzionalità specifica delle attrezzature acquistate. Purtroppo, la connessione e l’avvio Xantrex Technology PV100S-208 non sono sufficienti. Questo manuale contiene una serie di linee guida per funzionalità specifiche, la sicurezza, metodi di manutenzione (anche i mezzi che dovrebbero essere usati), eventuali difetti Xantrex Technology PV100S-208 e modi per risolvere i problemi più comuni durante l'uso. Infine, il manuale contiene le coordinate del servizio Xantrex Technology in assenza dell'efficacia delle soluzioni proposte. Attualmente, i manuali d’uso sotto forma di animazioni interessanti e video didattici che sono migliori che la brochure suscitano un interesse considerevole. Questo tipo di manuale permette all'utente di visualizzare tutto il video didattico senza saltare le specifiche e complicate descrizioni tecniche Xantrex Technology PV100S-208, come nel caso della versione cartacea.
Perché leggere il manuale d’uso?
Prima di tutto, contiene la risposta sulla struttura, le possibilità del dispositivo Xantrex Technology PV100S-208, l'uso di vari accessori ed una serie di informazioni per sfruttare totalmente tutte le caratteristiche e servizi.
Dopo l'acquisto di successo di attrezzature/dispositivo, prendere un momento per familiarizzare con tutte le parti del manuale d'uso Xantrex Technology PV100S-208. Attualmente, sono preparati con cura e tradotti per essere comprensibili non solo per gli utenti, ma per svolgere la loro funzione di base di informazioni e di aiuto.
Sommario del manuale d’uso
-
Pagina 1
PV100S 100 kW Grid-Tied Photovoltaic Inverter Operation and Maintenance Manual PV100S-208 PV100S-480[...]
-
Pagina 2
[...]
-
Pagina 3
s PV100S 100 kW Grid-Tied Photovoltaic Inverter Operation and Maintenance Manual[...]
-
Pagina 4
About Xantrex Xantrex T echnology Inc . is a worl d-leading su pplier of adva nced power electronics and controls with products from 50 watt mobile units to one MW utility-scale systems for wind, solar , batteries, fuel cells , microturbines, and backup power applications in both gri d-connected and stand-alon e systems. Xan trex products include i[...]
-
Pagina 5
152379 Rev C iii About This Manual Purpose The purpose of this Operation and Maintenance Manual is to provide explanations and procedures for operating , maintaining, and troubleshootin g the PV100S 100 kW Grid-T ied Photovoltaic Inverter. Insta llation instructions are available in the PV100S 100 kW Grid-tied Photovoltaic Inverter Planning and Ins[...]
-
Pagina 6
About T his Manu al iv 152379 Rev C Conventions Used The following conventio ns are used in this guide. This Manual contains information for two models of th e PV100S 100 kW Grid- T ied Photovoltaic Inverter. One model is designed to operate with a 208 V ac utility input, and the other model is designed to operate with a 480 V ac utility input. •[...]
-
Pagina 7
About T his Manual 152379 Rev C v Abbreviations and Acronyms Related Information Y ou can find more information about Xa ntrex T echnology Inc. as well as its products and services at www .xantr ex.com. ANSI American Natio nal Standards Institute CCU2 Converter Contro l Unit 2 CFM Cubic Feet per Minute CW Clockwise DSP Digital Signal Processor FPGA[...]
-
Pagina 8
vi[...]
-
Pagina 9
152379 Rev C vii Important Safety Instructions SA VE THESE INSTRUCTIONS - DO NO T DISCARD This manual contains imp ort ant safety instructions for the PV100S that must be followed during installa tion and maintenance pro cedures. W ARNING: Shock Hazard Read and keep this Operation and Maintenance Manual for future reference. Before installing PV 10[...]
-
Pagina 10
Safety viii 152379 Rev C General Safety Pr ecautions 1. When installing the PV100S use only components re commended or sold by Xantrex. Doing otherwise may result in a risk of fire, electric shock, injury to persons, and will void the warranty . 2. Do not attempt to operate the PV100S if it has been drop ped, or received more than cosmetic damage d[...]
-
Pagina 11
Safety 152379 Rev C ix The terminals are one bolt per pole. See the P V100S 100 kW Grid-tied Photovoltaic Inverter Planning and In stallation Manual for the location of these terminals . 5. The AC power conduc tor wiring interf acing with the AC terminals in the Main Inverter Enclosure are located at TB4-A, TB4-B, and TB4- C. These terminals are to[...]
-
Pagina 12
Safety x 152379 Rev C Operational Safety Pr ocedures Never work alone when servici ng this equipment. A team of two is required until the equipment is properly de-energized, locked-out and tagged, and verified de- energized with a meter . Thoroughly inspect the equipment prior to en ergizing. V erify that no tools or equipment have inadverte ntly b[...]
-
Pagina 13
Safety 152379 Rev C xi De-Energize/Isolation Pr ocedure The following procedure should be followed to d e-energize the PV100S for maintenance. T o isolate the PV100S: 1. T urn th e O N /O FF switch to the O FF position. 2. Open the DC Interface Disconnect Switch. 3. Open the AC Interface Disconnect Switch. 4. Open the utility connection circuit bre[...]
-
Pagina 14
xii[...]
-
Pagina 15
152379 Rev C xiii Important Safety Instructions - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - vii 1 Introduction Operation Features- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1– 2 Fixed Unity Power Factor Operation - - - - - - - - - - - - - - -[...]
-
Pagina 16
Contents xiv 152379 Rev C 2 Operation Description of System Operation- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2–2 Overview - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2–2 Faults - - - - - - - - - - - - - - - - - - - - - - - - - -[...]
-
Pagina 17
Contents 152379 Rev C xv 3 Commissioning Commissioning Procedure - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–2 Starting the Commissioning Test File - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–2 Serial Number - - - - - - - - - - - - - - - - - - - - - - [...]
-
Pagina 18
Contents xvi 152379 Rev C A Specifications System Specifications - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - A–2 Environmental Specifications - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - A–2 Electrical Specifications - - - - - - - - - - - - - - - [...]
-
Pagina 19
152379 Rev C xvii Figure 1-1 Maximum Peak Power Trackin g - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–4 Figure 1-2 PV100S Major Compon ents - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–6 Figure 1-3 DC Interface Enclosure - - - - - - - - - - - - - - - - - - - - - - - - - - [...]
-
Pagina 20
F igures xviii 152379 Rev C Figure 2-24 Connectio n Configuration Screen - General - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -2–35 Figure 2-25 Connectio n Configuration Screen - Telephone Fault Configuration - - - - - - - - - - - - - -2–36 Figure 2-26 Connectio n Configuration Screen - General - - - - - - - - - - - - - - - - - -[...]
-
Pagina 21
152379 Rev C xix Table 2-1 Scrolling through the Read Menu Parameters - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2–9 Table 2-2 Read Menu Descriptions - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2–11 Table 2-3 Data Logging Menu - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - [...]
-
Pagina 22
xx[...]
-
Pagina 23
1 Intr oduction Chapter 1, “Introduction” contains information about the features and functions of the PV100S 100 kW Gr id-T ied Photovoltaic Inverter.[...]
-
Pagina 24
Introduction 1–2 152379 Rev C Operation F eatures The PV100S 100 kW Grid-T ied Photovoltaic Inverter is a UL 1741 listed, utility interactive, three-phase power conversion system for grid-connected photovoltaic arrays with a power rating of 10 0 kW . Design ed to be easy to install and operate, the PV100S automates start-up, shutdown, and fault d[...]
-
Pagina 25
Operation F eatures 152379 Rev C 1–3 P eak P ower T racking An advanced, field-proven, Maximum P eak Power T racker (MPP T) algorithm integrated within the PV100S contro l software ensures the optimum power throughput for ha rvesting ener gy from the photovoltaic array . The peak power voltage point of a PV array can v ary , p r imarily depending[...]
-
Pagina 26
Introduction 1–4 152379 Rev C Optimization of the PV100S MPP T will result in an increase in energy production. The user is encouraged to study the PV array’ s I-V curves and to adjust the MPP T user settable parameters accordingly . Utility V oltage/Frequency F ault Automatic Reset In the event of a utility voltage or frequen cy excursion outs[...]
-
Pagina 27
Safety F eatures 152379 Rev C 1–5 Safety F eatures Anti-Island Protection A condition referred to as "Islanding" occurs when a distributed generation source (such as the PV100S Grid-tied Photovoltaic Inverter) co ntinues to ener gize a portion of the utility grid af ter the utility experiences an interruption in service. This type of co[...]
-
Pagina 28
Introduction 1–6 152379 Rev C Physical Characteristics The PV100S comes in two m odules comprised of six enclosures to house the electronics described above. The firs t module includes the Main Inverter Enclosure, Inductor Enclosure, DC In terface Enclosure, and Communications Enclosure. The second module includ es the T ransformer Enclosure and [...]
-
Pagina 29
Physical Characteristics 152379 Rev C 1–7 Main Inverter Enclosure The PV100S Main Inverter Enclo sure is NEMA-3R rated and contains the power distribution panel, the converter control unit (CCU2), and power electronics matrix. Also found within the Main Inve rter Enclosure are some of the system protection devices (such as the sense and control p[...]
-
Pagina 30
Introduction 1–8 152379 Rev C DC Interface Enclosure The DC Interface Enclosure is NEMA -3R rated. The DC interface serves as the connection interface between the PV arra y and the PV10 0S. This enclosure is where the DC Disconnect Switch and DC contactor reside. T ransformer Enclosure The T ransformer Enc losure is NEMA-3R ra ted. The main isola[...]
-
Pagina 31
Physical Characteristics 152379 Rev C 1–9 Communications Enclosure The Communicati ons Enclosure is NEMA-4 rated. It contains the hardware to enable a personal computer to connect to the unit, either directly or remotely . Hardware could include a POTS Connect K it, a W ireless Conn ect Kit, or an Ethernet LAN kit, or a Direct Connect Kit. Figure[...]
-
Pagina 32
Introduction 1–10 152379 Rev C Operator Interface Contr ols Operator interface controls are located on the front door of the main inverter enclosure. These controls include an ON/OFF Switch, 4-line LCD display and keypad called the Universal Frontpanel Control Unit (UFCU). Additionally there is an AC and DC Disconnect on the AC Interface Enc losu[...]
-
Pagina 33
Operator Interface Controls 152379 Rev C 1–11 On/Off Switch The PV100S incorporates a maintained position O N /O FF switch located on the front door of the main enclosure. Under normal conditions, the ON / OFF switch is in the O N position. T urning the switch to the O FF position will initiate an immediate controlled shutdown of the PV100S and o[...]
-
Pagina 34
Introduction 1–12 152379 Rev C A C and DC Disconnect Switches Both AC and DC interface enclosures are equipped with lockout hasps for personnel safety . The enclosure doors sh ould not be opened while the PV100S is operating. The switch handles and shafts provide a door interl ock for both the AC and DC interface enclosures. The doors cannot be o[...]
-
Pagina 35
Communication F eat ures 152379 Rev C 1–13 System Status and F ault Reporting Basic system status and all fault co nditions rising from within the PV100S are reported to the UFCU. The unit stores the time and details of all faults in non-volatile memory . The 4-line LCD w ill display a hexadecimal value and a brief text description of the fault. [...]
-
Pagina 36
Introduction 1–14 152379 Rev C Communication Methods The PV100S communicates system status information to the user using the following methods. • The Front Panel Control Unit (UFCU) Display • PC Connection (Direct or Remote) - Xantrex Solar Graphic User Interface (GUI) Software required. Communicatio n with a PC requires the selection of one [...]
-
Pagina 37
Communication Methods 152379 Rev C 1–15 PC Connection Methods Personal computers can be used to ac ces s the system status and programming features of the PV100S. A computer can be connected either directly or remotely . 1. Remote Connect - uses one of the three kits below . • POTS Kit - uses a MultiT ech® 56 K Modem, RS232/Fiber Optic Convert[...]
-
Pagina 38
Introduction 1–16 152379 Rev C PO TS Access Figure 1-1 1 illustrates the PV100S connec ted remotely to a personal computer . Wir eless Access Figure 1-12 illustrates the PV100S connect ed remotely to a personal computer using a wireless network. Figure 1-11 PO TS Access Figure 1-12 Wireless Access[...]
-
Pagina 39
Communication Methods 152379 Rev C 1–17 Ethernet LAN Access The PV100S can be remotely accessed through a local area network. Direct Access Figure 1-14 illustrates the PV100S connect ed directly to a personal computer . Figure 1-13 Ethernet LAN Access Figure 1-14 Direct Access[...]
-
Pagina 40
Introduction 1–18 152379 Rev C GUI Software F eatures Read-only Menu The GUI software provides access to the following “Read-only Menu” information. See T able 2-2, “Read Menu Descriptions” on page 2–1 1 for a specific list of available parameters. • Operational V alues • Internal Metrics W rite-Menu The GUI software provides contro[...]
-
Pagina 41
2 Oper ation Chapter 2, “Operation” contains in formation on the ba sic operation of the PV100S 100 kW Grid-T ie d Photovoltaic Inverter.[...]
-
Pagina 42
Operation 2–2 152379 Rev C Description of System Operation Overview The PV100S is a fully automated grid-interactive photovoltaic inverter . System startup, system shutdown, PV power tracki ng, and fault detectio n scenarios are all governed and monitored by the CCU2 co ntroller within the PV100S. Manual interaction or control of th e inverter is[...]
-
Pagina 43
Description of System Operation 152379 Rev C 2–3 Figure 2-1 Operating States Flow Chart INIT IA LIZING PV contactor opened. Inve rter ma trix off. Grid c ontac tor open. Green LED on. Red off . POWER UP KEY DISABLE PV c ontac tor o pen. Inve rter ma trix off. Grid c ontac tor open. System State: Key Disable Inverter State: Standby PV State: Sleep[...]
-
Pagina 44
Operation 2–4 152379 Rev C Operating States A state machine implemented within th e CCU2 control software governs the operation of the PV100S with clearly de fined transitions between its operatin g states. There are five steady-state operating states and numerous intermediate transition states. • Power T racking • T ransition •S h u t d o [...]
-
Pagina 45
Operating States 152379 Rev C 2–5 Shutdown The line interface controller is idle. The CCU2 monitors the status of the PV array and utility grid, waiting in standby until the PV array is available to produce power to the grid. Fa u l t The PV100S has encountered a fault conditi on. When this happens, regardless of the PV100S state of operation, th[...]
-
Pagina 46
Operation 2–6 152379 Rev C Operator Interface The purpose of the operator interface is to provide a mean s of co mmunicating critical operational information to and fro m the unit. This co mmunication oc curs between the operator and the UFCU Ke ypad and LCD display or between the operator and a personal co mputer running the Xantrex Solar GUI so[...]
-
Pagina 47
Operator Interface 152379 Rev C 2–7 LCD Display - Initialization Screen Any time AC power is applied to the unit, the LCD display will cycle through the following displays while th e system initializes. Once it’ s done w ith this process, the standard display will appe ar . Standard Display The Standard Display provides the following informatio[...]
-
Pagina 48
Operation 2–8 152379 Rev C Menu Structure The operator interface co nsists of three levels: • R EAD Menu - operation information provided to the user fr om the PV100S. The Read Menu consists of a ll operational values, the date and time. These can be viewed any time the PV100S has control power . • W RITE Menu - operational parameters provide[...]
-
Pagina 49
Operator Interface 152379 Rev C 2–9 R EAD Menu The R EAD Menu includes the following information: • Current Operating State or Goal S ta te • Fault Code (if applicable) • Inverter State • Line V oltage and Current • Inverter Matrix T emperature •I n v e r t e r P o w e r •P V S t a t e • PV V oltage and Current • PV Power • Gr[...]
-
Pagina 50
Operation 2–10 152379 Rev C Figure 2-5 Scrolling through the Read Me nu System: PWR Tracking Inv: Online Hit ENTER or "." "-" Value by ID# System: PWR Tracking Inv: Online Pv: Online Goal : PWR Tracking System: PWR Tracking Inv: Online Pv: Online CCU Vx.xx FP Vx.x System: PWR Tracking Inv: Online Pv: Online Feb-14-2005 10:01:5[...]
-
Pagina 51
Operator Interface 152379 Rev C 2–11 T able 2-2 Read Menu Descriptions Operational P arameter Description ID Units Current Operating State Displays as: System: * where * can be any one of the states listed in the descrip tion for this parameter . Current system states include the following. Initializing (0) Key-disabled (1) Shutdown (2) Starting [...]
-
Pagina 52
Operation 2–12 152379 Rev C Inverter Real Power Displays as: INV KW: Inverter Real Power 1 1 kW Inverter Matrix T emperature Displays as: INV Temp: T emperature of the Inverter IGBT matrix h eatsink 12 ° C PV State Displays as: PV: * where * can be any one of the states listed in the descrip tion for this parameter . PV States include the follow[...]
-
Pagina 53
Operator Interface 152379 Rev C 2–13 R EAD -by-ID The Read-by-ID feature supports the ability of the user to view any Read or W rite parameter available within the menu struct ure. It also provides a means to view data logging and accumulated values inform ation. See T able 2-2 for a list of the Read Menu parameters. See T able 2-3 for a list of [...]
-
Pagina 54
Operation 2–14 152379 Rev C T able 2-3 provides a list of the Data Logging Me nu parameters. T able 2-4 provides a list of the Accumulated V alues Menu parameters. T able 2-3 Data Logging Menu ID# Usage 300 Data Log Daily Rate in Minut es 301 ID# of 1st param eter to be lo gged 302 ID# of 2nd parameter to be logged 303 ID# of 3rd parameter to be [...]
-
Pagina 55
Operator Interface 152379 Rev C 2–15 W RITE Menu The W RITE Menu includes the fo llowing parameters: • Ground Current Max • PP T V oltage Ref erence • PV V oltage S tart • PV T ime (Start and Stop) • PV Power Stop • PP T Current Max % • Manual Current % •P P T E n a b l e • PP T Update Rate and V oltage S tep T able 2-5 provides[...]
-
Pagina 56
Operation 2–16 152379 Rev C Changing and Displaying W RITE Menu P arameter V alues Follow the procedure below to change W RITE Menu parameters. To c h a n g e W RITE Menu parameters: 1. From the standard display or anywhere in the R EAD Menu, you may access the W RITE menu para meters by pressing the < M ENU > key . This will ask for a pass[...]
-
Pagina 57
Operator Interface 152379 Rev C 2–17 Minimum Grid Vo l t a g e Displays as: Min AC Volts%: This parameter sets th e trigger point value for “AC voltage lo w” (0012) fault. If the grid voltage is below this param eter ’ s value, the fault is trigger ed. The lower limit of this parameter is restricted by UL requirements. 33 Percentage of Nomi[...]
-
Pagina 58
Operation 2–18 152379 Rev C Time Delay for PV W ake up Displays as: PV T Start: T i me delay to transition fro m PV wake up state to PV On-line sta te. Once the inverter is in PV W ake Up mode, it waits for the amount of time determine by this parameter before tran sitioning int o PV on-line mode. During this time the inverter checks that the PV [...]
-
Pagina 59
Operator Interface 152379 Rev C 2–19 Enable Peak Power Tr a c k e r Displays as: PPT Enable: This parameter switches on and off the Power T racker function. When the Power T racker is on, the inverter will regulate the bus voltage to optimize output power . When the Power T racker is off, the inverter will regulate the bus voltage to maintain it [...]
-
Pagina 60
Operation 2–20 152379 Rev C Commanding Goal State Changes T o change the Goal S tate: 1. From the standard display press the < M ENU > key . This will prompt the user for a password. The LCD will change th e third line of the display to “ Type and Hit ENTER ” and fourth line of the display to “ Password: ”. 2. Enter the passwor d &l[...]
-
Pagina 61
Operator Interface 152379 Rev C 2–21 Setting the Date and Time Follow the procedure below to change the date and time. T o change the Date and T ime: 1. From the standard display , press the < M ENU > key . This will prompt the user for the password. The LCD will change the third and fourth lines of the LCD display as follows: “ Type and [...]
-
Pagina 62
Operation 2–22 152379 Rev C Manual State T ransitions St ate conditions can also be transitione d manually . Refer to “Comman ding Goal State Changes” on page 2–20 for instructio ns on commanding PV100S goal states for manual transitions. Shutdown → Matrix T est → Shutdown 1. T urn th e O N /O FF switch to the O FF position. 2. Command [...]
-
Pagina 63
Auto-restart F eature 152379 Rev C 2–23 Any State → Fa u l t If the PV100S encounters a fault, regardless of operating state, it will transition to the Fault state. The PV100S will remain in this state until the fault condition has been remedied and cleared. The Fault Code nu mber will appear on the first line of the LCD. A description of the f[...]
-
Pagina 64
Operation 2–24 152379 Rev C Energize Pr ocedure (Startup) T o start up the PV100S: 1. Remove any lockout devices from the utility connection ci rcuit breaker and PV disconnect switch. 2. Close the utility conn ection circuit breaker . 3. Close the AC D isconnect Switch. 4. Close the DC D isconnect Switch. 5. T urn th e O N /O FF switch to the O N[...]
-
Pagina 65
Computer Communicati ons with the PV100S 152379 Rev C 2–25 Computer Communications with the PV100S The PV100S provides multiple options for communicating system status or data logging through a person al computer using the Xantre x Solar Graphic User Interface (GUI) software. The Xantrex Solar Graphic User Interface (GUI) software is a W indows?[...]
-
Pagina 66
Operation 2–26 152379 Rev C Installing the Graphic User Interface (GUI) Software The following section outlines the minimu m system requiremen ts for using the GUI software and instructions for installin g, configuring, and using the software. Close all programs running on the computer before proceedin g with the installation. Minimum System Requ[...]
-
Pagina 67
Computer Communicati ons with the PV100S 152379 Rev C 2–27 Starting Setup From a Command Prompt T o start the prog ram from a comm and prompt: 1. Insert the XANTREX SOLAR INVER TER GUI – INST ALLA TION CD into your CDROM drive. 2. Click on ST AR T and select “RUN”. 3. Enter the drive letter assigned to your CDROM and the name of the install[...]
-
Pagina 68
Operation 2–28 152379 Rev C Model Specific Soft ware Installation Once the Setup program h as been started, installation of the GUI software can continue. T o continue with the GUI software installation: 1. After the GUI Setup Splash Screen appe ars (Figure 2-1 1 ), click on the button I NSTALL PV100S GUI . The GUI Setup W elcome W ind ow will ap[...]
-
Pagina 69
Computer Communicati ons with the PV100S 152379 Rev C 2–29 2. Click O K and the following wi ndow will appear: If the directory provided in this windo w is acceptable for the installation, proceed to Step 4. If not, click on the C HANGE D IRECTORY button and provide a new name for the desired d estination directory . 3. Click on the picture of th[...]
-
Pagina 70
Operation 2–30 152379 Rev C 4. Click C ONTINUE to confirm th e program group to b e used. The following setup progress in dication window will appear . 5. When completed, you will see this: 6. Click OK . The GUI is now instal led on the computer . Figure 2-15 GUI Setup Progress Indicator Window Figure 2-16 GUI Setup Start Window[...]
-
Pagina 71
Computer Communicati ons with the PV100S 152379 Rev C 2–31 Running the GUI T o run the GUI software p rogram, log onto the computer an d click the following menu items in the order sh own below . 1. W indow’ s S TART button 2. P ROGRAMS 3. X ANTREX _S OLAR 4. X ANTREX S OLAR GUI Remote/LAN Connection If no inverter is connected to the COM1 seri[...]
-
Pagina 72
Operation 2–32 152379 Rev C Direct Connection If the serial communication port of the in verter is co nnected to the COM1 serial port of the computer , the following screen will appear . Figure 2-18 GUI Interface Screen if Connected Directly[...]
-
Pagina 73
Computer Communicati ons with the PV100S 152379 Rev C 2–33 GUI Configuration - Adding Inverter s Once the GUI has started, you will need to configure each Inverter icon to reflect the appropria te operational p a rameters for each inverter that is connected to the system. The software automatically defau lts to one inverter . T o program that inv[...]
-
Pagina 74
Operation 2–34 152379 Rev C 5. Fill out the Operational Configurations Information in the form shown in Figure 2-21 through F igure 2-23. This section h as four sub-menu pages to cover the followi ng parameters. a) Fill out Operational Lim its Informatio n requested. b) Click on the PV Sub-menu to continue. c) Fill out PV Information requested. d[...]
-
Pagina 75
Computer Communicati ons with the PV100S 152379 Rev C 2–35 e) Fill out the Power T rackin g Information requested. f) Click on the Connections Form T ab to continue. 6. Fill out the Connection - General Information in the form in Figure 2-24. 7. Click on the T elephone Fault Conf iguration sub-menu to continue. Figure 2-23 Operational Configurati[...]
-
Pagina 76
Operation 2–36 152379 Rev C 8. Fill out the Connection - T elephone Fault Configuration Information in the form shown in Figure 2-25 . 9. Click on the T elephone Configuration sub-menu to continue. 10. Fill out the Connection - T elephone Configuration Information in the form shown in Figure 2-26. 1 1. Once the information is complete, click the [...]
-
Pagina 77
Computer Communicati ons with the PV100S 152379 Rev C 2–37 GUI Help The GUI software program has a built-in help program. Once the program is started, click on the H ELP menu item to start the Help program. The Help interface is divide d into the following sections. • Getting Started - IMPOR T ANT : Read this first • Setup - T utorial for set[...]
-
Pagina 78
2–38[...]
-
Pagina 79
3 Commissioning Chapter 3, “Commissioning” cont ains information on safely commissioning the PV100S 100 kW Grid-T ied Photovoltaic Inverter.[...]
-
Pagina 80
Commissioning 3–2 152379 Rev B Commissioning Procedur e This section provides the procedure necess ary to safely a nd correctly commission a PV100S inverter . Summary T o commission the PV100S: 1. Ensure the V erification T ests have been completed and have passed successfully . See the PV100S 100 kW Grid-tied Photov oltaic Inverter Planning and [...]
-
Pagina 81
Starting the Commissioning T est F ile 152379 Rev B 3–3 Serial Number 1. Enter the information required by GUI in the white text boxes on the form that appears next. The converter serial number is loc ated on a label placed on the lower-left front of the Main Inverter Enclosure door . 2. Once you finish recording the re quired information, click [...]
-
Pagina 82
Commissioning 3–4 152379 Rev B a) If PV voltage is not available an d the Co mmissioning T est must be stopped, SA VE the Commissioning File. This fi le will be used once P V DC voltage has been applied and verified. 6. Once you finish verifying PV DC voltage s, go back to the GUI Commissioning Procedure and cli ck on th e check box to indicate t[...]
-
Pagina 83
Starting the Commissioning T est F ile 152379 Rev B 3–5 5. If not, refer to the “Setting th e Date and Time” on page 2–21. 6. Scroll thru the parameters and verify that they are present. 7. Once you finish checking the Front Panel Display , go back to the GUI Commissioning procedure and click on the check box to indicate the task is complet[...]
-
Pagina 84
Commissioning 3–6 152379 Rev B Confirm DC Operational P arameters 1. V erify the Inverters PV Settings. 2. Make any necessary changes. 3. Record these values. 4. Once you finish these tasks, go back to th e GUI Commissioning Procedure and click on the check box to indicate the task is complete. Go to the next step by clicking on the " N EXT [...]
-
Pagina 85
Starting the Commissioning T est F ile 152379 Rev B 3–7 Operate Inverter 1. Make sure all doors are closed and locked. 2. Using the Front Panel or the GUI, set the I PP T Max percent to 25%. 3. Place the O N /O FF Switch (S3) in the O N position. If the PV voltage is above PV Start voltage threshold, followed by a 5-minute de lay period, the PV c[...]
-
Pagina 86
3–8[...]
-
Pagina 87
4 T r oubleshooting Chapter 4, “T roubleshooting” contains information and procedures for troubleshooting the PV100S 10 0 kW Grid-T ied Photovoltaic Inverter. It provides desc riptions of common situat ions and errors that may occur and provides possible solutions for resolving fault conditions. It also provides instructi ons for clearing fa ul[...]
-
Pagina 88
T roubleshooting 4–2 152379 Rev C F aults and F ault Codes Fault states are automatic from any state of operation. In the event of a fault condition, the PV100S will immediately stop processing power and execute an immediate orderly shutd own, open both the main AC and DC contactor s, and remain in a faulted state until the fault is remedied and [...]
-
Pagina 89
Clearing F aults Manually 152379 Rev C 4–3 Clearing F aults Manually Faults associated with a grid disturbance clear automatically . These faults include: • 0010 (AC Frequency Low), • 001 1 (AC Freq uency High), • 0012 AC V oltage Low), and • 0013 (AC V oltage High) only . Once the AC voltage and frequency return to within the acceptable [...]
-
Pagina 90
T roubleshooting 4–4 152379 Rev C F ault Code Descriptions T able 4-1 provides a complete descriptio n of all the fault conditions that may occur on the PV100S. T able 4-1 Fa u l t C o d e s Error Code F ault Source(s) Fa u l t Ty p e H=Hardware S=Softw are F ault Description P ossible Causes 0000 No Faults N/A N/A N/A 0010 AC Frequency Low S Thi[...]
-
Pagina 91
F ault Code Descriptions 152379 Rev C 4–5 0013 AC V oltage High S This fault indicat es that the utilit y grid voltage is above or rose above the maximum allowed value of 110% of nominal V ac fo r greater than 2 seconds, or 137% of nominal V ac for greater than 2 cycles. This fault is auto-clearing. Once the Utility grid voltage has recovered wit[...]
-
Pagina 92
T roubleshooting 4–6 152379 Rev C 0021 PV Over-V ol tage S T his fault indicat es that the PV100S has detected a DC input voltage of greater than the maximum allowed value of 600 Vdc. • PV system wiring short • Lig htning str ike on PV system wiring 0023 Bus V o ltage High H This fault indicates that the PV100 S has detected that the DC bus v[...]
-
Pagina 93
F ault Code Descriptions 152379 Rev C 4–7 0040 Programming Software S This code indicates that the PV100S has detected that the system is in Programming mode. This fault does not indicate any malfunctio n with the PV100S, but is merely an indication that the system software is in the process of being downl oaded into the EEPROMs of the CCU2. 0041[...]
-
Pagina 94
T roubleshooting 4–8 152379 Rev C 0047 Software T est S This fault indicates that the PV100S has detected that a software test fault has occurred. Th is is a simulated faul t used for debugging p urposes. 0048 Bad Memory S This fault indicates that the PV100S has detected that the SRAM DIMM on the CCU2 controller board has failed. The CCU2 perfor[...]
-
Pagina 95
F ault Code Descriptions 152379 Rev C 4–9 XX62 Matrix T emperature S This fault indicates that the PV100S has detected that the temperature of the IGBT matrix aluminum heatsink has exceeded the maximum allowed value of 95 °C. • Fuses F15 or F16 blown • External cooling fan inoperable • Air flow on heat sink impeded due to accumulation of d[...]
-
Pagina 96
T roubleshooting 4–10 152379 Rev C 0075 Shutdown Remotely S This fault indicates that the PV100S has detected that the s ystem was commanded via the GU I to transition to the Shutdown State. This fault is not indicative of a failure or malfunction, but primarily used to disable the system remotely . • Remote Shutdown command via the GUI 0082 Ma[...]
-
Pagina 97
5 Pr eventative Maintenance Chapter 5, “Preventative Maintena nce” contains information and procedures for performing preven tative maintenance on the PV100S 100 kW Grid-T ied Photovoltaic Inverter.[...]
-
Pagina 98
Preventative Maintenance 5–2 152379 Rev C Maintenance Safety Prior to following an y Maintenance Procedures, fol low the System Shutdown and Lock-out and T ag procedure. Operational Safety Procedur es Never work alone when servici ng this equipment. A team of two is required until the equipment is properly de-energized, locked-out and tagged, and[...]
-
Pagina 99
Maintenance Safety 152379 Rev C 5–3 Lockout and T ag Safety requirements mandat e that this equipment not be serviced while energized. Power sources for the PV100S must be locked-out and tagged prior to servicing. Each energy source should have a pa dlock and tag installed on e ach energy source prior to servicing. The PV100S can be energized fro[...]
-
Pagina 100
Preventative Maintenance 5–4 152379 Rev C Figure 5-1 Inverter AC T erminal Locations in the Main Inverter Enclosure Figure 5-2 Utility AC T erminal Connections in the A C Interface Enclosure TB4-A TB4-B TB4-C TB1 Ground Bar AC Interface Enclosure Enlargement of Terminal Co nnectors in the AC Interface Enclosure S1-4T2 (B phase) S1-2T1 (A phase) S[...]
-
Pagina 101
Maintenance Safety 152379 Rev C 5–5 Figure 5-3 PV T erminal Locations PV POSitive Cable (TB3-1) PV NEGative Cable (TB3-2) Conduit entry from PV Array GrouND (TB3-3)[...]
-
Pagina 102
Preventative Maintenance 5–6 152379 Rev C P eriodic Maintenance Xantrex T echnology recommends that the following preven tative maintenance procedures be carried out on the PV1 00S. Monthly Intervals or As Required Perform the following preventati ve maintenance tasks on a mo nthly basis or as required. Aluminum Extrusion Heatsink ❐ Inspect the[...]
-
Pagina 103
P eriodic Maintenance 152379 Rev C 5–7 Six-month Intervals Perform the following preventati ve maintenance tasks on a six-month b asis or as required. Enclosure Seals ❐ Inspect the enclosure access panel seal. If damaged, replace with equivalent closed cell foam gasket. Call your Xant rex T echnology distributor for factory replacements or spec[...]
-
Pagina 104
5–8[...]
-
Pagina 105
A Specifications Appendix A provides the environmenta l and electrical specifications for the PV100S 100 kW Grid-T ied Photovoltaic Inverter.[...]
-
Pagina 106
Specifications A–2 152379 Rev C System Specifications The PV100S has been designed for photov oltaic power systems, which operate within the following specifications. Environmental Specifications The following environmental specifications are the same for both models of the PV100S 100 kW Grid-T ied Photovoltaic Inve rter. CA UTION: Equipment Dama[...]
-
Pagina 107
System Specifications 152379 Rev C A–3 Electrical Specifications T able A-2 provides the AC and DC specifications for the PV100S. Over V oltage , Under V oltage and Frequency Rang es T able A-3 provides the over voltage, under voltage, over-frequency , and under - frequency detection limits for the PV100S. These detection limits have been factory[...]
-
Pagina 108
Specifications A–4 152379 Rev C Wire G au ge an d T orq u e R eq u ir em en t s T able A-4 provides acceptable wire gauges , bolt sizes, and torque values for AC terminal connections. *See Cautionary note in the PV100S 100 kW Grid-tied Ph otovoltaic Inverter Planning and Installation Manual regarding hardware length. T able A-5 provides acceptabl[...]
-
Pagina 109
Appendix A Schematics 152379 Rev C A-5 Figure A-1 Electrical Diagram (sample)[...]
-
Pagina 110
Schematics Appendix A A-6 152379 Rev C Figure A-2 PV100S-480 Schematic for Main P ower Distribution (152316 E1)[...]
-
Pagina 111
Appendix A Schematics 152379 Rev C A-7 Figure A-3 PV100S-480 Schematic for Contro l P ower Distribution (152316 E2)[...]
-
Pagina 112
Schematics Appendix A A-8 152379 Rev C Figure A-4 PV100S-480 Schematic for Converter Control Unit (152316 E3)[...]
-
Pagina 113
Appendix A Schematics 152379 Rev C A-9 Figure A-5 PV100S-208 Schematic Main P ower Distribution (152376 C1)[...]
-
Pagina 114
Schematics Appendix A A-10 152379 Rev C Figure A-6 PV100S-208 Schematic for Contro l P ower Distribution (152376 C2)[...]
-
Pagina 115
Appendix A Schematics 152379 Rev C A-11 Figure A-7 PV100S-208 Schematic for Converter Control Unit (152376 C3)[...]
-
Pagina 116
Schematics Appendix A A-12 152379 Rev C This page intentio nally left blan k.[...]
-
Pagina 117
152379 Rev C WA–1 W arranty and Product Information Xantrex Limited W arr anty PV100S GRID TIE INVER T ER (PV SERIES INVER TER) 1. What does this warranty cove r and how long does it last? This Limited W a rranty is provided by Xantrex T echnology In c. (“Xantrex”) and covers defects in workmanship and materials in your PV Series Inverter . T[...]
-
Pagina 118
W arranty and Return WA–2 152379 Rev C 4. Product Disclaimer THIS LIMITED W ARRANTY IS THE SOLE AND EXCLUSIV E W ARRANTY PROVIDED BY XANT REX IN CONNECTION WITH YOUR XANTREX PRODUCT AND IS, WHERE PERMITTED BY LA W , IN LIE U OF ALL OTHER W ARRANT IES, CONDITIONS, GUARANTEES, REPRESENT A TION S, OBLIGA TIONS AND LIABILITIE S, EXPRESS OR IMPLIED, S[...]
-
Pagina 119
W arranty and Return 152379 Rev C WA–3 PRODUCT REGISTRA TION T o ensure the fastest possible servic e, please ensure your system info rmation submitted to Xantrex. Please fill the required information in and send a copy of this page to Xantrex T echnology Inc. Fax number: 925 455 0382 Mail to: Xantrex T echnology Inc. 161-G South V asco Road Live[...]
-
Pagina 120
W arranty and Return WA–4 152379 Rev C[...]
-
Pagina 121
A AC Interface Enclosure 1–8 Accumulated V alues 1–18 Anti-Islan d Protection 1–5 Auto-restart Feature 2–23 Autorun 2–26 C Clearing Faults Manually 4–3 Command Prompt 2–27 Commissioni ng 3–2 Communication Enclosure 1–9 Communications 2–25 Configurable Parameters 1–18 Controls 1–10 Converter Control Unit (CCU2) 1–7 D Data L[...]
-
Pagina 122
Index IX–2 152379 Rev C P Period Maintenance Monthly 5–6 Six month interv als 5–7 Power Distributi on Panel 1–7 Power Electronics Matrix 1–7 PV Ground Fault Det ection 1–5 R Remote Monitor and Control Features 1–18 Remote/LAN Connection 2–31 Running the GUI 2–31 S Self-protection features 1–2 Shutdown 2–24 Software Upgrade 1?[...]
-
Pagina 123
[...]
-
Pagina 124
Xantrex Technology Inc. 1 800 670 0707 Tel toll free NA 1 360 925 5097 Tel direct 1 800 994 7828 Fax toll free NA 1 360 925 5143 Fax direct customerservice@xantrex.c om www.xantrex.com 152379 Rev C PC Printed in USA[...]