Amtrol TD-41Z manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Amtrol TD-41Z, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Amtrol TD-41Z one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Amtrol TD-41Z. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Amtrol TD-41Z should contain:
- informations concerning technical data of Amtrol TD-41Z
- name of the manufacturer and a year of construction of the Amtrol TD-41Z item
- rules of operation, control and maintenance of the Amtrol TD-41Z item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Amtrol TD-41Z alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Amtrol TD-41Z, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Amtrol service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Amtrol TD-41Z.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Amtrol TD-41Z item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    BOILER MA TE TM TOP-DOWN INDIRECT -FIRED W A TER HEA TERS WITH TOP-MOUNTED COIL The heat transfer medium should be water . If any product other than water is used, it must be a non-toxic fluid suitable for human ingestion as determined by the FDA Y our AMTROL BOILER MA TE™ has been carefully assembled and factory tested. T o enjoy the full servic[...]

  • Page 2

    -2- 1. GENERAL SAFETY INFORMA TION ...................................................................................... 3 2. PRE-INST ALLA TION CHECKLIST ........................................................................................ 4 Important Steps and Decisions Required Befor e Installation 3. REQUIRED COMPONENTS AND ACCESSORIES CHEC[...]

  • Page 3

    -3- IMPOR T ANT GENERAL SAFETY INFORMA TION - ADDITIONAL SPECIFIC SAFETY ALER TS APPEAR IN THE FOLLOWING INSTRUCTIONS EXPLOSION HAZARD: DO NOT INST ALL TO A HIGH PRESSURE STEAM BOILER (greater than 15 psig). AN EXPLOSION COULD OCCUR. EXPLOSION HAZARD. THE PRESSURE OF THE HEA T TRANSFER MEDIUM MUST BE LIMITED TO A MAXIMUM OF 30 PSIG BY AN APPROVED S[...]

  • Page 4

    -4- j THIS PRODUCT MUST BE INST ALLED AND MAINT AINED BY A LICENSED PROFESSIONAL. IN ADDITION TO THE INSTRUCTIONS IN THIS MANUAL, FOLLOW ALL APPLICABLE LOCAL AND ST A TE CODES OR IN THE ABSENCE OF SUCH CODES, THE CURRENT EDITIONS OF THE NA TIONAL PLUMBING CODE AND THE NA TIONAL ELECTRIC CODE. j DRIP P AN AND DRAIN: T o avoid leaking and/or property[...]

  • Page 5

    -5- TD-7Z, TD-41Z, TD-7ZDW , TD-41ZDW COMPONENTS CHECKLIST The following is a checklist of components requir ed for proper installation of these BOILER MA TE™ models, both Priority and Non-Priority: A. Separate circulator • 1 each - circulator (4-8 gpm) • 1 each - positive shut-of f weighted check valve B. Use of heating system zone cir culat[...]

  • Page 6

    -6- A. General Installation Requir ements 1. Do not "short circuit" the boiler Do not connect boiler supply and return lines to the same section or in the same flow circuit in a boiler , because the boiler water returning from the BOILER MA TE™ will "short circuit" and exit the boiler too cold for pr oper heat transfer . 2. Av[...]

  • Page 7

    -7- B. PIPING PIPING SHOULD BE ACCOMPLISHED WITH UNIONS. Step 1 - Locate the BOILER MA TE™ near boiler . Step 2 - Connect the cold water piping. a. Shut off the cold water supply at the main shut-of f valve. b. Drain existing domestic water system. Open 1 or more system faucets to pr event vacuum. c. When the system is drained, for boilers that h[...]

  • Page 8

    -8- Step 5 - Connect boiler supply pipe. Figure 1. a. Shut off the cold water supply valve to the boiler , and drain it using a hose attached to the drain valve at the boiler . b. When the boiler system piping is drained, cut the piping to accommodate the supply line tee. Install the tee between the boiler supply outlet and any system zone valve or[...]

  • Page 9

    -9- the service switch). c. Switch of f the branch cir cuit breaker . Step 2 - Remove electrical box cover . Step 3 - Remove existing wir e fr om boiler aquastat terminal C1 and connect to terminal #2 on DPDT relay . Step 4 - Install wire fr om DPDT relay terminal #1 to boiler aquastat terminal C1. Step 5 - Connect terminals of 4 and 6 of DPDT rela[...]

  • Page 10

    -10-[...]

  • Page 11

    - 11 - The BOILER MA TE™ is intended to pr ovide a tank service life of many years. Components, however , may be subject to failur es that requir e service. Failure to use the corr ect procedur es or parts in these circumstances may make the unit unsafe. • DO NOT OPEN DOWN-STREAM FIXTURE IF YOU HA VE LOOSENED THE TOP CONNECTIONS. • DO NOT OVE[...]

  • Page 12

    -12- RESIDENTIAL BOILER MA TE™ CLASSIC (TD-7Z and TD-41Z) ELECTROCUTION HAZARD. THE BOILER MA TE™ MUST BE ELECTRICALL Y GROUNDED. NOTES: 1. THE BOILER MA TE™ MUST BE ELECTRI- CALL Y GROUNDED AND INST ALLED IN ACCORDANCE WITH LOCAL CODES, OR IN THE ABSENCE OF LOCAL CODES, WITH THE NA TIONAL ELECTRIC CODE. 2. HEA T EXCHANGER P ACKAGE INCLUDE IT[...]

  • Page 13

    - 13 - PROBLEM CAUSE SOLUTION 1. No hot water at faucet. 1. Boiler does not operate. 1. a. Press reset button on boiler . b. Check main cut-off switch. c. Check fuse. 2. Circulator does not operate. 2. a. Check power supply . b. Check shaft coupling. c. Check impeller for locking. 3. Improper BOILER MA TE™ 3. Set BOILER MA TE™ temperature to se[...]

  • Page 14

    -14- DA TE SERVICE PERFORMED COMMENTS CONTRACTOR 9. SERVICE RECORD[...]

  • Page 15

    AMTROL ® BOILERMA TE ™ CLASSIC AND TOP-DOWN™ LIMITED PRODUCT WARRANTY This W arranty cannot be transferred - it is extended only to the original Purchaser or First User of the Product. By accepting and keeping this Product you agree to all of the warranty terms and limitations of liability described below . I MPOR T ANT W ARNING: READ CAREFULL[...]

  • Page 16

    West W arwick, Rhode Island 02893 Part #: 9040-628 REV B (7/04) -16-[...]