Go to page of
Similar user manuals
-
Boiler
Baxi Potterton HE Plus A
12 pages 1.17 mb -
Boiler
Baxi Potterton 24/1.0
24 pages 5.74 mb -
Boiler
Baxi Potterton G.C.No 47 393 22
60 pages 9.22 mb -
Boiler
Baxi Potterton Promax Combi 24 HE Plus A
12 pages 1.37 mb -
Boiler
Baxi Potterton 105E
12 pages 0.62 mb -
Boiler
Baxi Potterton Cold HE A
12 pages 1.47 mb -
Boiler
Baxi Potterton Performa 24 Eco HE
56 pages 5.64 mb -
Boiler
Baxi Potterton 80 HE
12 pages 1.09 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Baxi Potterton WH46, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Baxi Potterton WH46 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Baxi Potterton WH46. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Baxi Potterton WH46 should contain:
- informations concerning technical data of Baxi Potterton WH46
- name of the manufacturer and a year of construction of the Baxi Potterton WH46 item
- rules of operation, control and maintenance of the Baxi Potterton WH46 item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Baxi Potterton WH46 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Baxi Potterton WH46, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Baxi Potterton service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Baxi Potterton WH46.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Baxi Potterton WH46 item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
W ALL-MOUNTED CONDENSING BOILERS WH 46 WH 65 0085 GB IE INST ALLA TION, OPERA TION AND MAINTENANCE MANUAL[...]
-
Page 2
2 926.772.1 - GB/IE INSTRUCTIONS PERT AINING TO THE USER Dear Customer , W e are sur e your new boiler will comply with all your requir ements. Do not dispose of this booklet as it contains the information, which will help you to run your boiler correctly and ef ciently . POTTERTON GOLD HIGH OUTPUT boilers bear the CE mark in compliance with the[...]
-
Page 3
3 926.772.1 - GB/IE INSTRUCTIONS PERT AINING TO THE USER This boiler is designed to heat water at a lower than boiling temperatur e at atmospheric pressur e. The boiler must be connected to a central heating system and/or to a domestic hot water supply system in compliance with its performances and output power . The boiler must be installed by a Q[...]
-
Page 4
4 926.772.1 - GB/IE INSTRUCTIONS PERT AINING TO THE USER 020503_1100 Figure 1 KEYS DISPLA Y SYMBOLS Central heating mode setting key Data display reset key Parameter setting key (increase value) Parameter setting key (decrease value) Program access and scr oll key Program access and scr oll keys Reset key Hot water temperature setting key Central h[...]
-
Page 5
5 926.772.1 - GB/IE INSTRUCTIONS PERT AINING TO THE USER a) Automatic operation. Operation of the boiler is contr olled by the timed program as described in point 3-5.1 “Daily timed program for operation of the central heating system”; b) Manual operation at the maximum temperature set. The boiler comes into operation r egardless of the timed p[...]
-
Page 6
6 926.772.1 - GB/IE INSTRUCTIONS PERT AINING TO THE USER a) Pr ess either of the keys to access the programming function; the display will show the letter P followed by a number (program line); 020503_0700 Figure 3 3.2 SETTING THE TIME - Press the key (2-gur e 1) to set the central heating water temperature; - Press the keys to set the temperatu[...]
-
Page 7
7 926.772.1 - GB/IE INSTRUCTIONS PERT AINING TO THE USER - Press either of the keys to access the pr ogramming function; a) Press these keys until the display shows P11, referring to the pr ogram start time; b) Press the keys to set the time; - Press the key; the display will show P12, r eferring to the program end time; - Repeat the operations des[...]
-
Page 8
8 926.772.1 - GB/IE INSTRUCTIONS PERT AINING TO THE USER Parameter N. Parameter description Factory setting Range P1 Time of day setting ———- 0…23:59 P5 Minimum central heating temperature setting (°C) 25 25..80 P11 Start of rst daily period of automatic central heating 6:00 00:00…24:00 P12 End of rst daily period of automatic cent[...]
-
Page 9
9 926.772.1 - GB/IE INSTRUCTIONS PERT AINING TO THE USER All the faults are displayed in or der of importance; if several faults occur simultaneously , the rst to be displa- yed is the one with highest priority . After the cause of the rst fault has been removed, the second one will be displayed, and so on. If any given fault occurs frequentl[...]
-
Page 10
10 926.772.1 - GB/IE INSTRUCTIONS PERT AINING TO THE USER T o shut down the boiler switch off the electrical supply to the appliance. Important: Regularly check that the pressur e displayed by the pressur e gauge is between 1 to 4 bar , with the boiler not operating. In case the pressur e is lower open the boiler lling tap. W e recommend you ope[...]
-
Page 11
11 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE This boiler is designed to heat water at a lower than boiling temperatur e at atmospheric pressur e. The boiler must be connected to a central heating system and, on models with this option, to a domestic hot water supply system in compliance with its performances and output criteria. [...]
-
Page 12
12 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE T o avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non alkaline. The recommended pr oducts for cleaning are: SENTINEL X300 or X400 and FERNOX heating circuit restor e. Please ensure to use this pr oduct proceeding strictly in accor dance wi[...]
-
Page 13
13 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE 11. BOILER SIZE Figure 6 0310_0103 12. INST ALLA TION OF FLUE AND AIR DUCTS 0709_1001 C 33 Figure 7 C 13 W e guarantee ease and exibility of instal lation for the boiler thanks to the ttings and xtures supplied (de- scribed below). The boiler is especially designed for connect[...]
-
Page 14
14 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE Concentric flue This type of duct allows to emit exhaust gases and to draw combustion air from outside the building. The 87° coaxial bend allows to connect the boiler to a ue-air duct in any direction as it can r otate through 360°. If the ue outlet is placed outside, the u[...]
-
Page 15
15 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE 12.2 VERTICAL FLUE TERMINAL Ø 80/125 mm INST ALLA TION OPTIONS This type of installation can be carried out both on a at or pitched r oof by tting a terminal, an appropriate weathering tile and sleeve, (supplementary ttings supplied as options). L max = 10 m L max = 10 m L ma[...]
-
Page 16
16 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE 13. HYDRAULIC DIAGRAM Applications and Installation Details (Pumped heating circuits with r emote control QAA73 or Room Thermostat, including hot-water tank, without and with primary loop) 13.1 HYDRAULIC SYSTEM 1 Figure 9a 0602_0704/CG1782 (*) (*) (*) without low loss header (*) option[...]
-
Page 17
17 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE • TS: T ank Sensor (QAZ36)* • B3: Room Control Module (QAA73)* • B1: Room Thermostat • B9: Outdoor T emperature Sensor (QAC34)* • P1: Heating Pump • PDHW: Hot W ater pump • PLP: Primary Pump (only for gure 9b) (*) Available Optional Extra • Pu[...]
-
Page 18
18 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE (Pumped heating circuits with Room Thermostat and compensated cir cuit with remote contr ol QAA73, inclu- ding hot-water tank, with primary loop) 13.2 HYDRAULIC SYSTEM 2 • TS:T ank Sensor (QAZ36)* • B3: Room Control Module (QAA73)* • B1: Room Thermostat • B9: T empe[...]
-
Page 19
19 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE APPLICA TION TERMINAL BOARD PRIMAR Y PUMP PLP M1: A – B DHW PUMP PDHW M3: 13 – 14 HEA TING PUMP P1 M3: 11 – 12 DHW SENSOR TS M2: 7 – 8 REMOTE CONTROL QAA73 (LOW TEMPERA TURE) M2: 1 – 2 ROOM THERMOST A T M2: 3 – 4 HEA TING PUMP P2 CLIP IN AGU 2.500 3 WA Y V AL VE CLIP IN AGU[...]
-
Page 20
20 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE Figure 1 1 020523_0400 T erminal board M1 T erminal board M2 Cover Cover 14. CONNECTING THE MAINS SUPPL Y Electrical safety of the appliance is only guaranteed by correct earthing, in compliance with the applicable standards and r egulations. Connect the boiler to a 230V earthed power [...]
-
Page 21
21 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE T ur n the control box downwar d to access terminal boards M1 and M3 used for the electrical connections by removing the pr otective covers (see gure 12). T erminals M1 a – b: connection of the primary loop pump for the heating system (PLP) Check the correct size and rating of the[...]
-
Page 22
22 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE Remove the resistor fr om terminals 9-10 of terminal strip M2 (gure 13), and connect the hot water priority NTC sensor , which is supplied as an accessory . The sensing element of the NTC device must be located in the recess pr ovided on the storage tank (gure 13). The temperatur[...]
-
Page 23
23 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE T ur n the control box downwar d to access terminal board M2 used for the electrical connections by r emoving the protective cover (see gur e 13). T erminals 1-2: connection of SIEMENS model QAA73 room temperature r egulator supplied as optional extra. Connection polarity is irrelev[...]
-
Page 24
24 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE The SIEMENS model QAA73 room temperatur e regulator , if required (optional extra) must be connected to terminals 1-2 of terminal board M2 in gur e 13. The link across terminals 3-4, pr ovided for connection of a room temperatur e thermostat, must be removed. The settings of the dom[...]
-
Page 25
25 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE The SIEMENS model QAC34 outdoor temperature sensor (optional extra) for weather compensation must be connected to terminals 7-8 of terminal board M2 in gur e 13. The procedur es for setting the gradient of the temperature curve “kt” vary depending on the accessories connected to[...]
-
Page 26
26 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE c) With AGU2.500 for control of a low temperatur e system: Refer to the instructions provided with the AGU2.500 accessories for connection and contr ol of a low tem- perature zone. Graph 4 TM = Flow temperature T e = Composite outside temperature 010905_0100 b) With QAA73 room temperat[...]
-
Page 27
27 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE T o simplify calibration of the gas valve, the “calibration function” can be set directly on the boiler contr ol panel by proceeding as follows: 1) Pr ess the keys (2-3) together until the display shows the pointer “ ” alongside the and symbols (about 6 seconds) (see g. 16).[...]
-
Page 28
28 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE T able 2 T able 2.1 Model Counter clockwise turns of screw (V) WH 46 3 WH 65 4 3 / 4 T able 3 T able 1 Gas consumption at 15 °C 1013 mbar gas G31 - 3P - 37 mbar WH 46 WH 65 PCI (MJ/Kg) NET 46.34 46.34 Consumption at max. heat output (Kg/h) 3.60 5.20 Consumption at min. heat output (Kg[...]
-
Page 29
29 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE T able 4 16. SETTING THE BOILER P ARAMETERS If the electronic cir cuit board is r eplaced, make sure that the parameters set ar e those specic to the boiler model, as indicated in the documentation available from the authorised Service Centr e. (*) For these parameters see section 1[...]
-
Page 30
30 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE 17. CONTROL AND OPERA TION DEVICES The boiler has been designed in full compliance with European r eference standar ds and in particular is equip- ped with the following • Overheat thermostat This thermostat interrupts the gas ow to the main bur ner in case the water contained in [...]
-
Page 31
31 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE Figure 18 020429_0300 gasket combustion air ue gas 18. POSITIONING OF THE IGNITION AND FLAME SENSING ELECTRODE T o measure the performance of combustion products, the for ced draught boiler models are equipped with two test points on the tapered coupling specically designed for t[...]
-
Page 32
32 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE T o facilitate measurement of the combustion ef ciency and improve the cleanliness of the pr oduction products, the chimney sweep function can be activated by proceeding as described below: 1) Press the (2-3) together until the pointer “ ” appears on the display alongside the sy[...]
-
Page 33
33 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE Legend: 1 Boiler drain point 2 Manometer (water pressur e gauge) 3 Siphon (condensate) 4 NTC delivery heating probe 5 105°C overheat thermostat 6 Gas valve 7 Heat exchanger 8 Flame detector electrode (ionisation pr obe) 9 Main burner 10 Ignition electrode 11 Air/gas mixture header 12 [...]
-
Page 34
34 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE 23. ILLUSTRA TED WIRING DIAGRAM[...]
-
Page 35
35 INSTRUCTIONS PERT AINING TO THE INST ALLER 926.772.1 - GB/IE 24. TECHNICAL DA T A Boiler model WH WH 46 WH 65 Category II 2H3P II 2H3P Nominal heat input (net/gross) kW 46,4 - 51,5 67,0 - 74,4 Reduced heat input (net/gross) kW 15 - 16,6 20,0 - 22,2 Rated heat output 75/60°C kW 45,0 65,0 kcal/h 38.700 55.900 Rated heat output 50/30°C kW 48,7 70[...]
-
Page 36
code 926.772.1 Ed. 2 - 07/1 1 POTTERTON GOLD HIGH OUTPUT , in its commitment to constantly improve its products, r eserves the right to alter the specications contained herein at any time and without pr evious warning. These Instructions are only meant to provide consumers with use information and under no circumstance should they be construed a[...]