Allied Telesis AT-X210-16GT manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Allied Telesis AT-X210-16GT, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Allied Telesis AT-X210-16GT one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Allied Telesis AT-X210-16GT. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Allied Telesis AT-X210-16GT should contain:
- informations concerning technical data of Allied Telesis AT-X210-16GT
- name of the manufacturer and a year of construction of the Allied Telesis AT-X210-16GT item
- rules of operation, control and maintenance of the Allied Telesis AT-X210-16GT item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Allied Telesis AT-X210-16GT alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Allied Telesis AT-X210-16GT, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Allied Telesis service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Allied Telesis AT-X210-16GT.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Allied Telesis AT-X210-16GT item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    613-001769 Rev A AT-x210-24GT AT-x210-16GT AT-x210-9GT Gigabit Ethernet Switches Installation Guide 1357 2468 91 1 1 3 1 5 R 10 12 14 16R 17 19 21 23R 18 20 22 24R A T -x210-24GT Gigabit Ethernet Switch 15 16 23 24 L/A 2 4 6 8 10 12 14 16R 18 20 22 24R MODE L/A MODE CONSOLE RS-232 FAUL T STANDBY RESET POWER SELECT 1 3 5 7 9 11 13 15R 17 19 21 23R 1[...]

  • Page 2

    Copyright © 2013 Allied Telesis, Inc. All rights reserved. No part of this publicati on may be repr o duced without prior w ritten permission from Al lied Telesis, Inc. Allied Telesis and the Allied Telesis logo are trademarks of Allied Telesis, Incorp orated. All other product names, company names, logos or oth er designations ment ioned herein a[...]

  • Page 3

    i Electrical Safety and Emissions S tandards This product meets the following standards. RFI Emissions EN 55022:2010 EN 61000-3-2:2006+A1:2009+A2:2009 EN 61000-3-3:2008 EN 62233:2008 EN 6231 1:2008 FCC Class A FCC Part 15 (47 CFR 15) ICES-003 VCCI-A VCCI-B 2004/108/EC EMC Directive Environmental 201 1/65/EU RoHS Directive Compliance Electrical Safe[...]

  • Page 4

    ii T ranslated Safety Statements Important: The  indicates that a translation of th e safety statement is available in a PDF document titled Translated Safety State ments posted on the Allied Telesis website at www.alliedtelesis.com .[...]

  • Page 5

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide iii Contents Preface ...... ................ ............. ................ ............. ................ ............. ................ ............. ..... ..... ................ ........... 1 Symbol Conventions .............. .... ... ... ... .... ............ .... ... ... [...]

  • Page 6

    Contents iv[...]

  • Page 7

    v Figur e s Figure 1: AT-x210-9GT, AT-x210-16G T, and AT-x210-24GT packaging ........................... ....................... .............. ........... ... 8 Figure 2: AT-x210-9GT, AT-x210-16 GT, an d AT-x210-24GT Front Panels .......................... .................... ............... ............. 9 Figure 3: MODE LED Toggle button ......[...]

  • Page 8

    List of Figures vi[...]

  • Page 9

    vii Ta b l e s Table 1. AT-x210-9GT POWER LED Functional Descripti ons ........................ ................ .................... .......... . ................... 13 Table 2. AT-x210-16GT and AT-x210- 24GT FAULT LED Functiona l Description s ... ........... .................... ................. . ...... 14 Table 3. AT-x210-16GT and AT-x210-24G[...]

  • Page 10

    List of Tables viii[...]

  • Page 11

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 1 Pr eface This guide contains the installat ion instructions for the AT-x210-9GT, AT- x210-16GT, and AT-x210-24GT Gigabit Ethe rnet Switches. This preface contains the following sections:  “Symbol Conventions” on page 2  “Contacting Allied Telesis” on pag e 3[...]

  • Page 12

    2 Symbol Conventions This document uses the following conventions: Note Notes provide additional informatio n. Caution Cautions inform you t hat performing or omitting a specific actio n may result in equipment damage or loss of data. Warning Warnings inform you that performing or omitting a sp ecific action may result in bodily injury. Warning War[...]

  • Page 13

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 3 Contacting Allied Telesis If you need assistance with this prod uct, you may contact Allied Telesis technical support by going to the Suppo rt & Services section of the Allied Telesis web site at www.alliedtelesis.com/support . You can find links for the following servic[...]

  • Page 14

    4[...]

  • Page 15

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 5 Chapter 1 Overview This chapter provides des criptions of the AT-x2 10-9GT, AT-x210-16GT, and AT-x210-24GT Gigabit Ethernet Swit ches a nd contains the following sections:  “Features” on page 6  “Package Contents” on page 8  “Front and Back Panels” on p [...]

  • Page 16

    Chapter 1: Ove rview 6 Features Here are the hardware featu res of the AT-x210-9GT, AT-x210-16GT and AT-x210-24GT Gigabit Ethernet Switches. Twisted Pair Ports Here are the basic features of the 10 /100/1000 Mbps twisted-pair ports:  9, 16, or 24 ports per switch  10Base-T (IEEE 802.3i), 100Ba se-TX (IEEE 802.3u) and 1000Base-T (IEEE 802.3ab)[...]

  • Page 17

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 7 LEDs Here is a brief description of the port LEDs:  Power LED/Fault/Standby LEDs; refer to “POW ER/FAULT/ STANDBY LEDs” on page 13 .  Speed and link/activity LEDs for the twisted pair ports; see “10Base-T/100Base-TX/1000 Ba se-T Link Activity LEDs” on page 15 .[...]

  • Page 18

    Chapter 1: Ove rview 8 Package Contents Figure 1 illustrates the package contents for the AT-x210-9GT, AT-x210-16GT, and AT-x210 -24GT Gigabit Ethernet Switches. Figure 1. AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT p ackaging 1 Power Cable (1.8m) AT-x210-16GT/AT-x210-24GT 1 x 19” rack mount kit 1 Power cable hook A T -x210-16GT 2 Brackets 4 Brac[...]

  • Page 19

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 9 Front and Back Panels Figure 2 illustrates the front panels of the AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Gigabit Ethernet Switches. Figure 2. AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Fr ont Panels 1357 2468 FAUL T STANDBY RESET POWER CONSOLE RS-232 MODE SPEED DUPLEX[...]

  • Page 20

    Chapter 1: Ove rview 10 Figure 3 illustrates the MODE LED toggle button on the front panel of the of the AT-x210-9GT and AT-x210-16 GT Gigabit Ethernet Switches. This button changes front panel LEDs for SPEED, DUPLEX, or turns off LEDs. Figure 3. MODE LED Toggle button Figure 4 illustrates the front panels of the AT-x21 0-9GT, AT-x210-16GT, and AT-[...]

  • Page 21

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 11 Management Software The switches are shipped with the management software pre-installed. The software provides a command line interf ace and a GUI (Graphical User Interface) for in-band, over-the -network management. Refer to the:  AlliedWare Plus Software Reference for [...]

  • Page 22

    Chapter 1: Ove rview 12 Twisted Pair Ports The AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Layer 2 Gigabit Ethernet Switches feature 9, 16, and 24 twisted pair ports, respectively. All ports are 10Base-T, 100Base-TX, and 1000Base-T compliant. You can set the port speeds and dup lex modes either automatically with IEEE 802.3u Auto-Negotiation or man[...]

  • Page 23

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 13 LEDs There are four types of LEDs on the AT-x210 switch es:  “POWER/FAULT/STANDBY LEDs” on page 13  “10Base-T/100Base-TX/1000 Ba se-T Link Activity LEDs” on page 15  “SFP LEDs” on page 17 POWER/ FAULT/ STANDBY LEDs The POWER LED reports the status of AC[...]

  • Page 24

    Chapter 1: Ove rview 14 Figure 6. FAULT LED on AT-x210-9GT Table 2 describes the functions for the F AULT LED for the AT-x210-9GT and AT-x210-16GT switches. T able 2. A T -x210-16GT and A T -x210-24GT F AUL T LED Functional Descriptions Figure 7. FAULT LED on AT-x210-16GT Table 3 describes the functions for the STANDBY LED for the AT-x210- 9GT and [...]

  • Page 25

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 15 10Base-T/ 100Base-TX/1000 Base-T Link Activity LEDs The Link Activity (L/A) LEDs prov ide information about the 1 0Base-T/ 100Base-TX/1000Base-T ports. AT-x210-9GT Link/Activity and Speed LEDs The AT-x210-9GT switch indicates LINK/ACT (link/activity) and SPEED/ DUPLEX (spee[...]

  • Page 26

    Chapter 1: Ove rview 16 AT-x210-16GT Link/Activity LEDs The AT-x210-16GT switch has two LEDs per port on the front pan el to indicate link, activity, duplex , and speed statu s. See Figure 9. Figure 9. AT-x210-16GT Link/Activity/Spe ed LEDs AT-x210-24GT Link/Activity LEDs The AT-x210-24GT switch has two LEDs per port to indicat e port’s link, act[...]

  • Page 27

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 17 See Table 5 for a description for the AT-x210-16 GT and AT-x210-24GT Link/Activity and Speed LEDs. T able 5. A T -x210-16GT and A T -x210-24GT LINK/ACT and SPEED/ DUPLEX LED Descriptions . SFP LEDs The SFP LEDs indicate the Link/Activity and Speed status of e ach SFP slot. [...]

  • Page 28

    Chapter 1: Ove rview 18 Figure 12. AT-x210-16GT SFP Status LEDs The AT-x210-24GT SFP LEDs can be found on between t he upper and lower SFP slots. See Figure 13. Figure 13. AT-x210-24GT SFP Status LEDs Table 6 describes the Link/Activ ity LEDs for the SFP slots. T able 6. SFP Link/Activity LED Functional Descriptions LED State Description SFP Off Th[...]

  • Page 29

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 19 Power Supply Each switch has an internal p ower supply with a single AC power supply socket on the back panel. To power the switch on or o ff, connect or disconnect the power cord provided wi th the swit ch. A power cord is supplied with the switch. Note For the power requi[...]

  • Page 30

    Chapter 1: Ove rview 20[...]

  • Page 31

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 21 Chapter 2 Installation This chapter contains the following sections:  “Reviewing Safety Precautions” on page 22  “Selecting a Site for the Switch” on page 24  “Cable Specifications” on page 25  “Unpacking the Switch” on page 26  “Installing [...]

  • Page 32

    Chapter 2: Inst allation 22 Reviewing Safety Precautions Please review the following safety pr ecautions before you begin to install the chassis or any of its components. Note The  indicates that a translation of the safety state ment is available in a PDF document titled Tran slated Safety Statements . Warning To prevent electric shock, do not [...]

  • Page 33

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 23 All Countries: Install product in accordance with loca l and National Electrical Codes.  E8 Circuit Overloading: Consideratio n should be given to the connection of the equipment to the sup ply circuit and the effect that overloading of circuits might have on o vercurren[...]

  • Page 34

    Chapter 2: Inst allation 24 Selecting a Site for the Switch Observe the following requirements when choosing a site for your switch:  If you plan to install the switch in an equipment rack, verify that the rack is safely secured and will not tip over. Devices in a rack should be installed starting at the bottom, with the heavier devices near the[...]

  • Page 35

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 25 Cable Specifications Table 7 contains the cable spe cific ations for the twisted pair ports. Note The twisted pair ports on the switch fe ature auto-MDI when operating at 10, 100, or 1000 Mbps. A port is configured as MDI or MDI-X when it is connected to an end nod e. Conse[...]

  • Page 36

    Chapter 2: Inst allation 26 Unpacking the Switch To unpack the switch, perform the following p rocedure: 1. Remove all of the co mponents from the shipping packa ge. Note Store the packaging material in a sa fe location. You must use the original shipping material if you need to re turn the unit to Allied Telesis. 2. Place the switch on a leve l, s[...]

  • Page 37

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 27 Installing the Switch o n a Table or a Desktop You can install AT-x210-16GT and AT-x210-24GT switches on a desktop, or in a standard 19-inch equipment rack. To insta ll AT -x210-16GT and AT- x210-24GT switches in a rack, see “Installing the Switch in an Equipment Rack” [...]

  • Page 38

    Chapter 2: Inst allation 28 Installing the Switch in an Equipment Rack Note: These instructions show you how to install an AT-x210-9GT, AT-x210-16GT or AT-x210-24GT switch in an equipment rack. Rack mount kit brackets are included wi th AT-x210-16 GT and AT-x210-24GT switches. The AT-x210-9GT switch is inst alled in a rack with the optiona l AT-x21[...]

  • Page 39

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 29 4. Mount an AT-x210-24GT switch in a 19-inch equipment rack using four equipment rack screws (not provided with the switch). Figure 17. Mounting an AT-x210-24GT Switch in an Equipment Rack 5 7 6 8 9 11 13 15R 10 12 14 16R 17 19 21 23R 18 20 22 24R 15 16 23 24 24 6 8 RS-232 [...]

  • Page 40

    Chapter 2: Inst allation 30 5. For AT-x210-16GT Switches, attach the two rack mo unt brackets to the sides of the switch using the bracket screws th at come with the unit. See the bracket position as sh own in Figure 18 and Figure 19. Figure 18. Attaching the brackets level with the front of an AT-x210-16GT Figure 19. Close up showing a br acket po[...]

  • Page 41

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 31 6. Mount an AT-x210-16GT switch in a 19-inch equipme nt rack using the provided spacer bracket mounts with four equ ipment rack screws (not provided with the switch), as shown in Figu re 20. Figure 20. Mounting an AT-x210-16GT Switch in an Equipment Rack 13 5 7 246 8 9 11 1[...]

  • Page 42

    Chapter 2: Inst allation 32 7. For AT-x210-9GT switches, first fit the ra ck mount handles to the brackets using the supplied M3x6mm pa n head screws, as shown below in Figure 21. Figure 21. Fitting rack mount handle s to the brackets for an AT-x210-9GT 8. After fitting t he rack mount handles to the brackets using the supplied M3x6mm pan head scre[...]

  • Page 43

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 33 9. Next attach the cable tray brackets for AT-x210-9GT switches, as shown below in Figure 23. Figure 23. Attaching cable tray brackets for an AT-x210-9GT 10. Mount an AT-x210-9GT switch in a 19-inch equipment rack, as shown below in Figure 24, using the screws from the rub [...]

  • Page 44

    Chapter 2: Inst allation 34 11. Mount an AT-x210-9GT switch in a 19-in ch equipment rack using the provided spacer bracket mounts with four equipment rack screws, as shown in Figure 25. Figure 25. Mounting an AT-x210 -9GT Switch in an Equipment Rack 12. Secure cables to the cable tray fitte d earlier, as shown in Figure 26. Figure 26. Securing cabl[...]

  • Page 45

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 35 Installing Optional SFP Transceivers To install an SFP transceive r, perform the following procedure: Note The transceiver can be hot-swapped; you do not need to power off the switch to install a transceiver. Ho wever, always remove the cables before removing the transceive[...]

  • Page 46

    Chapter 2: Inst allation 36 4. For an AT-x210-24GT Switch, gently slide the transceiver into the SFP slot until it clicks into place, as shown in Figure 28. Figure 28. Inserting the SFP on an AT-x210-24GT 5. For an AT-x210-16GT Switch, gently slide the transceiver into the SFP slot until it clicks into place, as shown in Figure 29. Figure 29. Inser[...]

  • Page 47

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 37 6. Verify that the handle on the transceiver is in the upright position, as shown in Figure 30. This secures the transceiver and prevents it from being dislodged from the slot. Figure 30. Positioning the SFP Handle in the Upright Positio n 7. Eject SFP transce ivers, as sho[...]

  • Page 48

    Chapter 2: Inst allation 38 Note SFP transceivers are dust sensitive. Always keep the plu g in the optical bores when a fiber optic c able is not installed, or whe n storing the SFP. When you do remove the plug, keep it for fu ture use. Note Unnecessary removal and insertio n of an SFP can lead to premature failure. For information on the cable spe[...]

  • Page 49

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 39 Cabling the Switch Observe the following guidelines when connecting twisted pair and fiber optic cables to the ports on the switch:  The connector on the cab le should fit snugly into the port on the switch. The tab on the connect or should lock the connector into place.[...]

  • Page 50

    Chapter 2: Inst allation 40  The default speed setting for the ports is Auto-Negotiation. This setting is appropriate for ports connected to network devices that also support Auto-Negotiation.  The default speed setting of Auto-Negotiation is not appropria te for ports connected to 10/100Base-TX netwo rk devices that do not support Auto-Negot[...]

  • Page 51

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 41 Powering On the Switch To power on the AT-x210-24GT, AT-x210-16GT, or AT-x210-9GT switch, perform the following procedure: 1. Plug the power cord into the AC power connector, as shown in Figure 32 on the back of an AT-x210-16GT Switch. Figure 32. Lifting the AC Power C able[...]

  • Page 52

    Chapter 2: Inst allation 42 Warning Power cord is used as a disconnection device. To de-energize equipment, disconnect the powe r cord.  E3 Pluggable Equipment. The socke t outlet shall be installed near the equipment and shall be easily accessible.  E5 4. Verify that the POWER LED is gree n. If the LED is OFF, see Chapter 3, “Troubleshooti[...]

  • Page 53

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 43 Monitoring the Initialization Processes It takes about thirty seconds fo r the switch to initialize its management software programs and features, and lo ad the default configuration. You may also monitor the bootup sequence b y connecting a terminal or computer that has a [...]

  • Page 54

    Chapter 2: Inst allation 44 Figure 35. Switch Initia lization Messages (Continued) Starting ba se/loopba ck... [ O K ] Starting ba se/sysctl ... [ O K ] Received ev ent poefw .done Starting ba se/portma pper... [ O K ] Received ev ent syslo g.done Starting ba se/reboot -stability. .. [ O K ] Starting ba se/autofs -card... [ O K ] Checking sy stem r[...]

  • Page 55

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 45 Figure 36. Switch Initialization Messages (Continued ) Assigning A ctive Wor kload to HA processe s: hsl, nsm, rm ond, sflowd, vr rpd, irdpd, la cpd lldpd, loop protd, ms tpd, authd, epsrd, i mi, imiprox yd Received ev ent netwo rk.activate d Loading defau lt conf ig ur at [...]

  • Page 56

    Chapter 2: Inst allation 46[...]

  • Page 57

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 47 Chapter 3 T r oubleshooting This chapter contains information o n how to troubleshoot the switch if a problem occurs. Note For further assistance, plea se contact Allied Telesis Technical Support at www.alliedtelesis.com/support . Problem 1: The POWER LED on the front of th[...]

  • Page 58

    Chapter 3: Tro ubleshooting 48 cable: Category 3 or better for 10 Mbp s operation and Category 5 and Category 5E for 100 and 1000 Mbps operation. Note A 1000Base connection may require five to ten seco nds to establish a link. Problem 3: The LINK/ACT LED for an SFP transce iver is off. Solutions: The fiber optic po rt on the transceiver is unable t[...]

  • Page 59

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 49 Problem 5: A port’s LINK/ACT LED is blinking. Solutions: The link between the port and the n etwork device is intermittent. Try the following:  Connect another network device with a different cable to the port. If the Link LED remains steady on, then the p roblem is wi[...]

  • Page 60

    Chapter 3: Tro ubleshooting 50[...]

  • Page 61

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 51 Appendix A T echnical Specifications[...]

  • Page 62

    Appendix A: Technica l Specification s 52 Physical Specifications Dimensions Weight Environmental Specifications T able 8. Chassis Dimensions Model W x D x H mm (in) A T -x210-9GT 263 mm x 179 mm x 38 mm (10.35 in x 7.05 in x 1.50 in) A T -x210-16GT 341 mm x 210 mm x 44 mm (13.42 in x 8.26 in x 1.73 in) A T -x210-24GT 440 mm x 210 mm x 44 mm (17.32[...]

  • Page 63

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 53 Power Specifications Input Supply Voltage - 100-240 VAC, 50 - 60 Hz Electrical Safety and Electromag netic Emissions Certifications T able 1 1. Power S pecifications A T -x210-9GT 12 W A T -x210-16GT 19 W A T -x210-24GT 28 W T able 12. Safety and Electromagn etic Emissions [...]

  • Page 64

    Appendix A: Technica l Specification s 54 Connectors and Port Pinouts This section lists the connectors and connector pinout s. Figure 37 illustrates the pin layout for a n RJ-45 connector and port. Figure 37. RJ-45 Connector and Po rt Pin Layout Table 13 lists the RJ-45 pin signals when a twisted pair port is operating in the MDI configuration. Ta[...]

  • Page 65

    AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 55 Table 15 lists the RJ-45 con nector pins and their signals when a 1000Base-TX port is operating at 10 00 Mbps. T able 15. RJ-45 1000Base-T Connector Pinouts Pin Pair Signal 1 1 TX and RX+ 2 1 TX and RX- 3 2 TX and RX+ 4 3 TX and RX+ 5 3 TX and RX- 6 2 TX and RX- 7 4 TX and [...]

  • Page 66

    Appendix A: Technica l Specification s 56[...]