321 Studios QW2S manual

1
2
3
4
5
6

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of 321 Studios QW2S, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of 321 Studios QW2S one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of 321 Studios QW2S. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of 321 Studios QW2S should contain:
- informations concerning technical data of 321 Studios QW2S
- name of the manufacturer and a year of construction of the 321 Studios QW2S item
- rules of operation, control and maintenance of the 321 Studios QW2S item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of 321 Studios QW2S alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of 321 Studios QW2S, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the 321 Studios service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of 321 Studios QW2S.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the 321 Studios QW2S item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    F1915 (2 01 2 04 ) Page 1 of 6 BARD M ANUFACTURING COMP A NY, INC. Q W2 S-QW 5S Water -to- A ir H /P Enginee ring Spec ification Guide 1.0 GENERA L Furnish a nd install a s elf - contained, vertical, floor s tanding, heat pump to be manufacture d by Bard Manufac turi ng Compan y , Inc . The unit shall be approved and L isted by Intertek ETL Lis ted[...]

  • Page 2

    F1915 (2 01 2 04 ) Page 2 of 6 2.3 COMPRESSOR A ll models shall use a high ef fici ency scroll com presso r with step capacit y providing 2 stages of control . Th e compr essor shall b e cov ered by a 5 - y ear part s warr anty . The r efrigerat ion circuit sh all be equipped with factory installed high and low - pressur e controls. The refriger at[...]

  • Page 3

    F1915 (2 01 2 04 ) Page 3 of 6 standard . On e shall be used f or fr esh water appli cations, th e othe r for pr otected (anti freez e) clo sed sy stems. The fa ctory w ired switch is for fr esh water. Phase r otation protection and phase failure protection shall be standard fac tory install ed features on al l equipment w ith three - phase power. [...]

  • Page 4

    F1915 (2 01 2 04 ) Page 4 of 6 The built - in comme rcial room ventilator (CRV) i s internall y mounted and allo ws outsid e v entilati on air, up to 50% o f the total ai r flo w rating of the unit, to be introduc ed through the air inlet openings. T he CRV shall be modular and easily added or removed from the unit cabinet. It includes a built - in[...]

  • Page 5

    F1915 (2 01 2 04 ) Page 5 of 6 5. 1 2” Fiberglass – Pleated – MERV 8 6.0 HOT GAS REHEAT - (Fa c t or y instal led option) 6.1 The dehumidific ation circuit incorpora tes an independent heat exchang er coi l in th e supply air stream in addit ion t o the st andard evap orato r coil. Th is coi l reh eats t he su pply air after it pa sses o ver [...]

  • Page 6

    F1915 (2 01 2 04 ) Page 6 of 6 intake and exhaust. Louver shall ha ve a po w der coat fini sh. See our color chart for color selections. Louver required wi th sleev e with the use of any ventilation option. 10.4 A IR DI STRIBUTI O N – (Select 1) 10.3.1 The Q - Tec shal l ha ve a d ischarge air plenum with double deflection reg ister mounted on fr[...]