Go to page of
Similar user manuals
-
Switch
Allied Telesis x900-48 series
21 pages 0.38 mb -
Switch
Allied Telesis AT-8000GS/48
4 pages 0.09 mb -
Switch
Allied Telesis at-fs705efc
2 pages 0.05 mb -
Switch
Allied Telesis ATFS705EFCSC60
50 pages 0.7 mb -
Switch
Allied Telesis AT-9900s
38 pages 0.43 mb -
Switch
Allied Telesis AT-8900 Series
5 pages 0.14 mb -
Switch
Allied Telesis 48W
7 pages 0.51 mb -
Switch
Allied Telesis AT-8848
8 pages 0.23 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Allied Telesis X8106, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Allied Telesis X8106 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Allied Telesis X8106. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Allied Telesis X8106 should contain:
- informations concerning technical data of Allied Telesis X8106
- name of the manufacturer and a year of construction of the Allied Telesis X8106 item
- rules of operation, control and maintenance of the Allied Telesis X8106 item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Allied Telesis X8106 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Allied Telesis X8106, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Allied Telesis service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Allied Telesis X8106.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Allied Telesis X8106 item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
613-001835 Rev. A SwitchBlade x8106 Layer 3+ Chassis Switch A T -SBx8106 Chassis A T -SBx81GT24 Line Card A T -SBx81GT40 Line Card A T -SBx81GP24 P oE Line Card A T -SBx81GS24a SFP Line Card A T -SBx81XS6 SFP+ Line Card A T -SBx81CFC400 Controller Fabr ic Card A T -SBxPWRSYS1 A C System P ow er Supply A T -SBxPWR[...]
-
Page 2
Copyright 2013 Allied Telesis, Inc. All rights reserved. No part of this publication may be repr oduced without prior written permission from Allied Telesis, Inc. Allied Telesis, AlliedWare Plus, and the Allied Tele sis logo are trademarks of Allied Telesis, Incorporated. All other product names, company names, l ogos or other designations men [...]
-
Page 3
3 Electrical Safety and Emissions S tandards This product meets the following standards. EMI/RFI Emissions: FCC Class A, EN55022 Class A, EN61000-3-2, EN6100 0-3-3, CISPR Class A, VCCI Class A, AS/NZS Class A Immunity: EN55024 Electrical Safety: EN60950-1 (TUV), UL 60950-1 ( C UL US ), EN60825 Safety Agency Ap provals: C UL US , TUV, C-TICK, CE U.S[...]
-
Page 4
SwitchBlade x8106 Chassi s Switch Installation Guide 4 T ranslated Safety S tatements Important: The indicates tha t a translation of the safety statement is available in a PDF document titled “Translated Safety Statements” on our web site at http://www.alliedtelesis.co m/support .[...]
-
Page 5
5 Preface ............... ................... ................... ....................... ................... .................... ............ ....................... ...... 15 Safety Symbols Used in this Document .............. ....................... ...................... ....................... ......... ................ 16 Contacting Allied T[...]
-
Page 6
Contents 6 AT-SBxPWRSYS1 DC P ower Supply .............. ............. .......... ................... .................... ...................... ....... ..... 57 LEDs ... .................... ................... ....................... ................... .................... ................... ............. .................. 58 AT-SBxFAN06 Modu[...]
-
Page 7
SwitchBlade x8106 Chassi s Switch Installation Guide 7 Monitoring the Initialization Process . ................ ... ................... .................... ...................... ......... .................... . 177 Using the LEDs to Monitor the Initialization Proc ess .................... .................... ...................... ............. [...]
-
Page 8
Contents 8[...]
-
Page 9
9 Figur e s Figure 1: AT-SBx8106 Chassis ......... ........................................................ ........... ............ ........... ........ .................... ............ 20 Figure 2: Ethernet Line Cards and Control ler Card .... ....................... ................... .................... ............ ................... .....[...]
-
Page 10
List of Figures 10 Figure 50: Unlocking the Handle on the AT-SBxPWRSYS1 Powe r Supply ................... ................. .................... ...... ........ .. 94 Figure 51: Inserti ng the AT-SBxPWRSYS1 Power Supp ly .............. ............................ ............ ...................... ................. ..... 95 Figure 52: Low ering t[...]
-
Page 11
SwitchBlade x8106 Chassi s Switch Installation Guide 11 Figure 110: Attaching the Bare Grounding Wire to the Gr ounding Post .......... .................................................. ... ............. 156 Figure 111: Securing the Bare Grou nding Wire to the Gr ounding Post.............. ................... .................... ........ ...... .[...]
-
Page 12
List of Figures 12[...]
-
Page 13
13 Table 1. Twisted Pair Cable for the AT-SBx81GT24 and AT -SBx81GT40 Line Cards ..................... ....................... ..... ..... 33 Table 2. Twisted Pair Cable for the AT-SBx81GP24 Line Card ....................... ................... .................... ..... ...... ................ 34 Table 3. IEEE802.3af and IEEE802.3at Powered Device[...]
-
Page 14
List of Tables 14[...]
-
Page 15
15 Pr eface This guide contains the hardware in stallation instructions for the Layer 3+ SwitchBlade x8106 Chassis Switch. The preface contain s the following sections: “Safety Symbols Used in this Document” o n page 16 “Contacting Allie d T elesis” on p age 17 Note This version of the installation guide applies to rele ase 5.4.3 of[...]
-
Page 16
Preface 16 Safety Symbols Used in this Document This document uses the following conventions. Note Notes provide additional informatio n. Caution Cautions inform you t hat performing or omitting a specific actio n may result in equipment damage or loss of data. Warning Warnings inform you that performing or omitting a specific action may result in [...]
-
Page 17
SwitchBlade x8106 Chassi s Switch Installation Guide 17 Contacting Allied Telesis If you need assistance with this prod uct, you may contact Allied Telesis technical support by going to the Suppo rt & Services section of the Allied Telesis web site at www.alliedtelesis.com/support . You can find links for the following services on this page: ?[...]
-
Page 18
Preface 18[...]
-
Page 19
19 Chapter 1 Overview This chapter describes the La yer 3+ SwitchBlade x8106 Chassis Switch in the following sections: “Introduction” on p age 20 “A T -SBx8106 Chassis” on page 23 “A T -SBx81GT24 Line Card” on p age 27 “A T -SBx81GT40 Line Card” on p age 28 “A T -SBx81GP24 PoE Line Card” on page 2 9 “A [...]
-
Page 20
Chapter 1: Ove rview 20 Introduction The SwitchBlade x8106 product is a modular Layer 3+ Ethernet switch. The main components are the AT-SBx8106 Chassis, Ethe rnet line cards, a controller card. system powe r supplies, Power over Ethernet Plus (PoE+) power supply, and fan m odule. The AT-SBx8106 Chassis is shown in Figure 1. Figure 1. AT-SBx8106 Ch[...]
-
Page 21
SwitchBlade x8106 Chassi s Switch Installation Guide 21 Figure 3. Ethernet Line Cards an d Controller Card (Continued) Figure 4 illustrates th e power supply modules. Figure 4. Power Supply Units AT-SBx81GS24a SFP Ethernet Card with 24 slots for 100 or 1000Mbps, fiber optic or twisted pair SFP transceivers. AT-SBx81XS6 SFP+ Ethernet Card with six s[...]
-
Page 22
Chapter 1: Ove rview 22 Figure 5 illustrates the fan module. Figure 5. Fan Module AT-SBxFAN06 Module. The cooling module for the chassis.[...]
-
Page 23
SwitchBlade x8106 Chassi s Switch Installation Guide 23 AT-SBx8106 Chassis The AT-SBx8106 Chassis is a 4RU unit with slots for fou r Ethernet line cards, two controller cards, two system power supply modules, and two PoE power supply modu les. The chassis components are identified in Figure 6 here and Figure 7 on page 24. Figure 6. Front View of th[...]
-
Page 24
Chapter 1: Ove rview 24 Figure 7. Rear View of the AT-SBx8106 Chassis Figure 8 is an example of a fully populated chassis. Figure 8. AT-SBx8106 Chassis with Line Cards, Controller Cards, and Power Supplies Ethernet Line and Controller Cards Slots The chassis has slots for four Ethernet line cards and two AT- SBx81CFC400 Controller Fabric Cards. The[...]
-
Page 25
SwitchBlade x8106 Chassi s Switch Installation Guide 25 Figure 9. Ethernet Line and Controller Cards Slots Slots 1 to 4 are for the Et hernet line cards. The cards may be installed in any order or variety in the slots. Slots 5 and 6 are for the AT-SBx81CFC400 Controller Fabric Card. The chassis must be at least one controller ca rd. You may add a s[...]
-
Page 26
Chapter 1: Ove rview 26 power so that the chassis can support more powere d devices and adds power redundancy. For more information, re fer to “Power over Ethernet on the AT-SBx81GP24 Line Card” on p age 35. Slots C and D are for the AT-SBxPWRSYS1 Power Supply, which powers all the hardware components of the chassis, except for the PoE feature [...]
-
Page 27
SwitchBlade x8106 Chassi s Switch Installation Guide 27 AT-SBx81GT24 Line Card The AT-SBx81GT24 Line Card, shown in Figure 1 1, is a Gigabit Ethernet switch. Figure 11. AT-SBx81GT24 Line Card Here are the main features of the line card: 24 10/100/1000Base-T ports RJ-45 connectors 100 meters (328 feet) maximum op erating distance per por[...]
-
Page 28
Chapter 1: Ove rview 28 AT-SBx81GT40 Line Card The AT-SBx81GT40 Line Card, shown in Figure 12, is a Gigabit Ethernet switch. Figure 12. AT-SBx81GT40 Line Card Here are the main fe atures of the line card: 40 10/100/1000Base-T ports RJ point 5 connectors 100 meters (328 feet) maximum operating distance per port Auto-Negotiation for s[...]
-
Page 29
SwitchBlade x8106 Chassi s Switch Installation Guide 29 AT-SBx81GP24 PoE Line Card The AT-SBx81GP24 PoE Line Card, s hown in Figure 13, is a Gigabit Ethernet switch with Power over Ethernet Plus (PoE+) on all the port s. Figure 13. AT-SBx81GP24 PoE Line Card Here are the main features of the line card: 24 10/100/1000Base-T ports RJ-45 conne[...]
-
Page 30
Chapter 1: Ove rview 30 AT-SBx81GS24a SFP Line Card The AT-SBx81GS24a SFP Line Card, shown in Figu re 14, is a Gigabit Ethernet switch. Figure 14. AT-SBx81GS24a SFP Lin e Card Here are the main fe atures of the line card: 24 slots for small form-factor pluggable (SFP) transceivers Supports 100Base-FX and 1000Base-SX/LX fiber optic transceiv[...]
-
Page 31
SwitchBlade x8106 Chassi s Switch Installation Guide 31 AT-SBx81XS6 SFP+ Line Card The AT-SBx81XS6 Line Card, shown in Figure 15, is a 10 Gigabit Ethernet switch. Figure 15. AT-SBx81XS6 Line Ca rd Here are the main features of the line card: Six slots for 10Gbps SFP+ tra nsceivers Supports 10GBase-SR/LR fiber optic transceive rs Support[...]
-
Page 32
Chapter 1: Ove rview 32 10/100/1000Base-T Twisted Pair Ports This section applies to the 10/100/1000Base-T ports on the AT- SBx81GT24, AT-SBx81GT40, and AT-SBx81GP24 PoE Ethernet Line Cards. Connector Type The ports on the AT-SBx81GT24 and AT-SBx81GP24 Line Cards have 8- pin RJ-45 connectors. The ports on the AT-SBx81GT40 Line Card have 8- pin RJ p[...]
-
Page 33
SwitchBlade x8106 Chassi s Switch Installation Guide 33 Maximum Distance The ports have a maximum operating distance of 100 meters (328 feet). Cable Requirements The cable requirements for the ports on th e AT-SBx81GT24 and AT- SBx81GT40 Line Cards are listed in Table 1. Note Patch cables for the AT-SBx81GT40 Li ne Card, in len gths of 1 meter and [...]
-
Page 34
Chapter 1: Ove rview 34 Automatic MDIX Detection The 10/100/1000 Mbps twisted-pair ports on the AT-SBx81GT24, AT- SBx81GT40, and AT-SBx81GP24 Line Ca rds are IEEE 802.3ab complia nt and feature automatic MDIX detection when operating a t 10 or 100 Mbps. (Automatic MDIX detection does not apply to 1000 Mbps.) This feature automatically configures th[...]
-
Page 35
SwitchBlade x8106 Chassi s Switch Installation Guide 35 Power over Ethernet on the AT-SBx81GP24 Line Card This section applies to the AT-SBx81GP24 PoE Line Card. The twisted- pair ports on the line card support Powe r over Ethernet (PoE). PoE is a mechanism by which the ports supply p ower to network devices over the twisted pair cables that carry [...]
-
Page 36
Chapter 1: Ove rview 36 Power Budgeting The power for PoE on the ports on the AT-SBx81GP24 Line Card is provided by the AT-SBxPWRPOE1 Power Supply. It can provide up to 1200 watts of power for powered devices. You may install up to two power supplies in the chassis for a total of 2400 watts for the powered devices. The number of powered devices the[...]
-
Page 37
SwitchBlade x8106 Chassi s Switch Installation Guide 37 PDs that comply with the IEEE 802 .3af and 802.3at standards typically support both power delivery methods. Ho we ver, some legacy PDs support only one power delivery method. Legacy devices that only suppo rt Alternative B will not work with the AT-SBx81GP24 PoE Line Card. Legacy devices are n[...]
-
Page 38
Chapter 1: Ove rview 38 Port LEDs on the Ethernet Line Cards The following sections define the port LEDs on the Ethernet line cards. AT-SBx81GT24 Line Card Each port on the AT-SBx81GT24 Line Card has two LEDs. The LEDs are shown in Figure 16 and described in Ta ble 5. Figure 16. Port LEDs on the AT-SBx81GT24 Line Card Table 5. Port LEDs on the AT-S[...]
-
Page 39
SwitchBlade x8106 Chassi s Switch Installation Guide 39 AT-SBx81GT40 Line Card The LEDs for a port on the AT-SBx81GT40 Line Card are found on the RJ point 5 cable connector. The LEDs are shown in Figure 17 . Figure 17. Port LEDs on an RJ Point 5 Cable Connector f or the AT- SBx81GT40 Line Card Only the left LED is active. Refer to Figure 18 on page[...]
-
Page 40
Chapter 1: Ove rview 40 Figure 18. Port LEDs on an RJ Po int 5 Cable Connector for the AT- SBx81GT40 Line Card Table 6. Port LEDs on the AT-SBx81GT40 Line Card LED State Description L/A Solid Green The port has established an 1000 Mbps link to a network device. Flashing Green The port is transmitting or receiving data at 1000 Mbps. Solid Amber The [...]
-
Page 41
SwitchBlade x8106 Chassi s Switch Installation Guide 41 AT-SBx81GP24 Line Card Each port on the AT-SBx81GP24 PoE Line Card has two LEDs. The LEDs are shown in Figure 19 and described in Table 7. Figure 19. Port LEDs on the AT-SBx81GP24 PoE L ine Card Table 7. Port LEDs on the AT-SBx81GP24 PoE Line Card LED State Description L/A Solid Green The port[...]
-
Page 42
Chapter 1: Ove rview 42 AT-SBx81GS24a Line Card The SFP slots on the AT-SBx81GS24a SFP Line Card have one LED each, as shown in Figure 20 and described in Table 8. Figure 20. Port LEDs on the AT-SBx81GS24a SFP Line Card PoE Off This LED state can result from the following conditions: The port is not connected to a PD. The PD is powered off [...]
-
Page 43
SwitchBlade x8106 Chassi s Switch Installation Guide 43 AT-SBx81XS6 Line Card The AT-SBx81XS6 Line Card has one LED for each SFP+ slot. The LED is shown in Figure 21 and describ ed in Table 9. Figure 21. SFP+ Slot LEDs on the AT-SBx81XS6 Line Card Off This LED state can result from the following conditions: The transceiver slot is empty. Th[...]
-
Page 44
Chapter 1: Ove rview 44 AT-SBx81CFC400 Controller Fabric Card The AT-SBx81CFC400 Controller Fabric Card h as three primary functions: Chassis Management — You may use the controller card to monitor and configure the Ethernet line cards in t he chassis. You may manage the chassis locally throu gh the Console RS-232 port on the controller card [...]
-
Page 45
SwitchBlade x8106 Chassi s Switch Installation Guide 45 The components on the card are ide ntified in Figure 22. Figure 22. AT-SBx81CFC400 Controller Fabric Card Where two controller cards are installed in the cha ssis, they provide an active/active architecture. The packet proce ssors on both controller cards are fully utilized to double th e avai[...]
-
Page 46
Chapter 1: Ove rview 46 Table 10. SYS (System) Status LEDs LED State Description CFC Solid Green Indicates that the AT-SBx81CFC400 Controller Fabric Card is operating n ormally as the active master controller card . Flashing Green Indicates that the controller card is initializi ng its AlliedWare Plus Operating System or synchronizing its database [...]
-
Page 47
SwitchBlade x8106 Chassi s Switch Installation Guide 47 SBx STATUS LEDs The SBx LINECARD STATUS LEDs display genera l status information about the Ethernet line cards and controller cards. There are twelve LEDs, numbered 1 to 12. Only LEDs 1 to 6 are used . They correspond to slots 1 to 6 in the AT-SBx8106 Chassis. LEDs 7 to 12 are not used. If the[...]
-
Page 48
Chapter 1: Ove rview 48 eco-friendly Button You may use the eco-fr iendly button on the controller card to turn the LEDs on or off. You may turn off the LEDs when you are not using the m to monitor the control and Ethernet line cards, to conserve electricity. When the LEDs are off, the overall power consump tion of the c hassis is slightly reduced,[...]
-
Page 49
SwitchBlade x8106 Chassi s Switch Installation Guide 49 Note The available bandwidth across t he backplane of the chassis is reduced from 80 Gbps p er slot to 40 Gbps per slot for about one minute while the reset controller card initializes its AlliedWare Plus Operating System. This may reduce network performance. If the chassis has two control[...]
-
Page 50
Chapter 1: Ove rview 50 Table 12. Features that Use the NET MGMT Port Feature Description Ping Used to test the NET MGMT port for network connectivity . FTP client Used with an FTP server on you r network to download files to or upload files from the controller card. RADIUS client Used for remote management authentication and 802.1x port- based net[...]
-
Page 51
SwitchBlade x8106 Chassi s Switch Installation Guide 51 The NET MGMT port has a standard RJ -45 8-pin connector and operates at 10, 100, or 1000 Mbps in either ha lf- or full-duplex mode. The cable requirements for this port are the same a s the ports on the AT- SBx81GT24 Line Card, listed in Table 1 on page 33. For the port pinouts, refer to “Po[...]
-
Page 52
Chapter 1: Ove rview 52 USB Port The USB port supports a flash drive. You may use a flash drive to perform the following management functions: Store backup copies of the master configur ation and database files on the AT-SBx81CFC400 Controller Fabric Card . Transfer master confi guration files between controller cards in different chassis t[...]
-
Page 53
SwitchBlade x8106 Chassi s Switch Installation Guide 53 AT-SBxPWRSYS1 AC Power Supply The AT-SBxPWRSYS1 AC Power Supply, shown in Figure 23, is the power supply unit for the chassis. It supplies power to all the hardware components in the chassis, except for the PoE fea ture on the ports on the AT-SBx81GP24 Line Cards. T he PoE feature is powered b[...]
-
Page 54
Chapter 1: Ove rview 54 DC Solid Green The power supply is providing DC power that is within the normal operating range . Off The power supply is not generating DC power or the power is outside the normal operating ra nge. Fault Solid Amber A power supply has detected a fault condition, such as an under-voltage, or o ver-temperature condition. Off [...]
-
Page 55
SwitchBlade x8106 Chassi s Switch Installation Guide 55 AT-SBxPWRPOE1 Power Supply The AT-SBxPWRPOE1 Power Supply, shown in Figure 24, provide s the PoE power for the ports on the AT-SBx81GP24 PoE Line Cards. You may install either one or two PoE power supplies in the chassis. The AT-SBxPWRPOE1 Power Supply provides 1200 watts o f power for PoE. Yo[...]
-
Page 56
Chapter 1: Ove rview 56 Table 15. AT-SBxPWRPOE1 Power Supply LEDs LED State Description AC Solid Green The power supply is receivin g AC power that is within the normal operating range. Off The power supply is not receiving p ower from the AC power sourc e. DC Solid Green The DC power provided by the power supply to the line cards over the backplan[...]
-
Page 57
SwitchBlade x8106 Chassi s Switch Installation Guide 57 AT-SBxPWRSYS1 DC Power Supply The AT-SBxPWRSYS1 DC Power Supply, shown in Figure 2 5, is a DC version of the power supply unit fo r the chassis and may be used in pla ce of the AT-SBxPWRSYS1 AC Power S upply in network environments that have DC wiring. Like the AC power supply, the module supp[...]
-
Page 58
Chapter 1: Ove rview 58 Note Given that the AT-SBxPWRSYS1 DC Power Supply is not compatible with the AT-SBxPWRPOE1 AC Power Supply, a chassis that contains one or more AT-SBx81GP24 PoE Line Cards shou ld use the AT-SBxPWRSYS1 AC Power Supply, and not the DC module, as the system power unit. LEDs The LEDs on the power supply are described in Table 1[...]
-
Page 59
SwitchBlade x8106 Chassi s Switch Installation Guide 59 AT-SBxFAN06 Module The AT-SBxFAN06 Module is the cooli ng unit for the chassis. Refer to Figure 26. It is a field- replaceable as sembly that is installed in the AT- SBx8106 Chassis at the factory. The fan speeds are automatically controlled by the AT-SBx81CFC400 Controller Fabric Card, accord[...]
-
Page 60
Chapter 1: Ove rview 60 Power Supply Interfaces (Opto-couplers) The chassis has two power supply interfaces, also referred to as opto- couplers, in the lower right corner on the rear panel. The interfaces, labeled Power Supply Interface, are used by the active master controller card to obtain status information from the power supplies. The interfac[...]
-
Page 61
SwitchBlade x8106 Chassi s Switch Installation Guide 61 Table 18. Power Supply Interface LED LED State Description Power Solid Green The interface is operating normally. Off Here are the possible conditions for this LED state: The corresponding power supply slots of the interface are empty. The power supplies in the power supply slots are p[...]
-
Page 62
Chapter 1: Ove rview 62 AlliedWare Plus Software Releases for the Hardware Components Table 19 lists the releases of the Al liedWare Plus Operating Syste m for the hardware components of the SwitchBlade x8106 Ch assis Switch. Table 19. AlliedWare Plus Operating Syste m Releases for the Hardware Components Model Number Initial Release A T -SBx8106 C[...]
-
Page 63
63 Chapter 2 Safety Pr ecautions and Site Requir ements This chapter contains the safety prec autions an d guidelines for selecting a site for the chassis. The chapter contain s the following sections: “Reviewing Safety Precautions” on p age 64 “Selecting a Site for the SwitchBlade x8106” on p age 68 “Installation T ools and M[...]
-
Page 64
Chapter 2: Safety Precautions and Site Re quirements 64 Reviewing Safety Precautions Please review the following safety pr ecautions before you begin to install the switch. Note The indicates that a translation of the safety state ment is available for viewing in portable do cument format (PDF) titled Translated Safety Statements from ou r web [...]
-
Page 65
SwitchBlade x8106 Chassi s Switch Installation Guide 65 Note Pluggable Equipment. The socket outl et shall be installed near the equipment and shall be easily accessible. E5 Caution Air vents must not be blo cked and must have free access to the room ambient air for cooling. E6 Warning Operating T emperature. This product is designed for a [...]
-
Page 66
Chapter 2: Safety Precautions and Site Re quirements 66 Warning Mounting of the equipment in the rack should be such that a hazardous condition is not created due to uneven mechanical loading. E25 Warning The AT-SBxFAN06 Fan Module has hazard ous moving parts. Keep fingers away from moving fan blades. Warning Remove all metal jewelry , such as [...]
-
Page 67
SwitchBlade x8106 Chassi s Switch Installation Guide 67 Warning Reliable earthing of rack-mounted equipment should be maintained. Particular attention should be giv en to supply connections other than direct connections to the branch circ uit s (e.g., use of power strips). E37 Warning T o reduce the risk of electric shock, the PoE ports on this[...]
-
Page 68
Chapter 2: Safety Precautions and Site Re quirements 68 Selecting a Site for the SwitchBlade x8106 Please perform the following procedure to determine the suitability of the site for the chassi s: 1. Verify that the equipment rack is sa fely secured so that it will not tip over. You should in stall devices starting at the bottom of the rack, with t[...]
-
Page 69
SwitchBlade x8106 Chassi s Switch Installation Guide 69 Figure 28. 100 - 125 VAC 125 V NEMA 5-2 0 Plug and Receptacle[...]
-
Page 70
Chapter 2: Safety Precautions and Site Re quirements 70 Installation Tools and Material This section lists the tools and materia l you need to supply to install the product: Here are the items for installin g the chassis in an equipment rack: #2 Phillips-head screwdriver Six equipment rack screws Flat-head screwdriver #2 Phillips-he[...]
-
Page 71
71 Chapter 3 Installing the Chassis in an Equipment Rack This chapter describes how to inst all the AT-SBx8106 Chassis in an equipment rack. This chapter contains the following sections: “Required T ools and Material” on page 72 “Preparing the Eq uipment Rack” on page 73 “Unpacking the A T -SBx8106 Chassis” on page 76 ?[...]
-
Page 72
Chapter 3: Inst alling the Chassis in an Equi pment Rack 72 Required Tools and Material You need the following too ls and material to install the pro duct in an equipment rack: #2 Phillips-head screwdriver Six equipment rack screws Flat-head screwdriver #2 Phillips-head 10 inch-lbs to rque screwdriver (optional) Warning The chassis [...]
-
Page 73
SwitchBlade x8106 Chassi s Switch Installation Guide 73 Preparing the Equipment Rack To prepare the equipment rack for the AT-SBx8106 Chassis, perform the following procedure: Caution The chassis is heavy and should be mounted as low as possible in the equipment rack to maxi mize vertical stability. 1. Reserve 190.0 mm (7.5“) of vertical rack spa[...]
-
Page 74
Chapter 3: Inst alling the Chassis in an Equi pment Rack 74 Figure 29. Reserving Vertical Rack Space 190.0 mm (7.5“) 152.4 mm (6”0) 342.4 mm (13.5”)[...]
-
Page 75
SwitchBlade x8106 Chassi s Switch Installation Guide 75 3. Identify the lowest 1/2” screw hole pattern on the rack mounting rails within the space reserved for the AT-SBx8106 Chassis. 4. Install one rack mount screw in each vertical rail, at the same height in the top screw hole of the lowest 1/2” hole patt ern, as shown in Figure 30. Do not fu[...]
-
Page 76
Chapter 3: Inst alling the Chassis in an Equi pment Rack 76 Unpacking the AT-SBx8106 Chassis To unpack the AT-SBx8106 Chassis, perform the following procedure : 1. Remove all components from the shipping pa ckage. 2. Verify the contents of the shippi ng container by referr ing to Figure 31 here and Figure 32 on page 77. I f any item is missing or d[...]
-
Page 77
SwitchBlade x8106 Chassi s Switch Installation Guide 77 Figure 32. Components of the AT-SBx8 106 Chassis (Continued) T wo equipment rack brackets pre-installe d on the sides of the chassis. One shipping brace pre-installed diagonally across the line card slots on the front panel One wrist strap[...]
-
Page 78
Chapter 3: Inst alling the Chassis in an Equi pment Rack 78 Removing the Rubber Feet The chassis comes with rubber feet on the base panel for t abletop installation, which is not recomm ended for this product. Allied Telesis recommends removing the feet befo re installing the chassis in the equipment rack. To remove the rubber feet, pe rform the fo[...]
-
Page 79
SwitchBlade x8106 Chassi s Switch Installation Guide 79 Figure 34. Removing the Rubber Feet 3. Turn the chassis over. Go to the next procedure, “Adjusting the Equipment Rack Brackets” on page 80.[...]
-
Page 80
Chapter 3: Inst alling the Chassis in an Equi pment Rack 80 Adjusting the Equipment Rack Brackets The chassis has two pre-installed equipment rack brackets. You may adjust the brackets so that the front o f the chassis is flush with, extends beyond, or is recessed behind the front of the equipment rack. You ma y also install the brackets so that th[...]
-
Page 81
SwitchBlade x8106 Chassi s Switch Installation Guide 81 Figure 35. Rack Mounting Bracket Locations Figure 36. Rack Bracket Locatio ns for Reverse Position of Chassis Factory Installed - Fl ush with Rack Rails A B C D E “Dim X” “Dim X” “Dim X” “Dim X” F Front panel facing towards the rear of the equipment rack.[...]
-
Page 82
Chapter 3: Inst alling the Chassis in an Equi pment Rack 82 Installing the Chassis in the Equipment Rack The procedure in this section exp lains how to install the chassis in the equipment rack. The procedure require s the following items: #2 Phillips-head screwdriver (not provided) Six equipment rack screws (not provided) #2 Phillips-h[...]
-
Page 83
SwitchBlade x8106 Chassi s Switch Installation Guide 83 2. Lift the AT-SBx8106 Chassis into the equipment rack an d set the bottom of the equipment rack brac kets firmly on the two equipment rack screws you installed in “Preparing the Equipment Rack” o n page 73, as shown in Figure 37. Figure 37. Lifting the AT-SBx8106 Chassis into the Equipmen[...]
-
Page 84
Chapter 3: Inst alling the Chassis in an Equi pment Rack 84 Figure 38. Installing the Ra ck Mount Screws 5. Tighten all six screws shown in Figure 39 on page 85 to secure the chassis to the equipment rack, Al lied Telesis recommends tightening the screws to 10 inch-lbs. Screws Screws[...]
-
Page 85
SwitchBlade x8106 Chassi s Switch Installation Guide 85 Figure 39. Tightening the Rack Mount Screws 6. Go to “Removing the Shipping Brace” on page 86. Screws Screws[...]
-
Page 86
Chapter 3: Inst alling the Chassis in an Equi pment Rack 86 Removing the Shipping Brace Now that the chassis is installed in the equipment rack, you may remove the shipping brace from the front of the unit. To remove the shipping brace, remove the six mounting screws with a #2 Phillip s-head screwdriver (not provided). Refer to Figure 40. Figure 40[...]
-
Page 87
SwitchBlade x8106 Chassi s Switch Installation Guide 87 Installing the Chassis Grounding Lug This procedure explains how to connec t a gro unding wire to the chassis. The chassis requires a permane nt connection for the line cards and power supplies to a good earth ground. The procedure requires the following items: Grounding lug (pre-installed[...]
-
Page 88
Chapter 3: Inst alling the Chassis in an Equi pment Rack 88 3. Insert one end of the groundin g wire into the grounding lug, as shown in Figure 43, and use a crimping tool to secu re the wire to the grounding lug. Figure 43. Attaching the Gr ounding Wire to the Grounding Lug 4. Install the grounding lug on the rear panel of the chassis, as shown in[...]
-
Page 89
89 Chapter 4 Installing the Power Supplies This chapter explains how to install t he power supplies. It ha s the following sections: “Protecting Against Electrost atic Discharge (ESD)” on page 90 “Installing the A T -SBxPWRSYS1 AC System Power Supply” on page 91 “Installing the A T -SBxPWRPOE1 PoE Power Supply” on page 97 ?[...]
-
Page 90
Chapter 4: Inst alling the Power Suppl ies 90 Protecting Against Electrostatic Discharge (ESD) To protect the equipment from damage by Electrostatic Discharg e (ESD) during the installation proce dure, observe proper ESD protection when handling the SwitchBlade x8106 line cards and po wer supplies. You should be properly grounde d with a wrist or f[...]
-
Page 91
SwitchBlade x8106 Chassi s Switch Installation Guide 91 Installing the AT-SBxPWRSYS1 AC System Power Supply For background information on the AT-SBxPWRSYS1 Power Supply, refer to “AT-SBxPWRSYS1 AC Power Supply” on page 53. The chassis must have at least one AT-SBxPWRSYS1 Powe r Supply. Warning The electronic components in the AT-SBxPWRSYS1 Powe[...]
-
Page 92
Chapter 4: Inst alling the Power Suppl ies 92 Figure 47. Removing the Blank Slot Cover from Power Supply Slot C 3. Remove the new AT-SBxPWRSYS1 Power Supply from the shipping package and verify the package contents, listed in Figure 48 on page 93. If any item is missing or damaged, cont act your Allied T elesis sales representative for assist ance.[...]
-
Page 93
SwitchBlade x8106 Chassi s Switch Installation Guide 93 Figure 48. Items Included with the AT-SBxPWRSYS1 Power Supply Module Note Store the packaging material in a safe location. You must use the original shipping material if you need t o return the unit to Allied Telesis. Note The tie wrap is used to secure the power cord to the chassis, as explai[...]
-
Page 94
Chapter 4: Inst alling the Power Suppl ies 94 4. Check the power supply for its model name, shown in Figure 49, to verify the module. If the module is the A T -SBxPWRPOE1 PoE Power Supply , do not continue with this procedure. Instead, perform “Installing the A T - SBxPWRPOE1 PoE Power Supply” on page 97. Figure 49. Verifying the AT-SBxPWRSYS1 [...]
-
Page 95
SwitchBlade x8106 Chassi s Switch Installation Guide 95 6. Align and insert the AT-SBxPWRS YS1 Po wer Supply into the power supply slot. Figure 51 shows the pow er supply installed in slot D. Figure 51. Inserting the AT-SBxPWRSYS1 Power Supply[...]
-
Page 96
Chapter 4: Inst alling the Power Suppl ies 96 7. Lower the power supply locking handle to se cure the power supply to the chassis, as shown in Figure 52. Figure 52. Lowering the Handle on the AT-SBxPWRSYS1 Power Supply 8. To install a second AT-SBxPWRSYS1 Power Supply, repeat this procedure. After installing the AT-SBxPWRSYS1 Power Supples, do one [...]
-
Page 97
SwitchBlade x8106 Chassi s Switch Installation Guide 97 Installing the AT-SBxPWRPOE1 PoE Power Supply This section contains the installa tion procedure for the AT -SBxPWRPOE1 Power Supply, for the PoE+ ports on the AT-SBx81GP24 PoE Line Card. For background information, refer to “AT-SBxPW RPOE1 Power Supply” on page 55. Caution The electronic c[...]
-
Page 98
Chapter 4: Inst alling the Power Suppl ies 98 Figure 53. Removing the Blank Slot Cover from Power Supply Slot A 3. Remove the power supply from the shipping package and verify that the shipping package contains the items listed in Figure 54 on page 99. If any item is missing or damaged, cont act your Allied T elesis sales representative for assist [...]
-
Page 99
SwitchBlade x8106 Chassi s Switch Installation Guide 99 Figure 54. Items Included with the AT-SBxPWRPOE1 Power Supply Module Note Store the packaging material in a safe location. You must use the original shipping material if you need t o return the unit to Allied Telesis. Note The tie wrap is used to secure the power cord to the chassis in “Powe[...]
-
Page 100
Chapter 4: Inst alling the Power Suppl ies 100 4. Check the model name, shown in Figure 55, to verify the module. If the module is the A T -SBxPWRSYS1 System Power Supply , do not continue with this procedure. Instead, perform “Installing the A T - SBxPWRSYS1 AC System Power Supply” on page 91 . Figure 55. Verifying the AT-SBxPWRPOE1 PoE Power [...]
-
Page 101
SwitchBlade x8106 Chassi s Switch Installation Guide 101 Figure 57. Inserting the AT-SBxPWRPOE1 Power Sup ply[...]
-
Page 102
Chapter 4: Inst alling the Power Suppl ies 102 7. Lower the locking handle of the po wer supply module to secure the module in the slot, as shown in Figure 58. Figure 58. Locking the Handle on the AT-SBxPWRPOE1 Power Supply 8. To install a second AT-SBxPWRPOE1 Powe r Supply, repeat this procedure. 9. After installing the AT-SBxPWRPOE1 Power Supplie[...]
-
Page 103
SwitchBlade x8106 Chassi s Switch Installation Guide 103 Installing the AT-SBxPWRSYS1 DC Power Supply This section contains the installati on procedure for the AT-SBxPWRSYS1 DC Power Supply. For background information, refer to “AT- SBxPWRSYS1 DC Power Supply” on page 57. Caution The electronic components in the AT-SBxPWRSYS1 DC Power Supply ca[...]
-
Page 104
Chapter 4: Inst alling the Power Suppl ies 104 Figure 59. Removing the Blank Slot Cover from Power Supply Slot C 3. Remove the power supply from the shipping package and verify that the shipping package contains the items listed in Figure 60 on page 105. If any item is missing or damaged, cont act your Allied T elesis sales representative for assis[...]
-
Page 105
SwitchBlade x8106 Chassi s Switch Installation Guide 105 Figure 60. Items Included with the AT-SBxPWRSYS1 DC Power Supply Module Note Store the packaging material in a safe location. You must use the original shipping material if you need t o return the unit to Allied Telesis. 4. With a #2 Phillips-head screwdriver, loosen the ha ndle locking screw[...]
-
Page 106
Chapter 4: Inst alling the Power Suppl ies 106 Figure 61. Loosening the Handle locking Screw on the AT-SBxPWRPOE1 DC Power Supply 5. Raise the locking ha ndle on the AT-SBxPWRPOE1 DC Power Supply, as shown Figure 62. Figure 62. Raising the Handle on the AT-SBxPWRPOE1 DC Power Supply 6. Align and insert the AT-SBxPWRSYS1 Module into slot C or D. Fig[...]
-
Page 107
SwitchBlade x8106 Chassi s Switch Installation Guide 107 Figure 63. Inserting the AT-SBxPWRSYS1 DC Power Supply[...]
-
Page 108
Chapter 4: Inst alling the Power Suppl ies 108 7. Lower the locking handle of the po wer supply module to secure the module in the slot, as shown in Figure 64. Figure 64. Locking the Handle on the AT-SBxPWRSYS1 Power Supply Note Do not tighten the handle lockin g screw yet. You may need to slightly lift the handle to move the plastic guard panel wh[...]
-
Page 109
109 Chapter 5 Installing the A T -SBx81CFC400 Contr oller and Ethernet Line Cards This chapter describes how to install the controller an d Ethernet line cards. The chapter has the following sections: “Guidelines to Handling the Controller and Line Cards” on p age 1 10 “Installing the A T -SBx81CFC400 Controller Fabric Card” on page[...]
-
Page 110
Chapter 5: Installi ng the AT-SBx81CFC400 Controller an d Ethernet Line Cards 110 Guidelines to Handling the Controller and Line Cards Please observe the follo wing guidelines when handl ing the controller and Ethernet line cards: The cards are hot swappable and can be installed or removed while the chassis is powered on. Always wear an ant[...]
-
Page 111
SwitchBlade x8106 Chassi s Switch Installation Guide 111 Figure 65. Aligning Card in Slot CORRECT INCORRECT INCORRECT[...]
-
Page 112
Chapter 5: Installi ng the AT-SBx81CFC400 Controller an d Ethernet Line Cards 112 Installing the AT-SBx81CFC 400 Controller Fabric Card This section contains the installation proced ure for the AT-SBx81CFC400 Controller Fabric Car d. You may install either one or two controller ca rds in the unit. The chassis must have at lea st one controller card[...]
-
Page 113
SwitchBlade x8106 Chassi s Switch Installation Guide 113 Figure 67. Items Included with the AT-SBx81CFC400 Controller Fabric Card Note Store the packaging material in a safe location. You should use the original shipping material if you need t o return the unit to Allied Telesis. 3. Carefully remove the controller card from the a nti-static bag. Re[...]
-
Page 114
Chapter 5: Installi ng the AT-SBx81CFC400 Controller an d Ethernet Line Cards 114 Figure 69. Opening the Lo cking Handles on the AT-SBx81CFC400 Controller Fabric Card 5. Remove the battery insulato r tab on the controller card by sliding it out from between the battery and batt ery clip, as shown in Figure 70. Figure 70. Removing the Battery I nsul[...]
-
Page 115
SwitchBlade x8106 Chassi s Switch Installation Guide 115 Figure 71. Aligning the AT-SBx81CF C400 Card in the Chassis Slot 7. Slowly and carefully slide the card into the slot. Caution Keep the card level with the chassis as you slide it into the slot. You might damage the components on the top or bottom of the card if you slide it in at an angle. R[...]
-
Page 116
Chapter 5: Installi ng the AT-SBx81CFC400 Controller an d Ethernet Line Cards 116 Figure 72. Closing the Locki ng Levers on the AT-SBx81CFC400 Controller Fabric Card 9. Finger tighten the two thumbscrews on the card t o secure the card to the chassis, as shown in Figure 73 on page 117.[...]
-
Page 117
SwitchBlade x8106 Chassi s Switch Installation Guide 117 Figure 73. Tightening the Thumb Sc rews on the AT-SBx81CFC400 Card 10. Tighten the screws with a #2 Phillips-head screwdriver to secure the controller card to the chassis. Allied T elesis recommends tightening the screws to 5 inch-lbs. 11. if you have a second AT-SBx81CFC400 Controller Fabric[...]
-
Page 118
Chapter 5: Installi ng the AT-SBx81CFC400 Controller an d Ethernet Line Cards 118 Installing the Ethernet Line Cards This section contains the installation procedure for the Ethernet line cards. The illustrations in the procedure show the AT-SBx81GP24 Line Card. The procedure is the same for all the card s. Note Please review “Guidelines to Ha nd[...]
-
Page 119
SwitchBlade x8106 Chassi s Switch Installation Guide 119 Figure 74. Removing an Ethern et Line Card from the Anti-static Bag 4. Align the line card with the internal chassis card guides in the selected slot in the chassis. Figure 75 shows an Ethernet line card aligned with slot 1. Figure 75. Aligning an Ethernet Line Ca rd in a Chassis Slot 5. Slow[...]
-
Page 120
Chapter 5: Installi ng the AT-SBx81CFC400 Controller an d Ethernet Line Cards 120 Caution Keep the card level with t he chassis as you slide it into the slot. You might damage the components on the top o r bottom of the card if you slide it in at an angle. Ref er to Figure 65 on page 111. Caution Do not force the card into the slo t. If you feel re[...]
-
Page 121
SwitchBlade x8106 Chassi s Switch Installation Guide 121 Figure 77. Tightening the Thumb Screws on an Ethernet Line Card 8. Tighten the two screws with a # 2 Ph illips-head screwdriver to secure the line card to the chassis. Allied T elesis recommends tightening the screws to 5 inch-lbs. 9. Repeat this procedure to install the rema ining Ethernet l[...]
-
Page 122
Chapter 5: Installi ng the AT-SBx81CFC400 Controller an d Ethernet Line Cards 122 Installing the Blank Slot Covers After installing the AT-SBx81CFC400 Controlle r Fabric Cards and Ethernet line cards, check the front panel for any unused slots and cover them with the blank slot covers incl uded with the chassis, as explained in this procedure. The [...]
-
Page 123
SwitchBlade x8106 Chassi s Switch Installation Guide 123 Figure 79. Tightening the Th umbscrews on a Blank Slot Cover 3. Tighten the two screws with a # 2 Ph illips-head screwdriver to secure the blank slot cover to the chassis. Allied T elesis recommends tightening the screws to 5 inch-lbs. 4. Repeat this procedure to cover the remaining empty slo[...]
-
Page 124
Chapter 5: Installi ng the AT-SBx81CFC400 Controller an d Ethernet Line Cards 124[...]
-
Page 125
125 Chapter 6 Installing the T ransceivers and Cabling the Ports This chapter describes how to install the fiber opt ic transceivers and attach the cables to the ports on the line cards. The chapter ha s the following sections: “Cabling Guidelines for the T wisted Pair Ports on the A T -SBx81GT24, A T -SBx81GP24, and A T -SBx81GT40 Line Cards[...]
-
Page 126
Chapter 6: Inst alling the Transceivers and Cabling the Ports 126 Cabling Guidelines for the Twisted Pair Ports on the AT-SBx81GT24, AT-SBx81GP24, and AT-SBx81GT40 Line Cards Here are the guidelines to cabli ng the 10/100 /1000Base-T twisted pair ports on the AT-SBx81GT24, AT- SBx81GP24, and AT-SBx81GT40 Line Cards: The 10/100/1000Base-T twiste[...]
-
Page 127
SwitchBlade x8106 Chassi s Switch Installation Guide 127 The default wiring configuration of the ports is automatic MDIX detection, which configures the MDI/MDIX setting automatically. This setting is appropriate for switch ports that are connected to network devices that also support the fe ature. The default wiring configuration of automa[...]
-
Page 128
Chapter 6: Inst alling the Transceivers and Cabling the Ports 128 Figure 81. Connecting Cables to Ports on the AT-SBx81GT40 Line Card Release tab Connecting a cable to a port in the top row. Connecting a cable to a port in the bottom row.[...]
-
Page 129
SwitchBlade x8106 Chassi s Switch Installation Guide 129 Guidelines to Installing SFP and SFP+ Transceivers Please review the following guidelines before installing fiber optic transceivers in the AT-SBx81GS24a and AT-SBx81XS6 Line Cards: You should install a tran sceiver in a line card before connecting its network cable. A fiber optic tra[...]
-
Page 130
Chapter 6: Inst alling the Transceivers and Cabling the Ports 130 Installing SFP Transceivers in the AT-SBx81GS24a Line Card Please review the information in “Gui delines to Installing SFP and SFP+ Transceivers” on page 129 before performing this procedure . To install SFP transceivers in AT-SBx81GS24a Line Cards, perform the following procedur[...]
-
Page 131
SwitchBlade x8106 Chassi s Switch Installation Guide 131 3. To install the transceiver in an SFP slot on the top row of the line card, orient the transceiver with the handle on top, as sh own in Figure 83. To install it into a slot on the bottom ro w of the line card, orient it with the handle on the bottom. Figure 83. Handle on SFP Transceiver 4. [...]
-
Page 132
Chapter 6: Inst alling the Transceivers and Cabling the Ports 132 Figure 85. Removing the Dust Cover from the SFP Tra nsceiver in the AT- SBx81GS24a Line Card Note The dust cover protects the fiber optic po rt on the SFP transceiver from dust contamination. It should not be removed until you are ready to connect the fiber optic cable. 6. Before con[...]
-
Page 133
SwitchBlade x8106 Chassi s Switch Installation Guide 133 7. Connect the fiber optic cable to the port on the transceiver, as shown in Figure 87. The connector should snap into the port. Figure 87. Attaching a Fiber Opt ic Cable to an SFP Transceiver in the AT- SBx81GS24a Line Card 8. Repeat this procedure to inst all ad ditional SFP transceivers. A[...]
-
Page 134
Chapter 6: Inst alling the Transceivers and Cabling the Ports 134 Installing SFP+ Transceivers in the AT-SBx81XS6 Line Card Please review the information in “Gui delines to Installing SFP and SFP+ Transceivers” on page 129 before performing this procedure . To install 10 Gbps SFP+ transceive rs in the AT-SBx81XS6 Line Card, perform the followin[...]
-
Page 135
SwitchBlade x8106 Chassi s Switch Installation Guide 135 Figure 89. Handle on SFP+ Transceiver 3. Slide the transceiver into the slot unt il it clicks into place , as shown in Figure 90. Figure 90. Installing an SFP+ Transceive r in the AT-SBx81XS6 Line Card Note If you are ready to attach the fiber opt ic cable to the transceiver, continue with th[...]
-
Page 136
Chapter 6: Inst alling the Transceivers and Cabling the Ports 136 Figure 91. Removing the Dust Cover from an SFP+ Transceiver in the AT- SBx81XS6 Line Card Note The dust cover protects the fiber optic po rt on the SFP transceiver from dust contamination. It should not be removed until you are ready to connect the fiber optic cable. 5. Before connec[...]
-
Page 137
SwitchBlade x8106 Chassi s Switch Installation Guide 137 6. Connect the fiber optic cable to the port on the transceiver, as shown in Figure 93. The connector should snap into the port. Figure 93. Attaching a Fiber Optic Cable to an SF P+ Transceiver in the AT-SBx81XS6 Line Card 7. Repeat this procedure to install additional SFP plus transceivers i[...]
-
Page 138
Chapter 6: Inst alling the Transceivers and Cabling the Ports 138 Installing AT-SP10TW Cables in the AT-SBx81XS6 Line Card This procedure explains how to connect AT-SP10TW Cable s to the AT- SBx81XS6 Line Card. The cables may be used in place of fiber op tic cables and transceivers for 10 Gbps links o f up to 7 meters. Note The AT-SP10TW Cable is o[...]
-
Page 139
SwitchBlade x8106 Chassi s Switch Installation Guide 139 Figure 95. Release Tab on the AT-SBx81XS6 Line Card 3. Slide the connector into the slot u nti l it clicks into place, as shown in Figure 96. Figure 96. Installing the AT-SP10TW Cable in the AT-SBx81XS6 Line Card 4. Install the other end of the cable into an SFP+ slot on ano ther network devi[...]
-
Page 140
Chapter 6: Inst alling the Transceivers and Cabling the Ports 140 Note To remove the connector and cable from the SFP+ slot, gently push on the connector, pull on the release tab, and then slide the connector from the slot. After installing the AT-SP10TW Cables in th e AT-SBx81XS6 Line Card, do one of the following: To install and cable additio[...]
-
Page 141
SwitchBlade x8106 Chassi s Switch Installation Guide 141 Cabling the NET MGMT Port on the AT-SBx81CFC400 Card The controller card must have access to you r network to perform the management features in Table 12 on page 50. You can give the controller card access to your network either by configuring the Inband Interface, which enables the card to u[...]
-
Page 142
Chapter 6: Inst alling the Transceivers and Cabling the Ports 142 This setting is appropriate for port if it is connected to a net work device that also support the feature. The default wiring configuration of automa tic MDIX detection is not appropriate for the NET MGMT port if it is conn ected to a network device that does not support th e fe[...]
-
Page 143
143 Chapter 7 Powering On the Chassis This chapter describes how to power on the chassis and monitor the initialization process. The chap ter contains the following sections: “V erifying the Installation” on p age 144 “Powering On the A T -SBxPWRSYS1 AC Power Supply” on page 145 “Powering On the A T -SBxPWRPOE1 Power Supply”[...]
-
Page 144
Chapter 7: Po wering On the Chass is 144 Verifying th e Installation Please perform the following procedur e be fore powering on the chassis: 1. Verify that the grounding lug on the back panel of the chassis is properly grounded. For instructions, re fer to “Installing the Chassis Grounding Lug” on page 87. 2. Verify that all empty slots on the[...]
-
Page 145
SwitchBlade x8106 Chassi s Switch Installation Guide 145 Powering On the AT-SBx PWRSYS1 AC Power Supply The procedure in this section explains how to power on th e AT- SBxPWRSYS1 AC Power Supplies in slots C and D on the front panel. If you have not installed the power suppl ies, refer to “Inst alling the AT- SBxPWRSYS1 AC System Power Suppl y”[...]
-
Page 146
Chapter 7: Po wering On the Chass is 146 Figure 98. Connecting the AC Power Cord for the AT-SBxPWRSYS1 AC Power Supply 3. Use the twist tie included with the power supply to secu re the cord to an anchor on the chassis to protect it from be ing accidentally pulled out, as shown in Figure 99 on page 1 47.[...]
-
Page 147
SwitchBlade x8106 Chassi s Switch Installation Guide 147 Figure 99. Securing the Power Cord for the AT-SBxPWRSYS1 AC Power Supply to an Anchor 4. Connect the power cord to an appropria te AC power source to power on the power supp ly. 5. If the chassis has tw o AT-SBxPWRSYS1 AC System Power Supplies, repeat this procedure to power on the second pow[...]
-
Page 148
Chapter 7: Po wering On the Chass is 148 Powering On the AT-SBxPWRPOE1 Power Supply If you have not already installed the AT-SBxPWRPOE1 Power Supplies, refer to “Installing the AT-SBxPWRPOE1 PoE Power Supply” on pa ge 97 for installation instructions. To power on the power supplies, perform the following procedure: 1. Identify AC sockets A and [...]
-
Page 149
SwitchBlade x8106 Chassi s Switch Installation Guide 149 3. Use the twist tie that comes with the power supply to secure the cord to an anchor on the chassis, as shown in Figure 101. Figure 101. Securing the Power Cord f or the AT-SBxPWRPOE1 Power Supply to an Anchor 4. Connect the power cord to an appropria te AC power source to power on the power[...]
-
Page 150
Chapter 7: Po wering On the Chass is 150 Figure 102. Dress and Secure AC Po wer Cords 6. Go to “Monitoring the Initialization Process” on page 17 7.[...]
-
Page 151
SwitchBlade x8106 Chassi s Switch Installation Guide 151 Powering On the AT-SBxPWRS YS1 DC System Power Supply This section contains instructi ons on how to power on the AT- SBxPWRSYS1 DC Power Supply. For inst allation instructions, refer to “Installing the AT-SBxPWRSYS1 DC Power Supply” on page 103. The power supply unit has a grou nd connect[...]
-
Page 152
Chapter 7: Po wering On the Chass is 152 The components of the power supply are identified in Figure 103. Figure 103. Components of the AT-SBxPWRSYS1 DC Power Supply Warning As a safety precaution , install a circuit breaker with a minimum value of 50 Amps betwe en the equipment and the DC power source. Always connect the wires to the LAN equ ipmen[...]
-
Page 153
SwitchBlade x8106 Chassi s Switch Installation Guide 153 Choosing a Method for Attaching the Grounding Wire You may attach the grounding wire to the power supply using the supplied terminal, shown in Figure 104, or bare wire. Figure 104. Grounding Wire Terminal The two methods are described in the following sections: “Connecting the Grounding[...]
-
Page 154
Chapter 7: Po wering On the Chass is 154 3. Use an 8 mm wrench to remove the grounding post nut and washer, shown in Figure 107, from the power supply. Figure 107. Removing the Nut and Washer f rom the Grounding Post 4. Attach the grounding lug and wire to the grounding post and secure them with the nut and washer removed in th e previous step, and[...]
-
Page 155
SwitchBlade x8106 Chassi s Switch Installation Guide 155 Figure 108. Installing the Grounding Wire 5. Connect the other end of the gro unding wire to the building protective earth. Warning When installing this equipment, always ensure th at the power supply ground connection is installed first and discon nected last. E11 Note This system will w[...]
-
Page 156
Chapter 7: Po wering On the Chass is 156 Connecting the Grounding Wire with Bare Wire To attach the grounding wire to the power supply with bare wire, perform the following procedure: 1. Prepare an adequate length of so lid or stranded 10 AWG grounding wire by stripping it as shown in Figure 109. Figure 109. Stripping the solid or Stranded Groundin[...]
-
Page 157
SwitchBlade x8106 Chassi s Switch Installation Guide 157 4. Secure the wire with the nut and washer removed in step 2, and an 8 mm wrench, as shown in Figure 111. Figure 111. Securing the Bare Ground ing Wire to the Grounding Post After connecting the grounding wire, go to “Choosing a Method for Attaching the Power Wires” on page 158.[...]
-
Page 158
Chapter 7: Po wering On the Chass is 158 Choosing a Method for Attaching the Power Wires The AT-SBxPWRSYS1 DC Power Supply comes with the two sets of power wire terminals shown in Figure 112. You may use either set to connect the positive (+) and negative (-) wires to the terminal block on the power supply. The straight terminals are used to route [...]
-
Page 159
SwitchBlade x8106 Chassi s Switch Installation Guide 159 Figure 113. Stripping the Power Wires Note You must use stranded wires with the te rminal lugs. You may not use solid wires. 2. Insert the power wires into the terminals inclu ded with the power supply and use a crimping tool to secure the wires t o the terminals. See Figure 114. Figure 114. [...]
-
Page 160
Chapter 7: Po wering On the Chass is 160 Figure 115. On/Off Switch on the AT-SBxPWRSYS1 DC Power Supply 4. Use a #1 Phillips-head screwdriver to loosen the two screws on the plastic cover over the positive and negative terminals on t he power supply and slide the cover to the right, as shown in Figure 116 on page 161. You may need to slightly lift [...]
-
Page 161
SwitchBlade x8106 Chassi s Switch Installation Guide 161 Figure 116. Opening the Plastic Cover 5. Use a #3 Phillips-head screwdriver to remove the two screws from the positive and negative terminals, as shown in Figure 117 on page 162.[...]
-
Page 162
Chapter 7: Po wering On the Chass is 162 Figure 117. Removing the Terminal Screws 6. With a #3 Phillips-head screwdriver, connect the positive (+) p ower lead wire to the positive terminal on the power supply, with one of the terminal screws removed in the previous step. The positive terminal is on the left. You may attach the terminals with the wi[...]
-
Page 163
SwitchBlade x8106 Chassi s Switch Installation Guide 163 Figure 118. Connecting the Positive (+) Power Wire with a Straight Terminal 7. With a #3 Phillips-head screwdriver, connect the negative (-) power lead wire to the negative terminal o n the power supply, with the remaining terminal screw removed in step 5. The negative terminal is on the righ[...]
-
Page 164
Chapter 7: Po wering On the Chass is 164 Figure 119. Connecting t he Negative (-) Power Wire with a Straight Terminal Warning Check to see if there are any exposed copper strands coming from the installed wires. When this installation is done correctly there should be no exposed copper wire strands exten ding from the terminal block. Any exposed wi[...]
-
Page 165
SwitchBlade x8106 Chassi s Switch Installation Guide 165 Figure 120. Closing the Plastic Co ver over the Terminal Co nnectors Caution Do not over tighten th e screws or you may crack or break the p lastic cover. 9. With a #2 Phillips-head screwdriver, tighten the han dle locking screw to secure the power supply to the chassis. Se e Figure 121 on pa[...]
-
Page 166
Chapter 7: Po wering On the Chass is 166 Figure 121. Tightening the Han dle Locking Screw 10. Before attaching the power wire s fr om the power supply to the circuit breaker in the wiring closet, check that the circuit brea ker is off. 11. Connect the power wires to the circuit breaker. 12. Turn the circuit breaker on. 13. Turn the On/Off switch on[...]
-
Page 167
SwitchBlade x8106 Chassi s Switch Installation Guide 167 Connecting the DC Power Wires with the Right Angle Terminals To connect the DC power wires to the positive an d negative terminals on the power supply with the right angle termin als, perform the following procedure: 1. Prepare adequate lengths of two stranded 8 AWG power wires by stripping t[...]
-
Page 168
Chapter 7: Po wering On the Chass is 168 4. Using a #1 Phillips-head screwdriver, remove the two screws t hat secure the plastic cover over the positive and nega tive terminals and remove the plastic cover from the power supply, as sh own in Figure 124. You may nee d to lift the locking handle slightly to access the bottom screw. Figure 124. Removi[...]
-
Page 169
SwitchBlade x8106 Chassi s Switch Installation Guide 169 Figure 125. Removing the Terminal Screws 6. With a #3 Phillips-head screwdrive r, connect the positive (+) power lead wire to the positive terminal on th e power supply, with one of the terminal screws removed in the prev ious step. The positive terminal is on the left. Refer to Figure 126 on[...]
-
Page 170
Chapter 7: Po wering On the Chass is 170 Figure 126. Connecting the Positive (+) Power Wire with a Rig ht Angle Terminal 7. With a #3 Phillips-head screwdrive r, connect the negative (-) power lead wire to the negative termi nal on the power supply, with the remaining terminal screw removed in step 5. The ne gative terminal is on the right. Refer t[...]
-
Page 171
SwitchBlade x8106 Chassi s Switch Installation Guide 171 Figure 127. Connecting the Negative (-) Power Wire with a Right Angle Terminal Warning Check to see if there are any exposed copper strands coming from the installed wires. When this installation is done co rrectly there should be no exposed copp er wire strands extending from the terminal bl[...]
-
Page 172
Chapter 7: Po wering On the Chass is 172 Figure 128. Tightening the Han dle Locking Screw 9. Before attaching the power wires fr o m the power supply to the circuit breaker in the wiring closet, check that the circuit brea ker is off. 10. Connect the power wires to the circuit breaker. 11. Turn the circuit breaker on. 12. Turn the On/Off switch on [...]
-
Page 173
SwitchBlade x8106 Chassi s Switch Installation Guide 173 Connecting Bare DC Power Wires To attach bare lead wires to the positive and negative terminals on the power supply, perform the follo wing procedure: 1. Prepare adequate lengths of two solid or stranded 8 AWG DC power wires by stripping them as shown in Figure 129. Figure 129. Stripping Soli[...]
-
Page 174
Chapter 7: Po wering On the Chass is 174 Figure 130. Connecting the Positive Le ad Wire 5. Wrap the negative lead wire clockwise arou nd the remaining terminal screw and secure the screw and wire t o the negative terminal connection on the terminal block wi th a #3 Phillips-he ad screwdriver, as shown in Figure 131 on page 175. The n egative termin[...]
-
Page 175
SwitchBlade x8106 Chassi s Switch Installation Guide 175 Figure 131. Connecting the Nega tive Lead Wire Allied T elesis recommends tightening the screw to 30 to 40 inch-lbs. Warning Check to see if there are any exposed copper strands coming from the installed wires. When this installation is done co rrectly there should be no exposed copp er wire [...]
-
Page 176
Chapter 7: Po wering On the Chass is 176 7. With a #2 Phillips-head screwdriver, tighten the handle locking screw to secure the power supp ly to the chassis. See Figure 121 on page 166. 8. Before attaching the power wires fr om the power supply to the circuit breaker in the wiring closet, check that the circuit brea ker is off. 9. Connect the power[...]
-
Page 177
SwitchBlade x8106 Chassi s Switch Installation Guide 177 Monitoring the Initialization Process The line and controlle r cards perform an initialization proce ss when you power or reset the chassis. The initialization process takes approximately two minutes to complete. Th e line cards do not begin to forward traffic from their ports until the proce[...]
-
Page 178
Chapter 7: Po wering On the Chass is 178 Figure 132. Switch Initialization Messages Verifying re lease... OK Booting... Starting b ase/first... [ OK ] Mounting v irtual filesy stems... [ OK ] Allied Tele sis Inc. AlliedWare Plus (TM) v5 .4.3 Current rele ase filename: SBx3 1CFC400-5.4.3 .rel Original r elease filena me: SBx31CFC40 0-5.4.3.rel Built[...]
-
Page 179
SwitchBlade x8106 Chassi s Switch Installation Guide 179 Figure 133. Switch Initialization Messages (Cont inued) auth, bgpd, cntrd, epsr, exfx, hostd, hsl imi, imiproxy d, irdpd, lacp, lldp d, loopprot, mstp nsm, openhp id, ospf6d, o spfd, pdmd, pi md, ripd ripngd, rmo n, sflowd, vr rpd . . . Received even t network.active Loading con figuration fi[...]
-
Page 180
Chapter 7: Po wering On the Chass is 180[...]
-
Page 181
181 Chapter 8 V erifying the Hardwar e Operations of the Chassis This chapter describes how to ve rify the operations of the chassis. The chapter contains the following sections: “Using the LEDs to V erify the Chassis” on page 182 “Using Local Management to V eri fy the Chassis” on page 184 Note Allied Telesis recommends using both [...]
-
Page 182
Chapter 8: Verifyi ng the Hardware Operations of the Chassis 182 Using the LEDs to Verify the Chassis After powering on the chassis for the first time and waiting a minimum of two minutes for the line and controlle r cards to complete the initialization process, check the operatio nal status of the various hardware components by examining the LEDs,[...]
-
Page 183
SwitchBlade x8106 Chassi s Switch Installation Guide 183 preventing them from completing the initialization process. Power off the chassis and replace the cards. 5. To check the status of the Eth ernet line cards, inspect the SBx Linecard Status LEDs on the contro ller card. (If the chassis has two controller cards, you may use the LEDs on either c[...]
-
Page 184
Chapter 8: Verifyi ng the Hardware Operations of the Chassis 184 Using Local Management to Verify the Chassis This section explains how to use the command s in the AlliedWare Plus Operating System on the controller card to confirm the operations of the chassis. The section has the follo wing procedure: “S tarting a Local Management Session”[...]
-
Page 185
SwitchBlade x8106 Chassi s Switch Installation Guide 185 2. Connect the other end of the cable to an RS-232 port on a terminal or personal comput er with a terminal emulation program. 3. Configure the VT-100 terminal or terminal emu lation program as follows: Baud rate: 115,200 bps Data bits: 8 Parity: None Stop bits: 1 Flow con[...]
-
Page 186
Chapter 8: Verifyi ng the Hardware Operations of the Chassis 186 Figure 135. SHOW VERSION Command 2. Compare the version number displayed by the SHOW VERSION command with the information in Table 19 on page 62 to confirm that the AlliedWare Plus Operating System on the controller card supports all the hardware components in th e chassis. If necessa[...]
-
Page 187
SwitchBlade x8106 Chassi s Switch Installation Guide 187 6. To check the status of PoE on th e ports of the AT-SBx81GP24 Line Card, use the SHOW POWER-INLINE or SHOW POWER-INL INE INTERFACE command in the User Exec or Privileged Exe c mode. For information about the command line inte rface, refer to the Sof tware Reference for SwitchBlade x810 0 Se[...]
-
Page 188
Chapter 8: Verifyi ng the Hardware Operations of the Chassis 188[...]
-
Page 189
189 Chapter 9 T r oubleshooting This chapter contains information on how to troubleshoot the SwitchBlade x8106 product. Note If you are unable to resolve a hardware problem with the instructions in this chapter, contact Allied Telesis Tech nical Support for further assistance. Refer to “Contacting Allied Telesis” on page 17 for contact informat[...]
-
Page 190
Chapter 9: Tro ubleshooting 190 AT-SBxPWRSYS1 and AT-SBxPWRPOE1 AC Power Supplies A power supply is operating normally w hen its AC and DC LEDs are solid green and the Fault LED is off. Possible fault conditions and their solutions are described here: Fault Condition 1: If the AC LED is off, the power supply is not receiving power, has overheated a[...]
-
Page 191
SwitchBlade x8106 Chassi s Switch Installation Guide 191 AT-SBxPWRSYS1 DC Power Supply If you suspect a problem with the DC power supply, examine its LEDs. The power supply is operating normally when the DC IN and DC OUT LEDs are solid green and the Fault LED is off. Possible fault conditions a nd their solutions are described here: Fault Condition[...]
-
Page 192
Chapter 9: Tro ubleshooting 192 software version on the control card, refer to “Using Local Management to Verify the Chassis” on p age 184 and “AlliedWare Plus Software Releases for the Hardware Compone nts” on page 62. The problem may be with one of th e two power supply interfaces (opto-couplers) on the rear panel of the chassis. For [...]
-
Page 193
SwitchBlade x8106 Chassi s Switch Installation Guide 193 Ethernet Line Cards A quick and easy way to check the overall he ath of the Ethernet line cards in the chassis is with the SBx STATUS LEDs on the controller card. (If the chassis has two controller cards, you may use the LEDs o n either card.) There are twelve LEDs, numbered 1 to 12. For t he[...]
-
Page 194
Chapter 9: Tro ubleshooting 194 You can obtain card status information with the SwitchBla de x8106 Management Software and the SHOW CARD command, as follows: awplus# show card[...]
-
Page 195
SwitchBlade x8106 Chassi s Switch Installation Guide 195 Twisted Pair Ports The ports on the AT-SBx81GT24 and AT-SBx81GP24 Line Cards have L/A LEDs that are solid or flashing gree n when the ports are operating at 1000 Mbps, and solid or fla shing amber at 10 or 100 Mbps. If a port is cabled to a network device but the L /A LED is off, try the foll[...]
-
Page 196
Chapter 9: Tro ubleshooting 196 The default duplex mode setting for th e ports is Auto-Nego tiation. This setting is appropriate for ports connecte d to network devices that also support Auto-N egotiation for duplex modes. The default duplex mode setting of Auto-Negotiation is not appropriate for ports connected to network devices that do n[...]
-
Page 197
SwitchBlade x8106 Chassi s Switch Installation Guide 197 Power Over Ethernet This section applies only to the AT- SBx81GP24 Line Card. Each port has two LEDs. The left LED provides port link and activity status and the right LED provides PoE status information. The PoE LED is solid green when a port is delivering powe r to a powered device (PD). Th[...]
-
Page 198
Chapter 9: Tro ubleshooting 198 Use the SHOW POE CARD command to determine whether the switch has reach its maximum power budget. Try connecting the PD to a port on a different AT-SBx81GP24 Line Card.[...]
-
Page 199
SwitchBlade x8106 Chassi s Switch Installation Guide 199 Fiber Optic Transceivers The L/A LEDs on the AT-SBx81GS24a and AT-SBx81XS6 Line Cards are solid or flashing green when ports on fib er optic transceivers have links to end nodes. If a transceiver is ca bled to an end node but the L/A LED is off, try the following: If all of the L/A LEDs o[...]
-
Page 200
Chapter 9: Tro ubleshooting 200 AT-SBx81CFC400 Controller Fabric Card If the chassis has one controller card and th e card fails, all network operations stop. The Ethernet line cards stop forwarding all network traffic until the controller card is replaced. If the chassis has two controller ca rds and one fails, the Ethernet line cards continue to [...]
-
Page 201
SwitchBlade x8106 Chassi s Switch Installation Guide 201 AT-SBxFAN06 Fan Module The AT-SBxFAN06 Fan Module is operatin g correctly when the POWER LED on the module is solid green. If the LED on t he fan module is off, check the FAN LED in the SYS STATUS section on the active master controller card. The LED should be gre en. If the FAN LED is off or[...]
-
Page 202
Chapter 9: Tro ubleshooting 202 Local (Out-of-Band) Management Session If you are unable to establish a local (out-of-band) management session with the switch through the Console RS-232 port on the active master controller card, do the following : Check to be sure that the RJ-45 serial management cable is securely connected to the Console RS-23[...]
-
Page 203
SwitchBlade x8106 Chassi s Switch Installation Guide 203 Power Supply Interfaces (Opto-couplers) The two power supply interfaces in the lower right corner of the rear pane l are used by the active master controll er card to obtain status information from the power supplies. The interfaces are sh own in Figure 27 on page 60. Each power supply interf[...]
-
Page 204
Chapter 9: Tro ubleshooting 204[...]
-
Page 205
205 Chapter 10 Replacing Modules This chapter contains procedures on how to rep lace modules in the unit. The chapter contains the following section s: “Replacing A T -SBxPWRSYS1 AC and A T -S BxPWRPOE1 Power Supplies” on pag e 206 “Replacing the A T -SBxPWRSYS1 DC Power Supply” on page 21 1 “Replacing Ethernet Line Cards” o[...]
-
Page 206
Chapter 10: Re placing Modules 206 Replacing AT-SBxPWRSYS1 AC and AT-SBxPWRPOE1 Power Supplies This section contains the procedure fo r removing AT-SBxPWRSYS1 AC and AT-SBxPWRPOE1 Power Supplies from the AT-SBx8106 Chassis. Note The illustrations in the following procedure show the removal of an AT-SBxPWRSYS1 AC Power Supply from slot D. The pro ce[...]
-
Page 207
SwitchBlade x8106 Chassi s Switch Installation Guide 207 2. Lift the locking hand on the power supply. Refer to Fig ure 138. Figure 138. Lifting the Locking Handle o n the Power Supply 3. Carefully pull on the locking handle to slide the power supply from the chassis. Refer to Figure 139 on page 208. Warning The power supply is heavy. Use bot h han[...]
-
Page 208
Chapter 10: Re placing Modules 208 Figure 139. Removing the Power Supp ly from the Chassis 4. Do one of the following: To install a new power supply, refer to Chapter 4, “In stalling the Power Supplies” on page 89. If you are not installing a new powe r supply, continue with the rest of this procedure to install a blan k slot cover. 5. [...]
-
Page 209
SwitchBlade x8106 Chassi s Switch Installation Guide 209 Figure 140. Installing a Blank Po wer Supply Slot Cover 6. Lower the locking handle to secure the slot cover in t he slot. Refer to Figure 141 on page 210.[...]
-
Page 210
Chapter 10: Re placing Modules 210 Figure 141. Lowering the Locking Handle on the Power Supply Slot Cover[...]
-
Page 211
SwitchBlade x8106 Chassi s Switch Installation Guide 211 Replacing the AT-SBxPWRSYS1 DC Power Supply To remove an AT-SBxPWRSYS1 DC Power Supply from the chassis, perform the following procedure: 1. Turn off the circuit breaker to the AT-SBxPWRSYS1 DC Power Supply. 2. Turn off the On/Off switch on the front panel of the power supply. Refer to Figure[...]
-
Page 212
Chapter 10: Re placing Modules 212 Note If the power wires are connected to the terminal b lock with the right angle terminals, go to step 5. 4. Use a #1 screwdriver to loosen the two screws that secure the plastic cover over the terminal block and slide the cover to the right. You may need to slightly lift the locking handle to access the bottom s[...]
-
Page 213
SwitchBlade x8106 Chassi s Switch Installation Guide 213 Figure 144. Removing the Nega tive Lead Wire 6. Use a #3 screwdriver to remove the positive (+ ) lead wire from the terminal block. Refer to Figure 145 on page 214.[...]
-
Page 214
Chapter 10: Re placing Modules 214 Figure 145. Removing the Positive Lead Wire from the Te rminal Block 7. Reinstall the two screws on the negative (-) and positive (+) terminals. Refer to Figure 146 on page 215.[...]
-
Page 215
SwitchBlade x8106 Chassi s Switch Installation Guide 215 Figure 146. Reinstalling the Screws on t he Positive and Negative Terminals 8. Slide the plastic cover to the left and lightly tigh ten the two screws to secure it in place. Refer to Figure 147 on p age 216. Caution Do not over tighten th e screws or you may crack or break the p lastic cover.[...]
-
Page 216
Chapter 10: Re placing Modules 216 Figure 147. Closing the Plastic Cover 9. Use an 8 mm wrench to remove th e grounding wire from the grounding post. Refer to Figure 148 on page 217.[...]
-
Page 217
SwitchBlade x8106 Chassi s Switch Installation Guide 217 Figure 148. Removing the Grounding W ire 10. Reinstall the nut and wash er on the grounding post. Refer to Figure 149 on page 218.[...]
-
Page 218
Chapter 10: Re placing Modules 218 Figure 149. Reinstalling the Nut and Washer on the Grounding Post 11. Lift the locking handle and slide the power supply from the chassis. Refer to Figure 150 on page 219. Warning The power supply is h eavy. Use both hands to hold the module as you remove it from the chassis.[...]
-
Page 219
SwitchBlade x8106 Chassi s Switch Installation Guide 219 Figure 150. Lifting the Locking Handle and Removing th e Power Supply 12. Do one of the following: To install a new power supply, refer to Chapter 4, “Installing the Power Supplies” on page 89. If you are not installing a new pow er supply, continue with this procedure to install [...]
-
Page 220
Chapter 10: Re placing Modules 220 Figure 151. Installing a Bla nk Power Supply Slot Cover 14. Lower the locking handle to secure the slot cover to the slot. Refer to Figure 152 on page 221.[...]
-
Page 221
SwitchBlade x8106 Chassi s Switch Installation Guide 221 Figure 152. Lowering the Locking Handl e on the Power Supply Slot Cover[...]
-
Page 222
Chapter 10: Re placing Modules 222 Replacing Ethernet Line Cards This section contains the procedure for replacing Ethernet line cards in the chassis. Note Please review “Guidelines to Ha ndling the Controller and Line Cards” on page 110 before p erforming this procedure. This procedure requires the following tool: #2 Phillips-head screwdri[...]
-
Page 223
SwitchBlade x8106 Chassi s Switch Installation Guide 223 instructions, refer to “Installing the Blank Slot Covers” on page 122. If you do not pla n to immediately install the card in another chassis, continue with this procedure. 8. Store the line card in an anti-static bag. 9. Return the line card to its shipping contain er.[...]
-
Page 224
Chapter 10: Re placing Modules 224 Replacing the AT-SBx81CFC400 Controller Fabric Card This section contains the procedure fo r replacing a controller card in the chassis. Note Please review “Guidelines to Ha ndling the Controller and Line Cards” on page 110 before p erforming this procedure. This procedure requires the following tool: #2 P[...]
-
Page 225
SwitchBlade x8106 Chassi s Switch Installation Guide 225 Note You should not replace a controlle r card in a chassis that has two controller cards while the unit is powered off, e specially if you are replacing a failed controller card in slot 5. If you replace a failed controller card while the chassis is powered off, the Ethernet line cards might[...]
-
Page 226
Chapter 10: Re placing Modules 226 Replacing the AT-SBxFAN06 Fan Module This section contains the procedures for replacing the AT-SBxFAN06 Fan Module. The module is located in the slot on the right side of the front panel. Caution Although the fan module is hot swappable and can be replaced while the chassis is powered on, the line cards and power [...]
-
Page 227
SwitchBlade x8106 Chassi s Switch Installation Guide 227 Figure 153. Loosening the Screw on the AT-SBxF AN06 Fan Module 3. Carefully pull on the handle to discon nect the fan module from the connector on the backplane of the chassis. Refer to Figure 154. Figure 154. Loosening the AT-SBxFAN06 Fan Module from the Backplane Connector[...]
-
Page 228
Chapter 10: Re placing Modules 228 4. Slowly pull the module out 25 mm (1 in.). Refer to Figure 155. Figure 155. Withdrawing the AT-SBxFAN06 Fan Module 25 mm ( 1 in.) from the Chassis 5. Wait ten seconds fo r the fans to stop. Warning The fan module has hazard ous moving parts. Keep fingers away from moving fan blades. 6. After the fans have stop p[...]
-
Page 229
SwitchBlade x8106 Chassi s Switch Installation Guide 229 Figure 156. Removing the AT-SBxFAN06 Fan Module fro m the Chassis Installing a New AT-SBxFAN06 Fan Module This procedure assumes that you have already removed the old fan module from the chassis and are continuing d irectly from the previous procedure, “Removing the AT-SBxFAN06 Fan Module?[...]
-
Page 230
Chapter 10: Re placing Modules 230 Figure 157. Installing a New AT-SBxFAN06 Fan Module 2. When you feel the fan module make contact with the connector on the backplane, gently push on the top and bot tom of the faceplate to seat the module on the connector. Refer to Figure 158 on page 231.[...]
-
Page 231
SwitchBlade x8106 Chassi s Switch Installation Guide 231 Figure 158. Securing the AT-SBxFAN06 Fan Module on the Backpla ne Connector 3. With a #2 Phillips-head screwdriver, tighten the screw at th e base of the module to secure the mo dule to the chassis. Refer to Figure 159. Figure 159. Tightening the Screw on the AT-SBxFAN06 Fan Module 4. Reconne[...]
-
Page 232
Chapter 10: Re placing Modules 232[...]
-
Page 233
233 Appendix A T echnical Specifications Physical Specifications Dimensions (W x D x H) Weight (Kilograms) Table 21. Product Dimensio ns AT-SBx8106 Chassis 48.03 cm x 38.79 cm x 17.63 cm 18.91 in x 15.27 in x 6. 94 in) AT-SBxPWRSYS1 AC System Power Supply 10.16 cm x 32.21 cm x 4.34 cm (4.00 in x 12.68 in x 1.7 1 in) AT-SBxPWRPOE1 PoE Power Supply 1[...]
-
Page 234
Appendix A: Technica l Specifications 234 AT-SBx81GS24a SFP Line Card 1.06 kg (2.34 lb) AT-SBx81XS6 SFP+ Line Card 1.06 kg (2.34 lb) AT-SBx81CFC400 Controller Fabric Card 1.09 kg (2.40 lb) AT-SBxPWRSYS1 AC System Power Supply 2.75 kg (6.05 lb) with power cord AT-SBxPWRPOE1 PoE Power Supply 2.73 kg (6.00 lb) with power cord AT-SBxPWRSYS1 DC System P[...]
-
Page 235
SwitchBlade x8106 Chassi s Switch Installation Guide 235 Environmental Specifications Note The acoustic noise wa s measured at 40° C with the following products installed: Table 23. Environmental Specifications Operating Temperature -0° C to 40° C (32° F to 104° F) Storage Temperature -25° C to 70° C (-1 3° F to 158° F) Operating Humidity [...]
-
Page 236
Appendix A: Technica l Specifications 236 Power Specifications AC Voltage, Frequency Requirements (Volts, Hertz) CC Voltage Requirements Typical power savings in eco-friendly mode (Watts) Maximum power consumption (Watts) Table 25. AC Voltage and Frequency Requirements AT-SBxPWRSYS1 AC Power Supply 100 - 120 / 200 - 240 VAC, 16/8A, 50/60 Hz, (per i[...]
-
Page 237
SwitchBlade x8106 Chassi s Switch Installation Guide 237 Maximum power supply efficiency (based on 100V input voltage) Heat dissipation (Briti sh Thermal Units/hour) Available Power over Et hernet (Watts/port): AT-SBx81CFC400 48.3 W Table 29. Maximum Power Efficiency AT-SBxPWRSYS1 AC Up to 90% AT-SBxPWRPOE1 AC Up to 90% AT-SBxPWRSYS1 DC Up to 90% T[...]
-
Page 238
Appendix A: Technica l Specifications 238 PoE Mode Safety and Electromagnetic Emissions Certifications Safety and Electrom agnetic Emissions: Table 32. Available Powe r Over Ethernet with Two PoE Power Supplies Two PoE Power Supply Installed 2400 W @ 56 VDC IEEE 802.3at Class 4 (30 W /port) 80 ports Maximum IEEE 802.3af Class 3 (15.4 W /port) 96 po[...]
-
Page 239
SwitchBlade x8106 Chassi s Switch Installation Guide 239 Port Pinouts This section lists the port pinouts for the AT-SBx81GT24, AT-SBx81GT40, and AT-SBx81GP24 Line Cards. Figure 160 illustrates the pin layout s for RJ-45 an d RJ point 5 ports. Figure 160. Pin Numbers for RJ-45 and RJ Point 5 Ports (Front View) Table 35 lists the pin signals when a [...]
-
Page 240
Appendix A: Technica l Specifications 240 Table 37 lists the port pin signals when a 10/100/100 0Base-T port is operating at 1000 Mbps. Table 37. 1000Base-T Co nnector Pinouts Pin Pair Signal 1 1 TX and RX+ 2 1 TX and RX- 3 2 TX and RX+ 4 3 TX and RX+ 5 3 TX and RX- 6 2 TX and RX- 7 4 TX and RX+ 8 4 TX and RX-[...]