Go to page of
Similar user manuals
-
Home Security System
Bosch Appliances VDx-240
3 pages 0.44 mb -
Home Security System
Bosch Appliances PLE-10M2-EU
34 pages 2.78 mb -
Home Security System
Bosch Appliances D9412G
142 pages 5.64 mb -
Home Security System
Bosch Appliances LTC 8715
16 pages 0.54 mb -
Home Security System
Bosch Appliances API-AEC21-8I8OZ
2 pages 0.21 mb -
Home Security System
Bosch Appliances ICP-CC488
118 pages 2.25 mb -
Home Security System
Bosch Appliances DVR4C
14 pages 2.18 mb -
Home Security System
Bosch Appliances LTC 0620
29 pages 0.72 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Bosch Appliances D9412GV3, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Bosch Appliances D9412GV3 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Bosch Appliances D9412GV3. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Bosch Appliances D9412GV3 should contain:
- informations concerning technical data of Bosch Appliances D9412GV3
- name of the manufacturer and a year of construction of the Bosch Appliances D9412GV3 item
- rules of operation, control and maintenance of the Bosch Appliances D9412GV3 item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Bosch Appliances D9412GV3 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Bosch Appliances D9412GV3, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Bosch Appliances service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Bosch Appliances D9412GV3.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Bosch Appliances D9412GV3 item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
EN Operation and Installation Guide Control Panels D9412GV3/D7412GV3[...]
-
Page 2
D9412GV3/D7412GV3 | Operation and Installation Guide | Trademarks . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 2 Trademarks CoBox is a registered trademark of Lantronix. Windows is a registered trademark of Microsoft Corporation in the United States or in other countries. Molex is a registered trademark of Molex Incorporated. Certificati[...]
-
Page 3
D9412GV3/D7412GV3 | Operation and Installation Guide | Federa l C ommunications Commission (FCC) Rules . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 3 The teleph one com pany might m ake chang es in its facilities, equipment, operat ions, or procedures that could affect the operation of the equipment. If this happens, the telephone compa [...]
-
Page 4
D9412GV3/D7412GV3 | Operation and Installation Guide | Contents . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 4 Contents 1.0 Introduction ...................................................... 7 2.0 Lightning Strikes ............................................. 8 2.1 Effects ...............................................................[...]
-
Page 5
D9412GV3/D7412GV3 | Operation and Installation Guide | Contents . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 5 8.5 Wiring Information for In stallations Using th e Rothenbuhler 5110/4001-42 High Security Bell ..................................................................... 33 9.0 Off-Board Points ....................................[...]
-
Page 6
D9412GV3/D7412GV3 | Operation and Installation Guide | Tables . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 6 Figures Figure 1: System Configuration ................................ 9 Figure 2: Enclosure Mountin g ................................. 15 Figure 3: Enabling Ground Fault Detection ........... 16 Figure 4: Reset Pin ............[...]
-
Page 7
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 1.0 Introduction . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 7 1.0 Introduction This manual addresse s the operation and installati on of the D9412GV3 and D7412GV3 Control Panels. Throughout this guide, the words “control panel” refer to both control panels (D9412GV3 and D74[...]
-
Page 8
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 2.0 Lightning Strikes . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 8 2.0 Lightning Strikes The control panels are designed to significa n tly reduce electromagnetic i nterference and malfunction generally caused by lightning. 2.1 Effects Any electr onic syst em can be stru ck dir[...]
-
Page 9
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 3.0 Overview . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 9 3.0 Overview 3.1 Configuration and Parts Figure 1: System Configuration Control Panel On-Board Points 1 to 8 D9131A Module connects to a parallel printer to print the event log. D928 Module allows the control panel to mo[...]
-
Page 10
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 3.0 Overview . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 10 3.1.1 Parts List The D9412GV3 andD7412 GV3 Control Panels are shipped assembled from the fac tory with the following parts: Literature Pack D9412GV3/D7412GV3 Program Re cord Sheet (P/N: F 01U170809 ) 7000/9000 S[...]
-
Page 11
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 3.0 Overview . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 11 3.2 Accessories Refer to the Bosch Security Systems, Inc. product catalog for additional information. Table 3: Compatible Accessories 1 Model Title UL 864 Fire Intrusion D122/D122L Dual Batter y Harness X X X D125B Powe[...]
-
Page 12
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 3.0 Overview . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 12 3.3 Features in the D9412GV3 and D7412GV3 3.3.1 SDI Molex Connector Use the SDI Molex Connector to easily conne ct an SDI device to the SDI bus without needing to disconnect wires co nnected to the SDI terminals . Possi[...]
-
Page 13
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 3.0 Overview . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 13 3.3.7 Keypads Up to 32 unsupervised keypads ca n be connected to the system. The available power, numb er of supervised keypads, a nd number of areas covered affect the total number of keypads that can be connected. The[...]
-
Page 14
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 4.0 Installation . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 14 3.3.13 Ground Fault Detection Added Feature When Ground Fault Detect is enabled (S4 closed), Points 1 to 8 can be used for non-powered fire- initiating devices such as heat detectors, four-wire smoke detectors, and [...]
-
Page 15
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 4.0 Installation . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 15 Figure 2: Enclosure Mounting 8 2 1 3 2 4 3 7 5 9 6 1 - Point chart label 2 - Mounting skirt hooks (2) 3 - Module mounting holes (12 ) 4 - Tamper switch mounting holes (5) 5 - Skirt mounting hole (1) 6- Enclosure mou[...]
-
Page 16
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 4.0 Installation . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 16 If a ground fault condition occurs, the keypads disp lay SERVC GND FAULT and the control panel transmits a GROUND FAULT TROUBLE, AREA 1. When the control panel recognizes that the ground fault condit ion is correcte[...]
-
Page 17
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 4.0 Installation . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 17 4.6 Completing the Installation If not already complete, make th e earth ground connection to Term inal 10 and lock th e reset pin in the cl osed pos ition. 4.6.1 Charging the Battery Connect the battery, then the t[...]
-
Page 18
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 4.0 Installation . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 18 4.8 Installing the Point Chart Label The point chart label is required for fire systems wit h verifi cations poi nts. A point chart label is included in the literature pack. Install the point chart label for fi re o[...]
-
Page 19
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 4.0 Installation . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 19 5. To see the points that remain untested during the Service Walk Test: a. Press [ESC] when point text appears. The display shows ## PTS TO TEST. b. Press the [ESC] key. VIEW UNTESTED ? appears. c. Press [ENT]. ## P[...]
-
Page 20
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 4.0 Installation . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 20 Figure 5: D9412GV3 Service Walk Test Flow Chart [ENT ] [ENT ] [ESC] [ES C] [ESC] [ES C] [NEX T] T est a device T est a device T est a device T est a device (T ext displays for 60 seconds) (T ext displays for 60 seco[...]
-
Page 21
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 4.0 Installation . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 21 Figure 6: D7412GV3 Service Walk Test Flow Chart [ENT ] [ENT ] [ESC] [ES C] [ESC] [ES C] [NEX T] T est a device T est a device T est a device T est a device (T ext displays for 60 seconds) (T ext displays for 60 seco[...]
-
Page 22
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | 5.0 Power Suppl y . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 22 5.0 Power Supply 5.1 Primary Pow er Termi nals 1 and 2 5.1.1 Primary (AC) Power Circuit The primary sourc e is a 16.5 VAC , 40 VA, internally- fused transformer (Bosch Security Systems , Inc. Model D164 0). The c o[...]
-
Page 23
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | 5.0 Power Suppl y . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 23 3. Connect the black battery lead to Terminal 4, and then to the negative (-) sid e of the battery. 4. Connect the red battery lead to Terminal 5 , and then to the positive (+) s ide of the battery. Warning: High c[...]
-
Page 24
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | 5.0 Power Suppl y . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 24 5.2.3 Replacing the Battery Replace batteries every 3 to 5 years under normal use. Record the date of installation directly on the battery. Caution: Exceeding the maximum output ratings or installing the transforme[...]
-
Page 25
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | 5.0 Power Suppl y . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 25 Reset the control panel by mome ntarily placing the reset pin in the dis able position. Refer to Figure 4 on page 16. The red Low Battery LED co ntinues flashing until the control pane l resets. 5.2.6 Battery Disch[...]
-
Page 26
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 6.0 Power Outputs . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 26 6.0 Power Outputs 6.1 Circuit Pro tection Three self-resetting circuit breakers protect the control panel from short circ uits on th e con tinuous an d programmable power outputs. If the control panel is programmed[...]
-
Page 27
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 6.0 Power Outputs . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 27 6.4 Programmable Power Output Terminals 6, 7, and 8 6.4.1 Programming The power outputs at Terminals 6, 7, and 8 are programmed as Relays A, B, and C. All relays are programmed in the Relays se ction. Relays are as[...]
-
Page 28
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 7.0 Telephone Connections . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 28 7.0 T elephone Connections 7.1 Registration The Bosch Security Systems, Inc. D9412GV3 and D7412GV3 Control Panels ar e registered with the Federal Communication Commission (FCC) under Part 68, for connectio[...]
-
Page 29
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 7.0 Telephone Connections . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 29 7.5 Phone LED (Red) The red Phone LED illuminates when the control panel seiz es the tele phone line an d remains illuminated until the control panel returns the telephone line. Refer to Figure 11 on page 2[...]
-
Page 30
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 7.0 Telephone Connections . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 30 7.11 D928 Dual Phon e Line Switcher 7.11.1 Description The optional D928 Dual Phone Line Switcher allows the control panel to send reports over two separate telephone lines. If a telephon e line is n ot wit[...]
-
Page 31
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | 8.0 On -Board Poi nts . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 31 7.11.3 Installing the D928 Mounting Mount the D928 on the lower right side of the enclosure using the screws provid ed with the switcher. Wiring The D928 has two flying leads. T he green lead monitors AC power.[...]
-
Page 32
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | 8.0 On -Board Poi nts . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 32 8.3 Point Pa rameters The condition of on-board Points 1 to 8 is determi ned by measuring the voltage across the point input terminal and one of the common terminals. T h e sensor loops must b e connected and t[...]
-
Page 33
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | 8.0 On -Board Poi nts . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 33 8.4 Poin t Respo nse Time The control panel scans on-board and off-board point sensor loops every 30 0 ms . The Debou nce program item in the Point Assignment section of the software determines poin t response [...]
-
Page 34
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | 8.0 On -Board Poi nts . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 34 Figure 14: Rothenbuhler 5110/4001-42 High Security Bell Wi ring Configuration 0.64 mm (1/4 i n.) minimum distance + - + - 17 3 14 16 15 4 7 5 8 12 13 1 1 11 11 9 2 6 10 10 1 - Self-contained vibration sensor 2 [...]
-
Page 35
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | 8.0 On -Board Poi nts . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 35 Figure 15: Wirin g the Rothenbuhler 5110/4001-42 High Security Bell to the D9412GV3 or D7412GV3 Control Pan el 1 2 3 4 RE D O RG WHT B L K N/O 1 COMM 1 N/C 1 X1 - X1+ 7 9 123 6 1 2 3 4 5 6 7 10 11 13 8 9 12 6 3[...]
-
Page 36
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 36 9.0 Off-Board Points 9.1 Point (Zonex) Bus: D9412GV3 Terminals and D7412GV3 Termi nals 9.1.1 POPIT Modules The D9412GV3 can use poi nt of protection input transpon der (POPIT) mo dules to provi de a max imum of [...]
-
Page 37
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 37 Table 12: Off-Board Point Errors Error Condition Result Additional Information +/- leg of the data expans ion bus has a short circui t to earth ground, with Ground Fault Detect enabl ed Ground Fault even t +/- l[...]
-
Page 38
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 38 Figure 16: Connecting the D8125 POPEX to the D9412GV3 Control Panel 1 - D8125 POPEX Module 2 - Switch block 3 - D9127 Sensor Loop 4 - 33 k Ω EOL resistor (P/N: P106F [15-031 30-002], package of eight) 5 - Zone[...]
-
Page 39
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 39 Figure 17: Connecting the D8125 POPEX to the D7412GV3 Control Panel (- ) (- ) (+ ) (+ ) AU X IN OU T GN D (+ ) (- ) D 9127 U/ T D912 7U/ T D 9127 U/ T 1 2 2 2 3 3 3 4 4 4 5 6 7 21 22 Re s et Pin D is able all ex[...]
-
Page 40
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 40 9.3 Installing the D8125 POPEX Module For information on the Multiplex Bus Interface, refer to the D8125MUX Multiplex Bus Interface Operation an d Installation Guide (P/N: F01U034973 ). Save the POPIT Label Shee[...]
-
Page 41
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 41 9.3.4 Wiring Data Expansion Loops to PO PEX Modules Each POPEX Module has tw o po sitive (+) and two negative (-) data expansion loop termi nals. Up to 119 POPITs can be connected to one D8125 on the D9412GV3; u[...]
-
Page 42
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 42 Figure 18: Program Record Sheet 9.3.8 POPIT Labels D9412GV3 off-board points are numbered 9 to 127 and 129 to 247. The D7412G V3 uses Points 9 to 75 only. The D9412GV3 reserves Points 128 and 248 for internal us[...]
-
Page 43
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 43 9.4.2 Listings The D8128D OctoPOPIT Module is UL Listed for Local or Police Connected Burglary Alarm, Ce n tral Station Burglary Alarm, Household Burglary Alarm applications, and commercial fire applications (UL[...]
-
Page 44
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 44 9.4.3 Installation For the most effective installation, use the following four-ste p proces s: 1. Set the OctoPOPIT switches. Refer to Section 9.4.4 Setting the OctoPOPIT Switches. 2. Physically mount the OctoPO[...]
-
Page 45
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 45 Use the point DIP switches to disable conflicting points, such as when a D9210B Access Control Module must be assigned to a point that falls within the range of the D8128D OctoPOPIT. In this example, a D9210B is[...]
-
Page 46
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 46 Figure 20: Connecting D8128D OctoPOPITs to the D9412GV3 1 - Zonex Bus 1, Switch 1 ON (Po ints 9 to 72) 2 - Bus 1 3 - First address on Zonex Bu s 1 4 - Last address on Zonex Bus 1 5 - Zonex Bus 1, Switch 1 OFF (P[...]
-
Page 47
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 47 Figure 21: Connecting D8128D OctoPOPITs to the D7412GV3 1 - Zonex 1 address 2 - Sensor loops Refer to Address Sw itches in Section 9.4.4 Setting the OctoPOPIT S witches on page 44 for information about makin g t[...]
-
Page 48
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 48 Using Molex ® Connectors Each D8128D Module is supplied with a 30 cm (1 2 in.) female-to-female Molex cable assemb ly. P1 and P2 are Molex connectors that parallel the COM, IN, OUT, and +12.0 VDC term inals on [...]
-
Page 49
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 49 9.4.7 OctoPOPIT Sensor Loops Only the resistance on the loop limits t he number of normally-o pen or no rmally -closed dete ction de vices each sensor loop can supervise. Resi stance on each sensor loop must be [...]
-
Page 50
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 10.0 Off-Board Relays . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 50 10.0 Off-Board Relays 10.1 D8129 OctoRelay Use the D8129 OctoRelay to add relay outputs to the system in groups of eight. On the D9412GV3, up to 128 OctoRelay outputs (relay n umbers 1 to 128) ca n be added to [...]
-
Page 51
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 10.0 Off-Board Relays . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 51 Figure 25: D8129 Connections to the D7 412GV3 1 - D8129 OctoRelays for relay numbers 1 to 64. Connect Oc toRelays in parallel. 2 - Power limited 10.1.1 Configuring the D8129 OctoRelay Five switches on the OctoR[...]
-
Page 52
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 10.0 Off-Board Relays . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 52 1. Align the module with one of the mo unting locations in the enclosure (refer to Figure 2 on page 9). 2. Using the screws provided with the mod ule, secure the module in th e enclos ure. Use the D137 Mounting[...]
-
Page 53
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 10.0 Off-Board Relays . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 53 Use the D137 Mounting Bracket or D9002 Mounting Skirt to install D811 Modules in enclosures with no available module mounting locations. 10.2.3 Wiring Connections Power down the control panel to connect D811 Mo[...]
-
Page 54
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 10.0 Off-Board Relays . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 54 Figure 27: D811 Module Wiring to the D7412GV3 1 - D811 for Relay 53[...]
-
Page 55
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 11.0 Armi ng Devices . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 55 1 1.0 Arming Devices 11.1 Description Keypads, mai ntained or momentary co n tact keyswitches, or a combinatio n of the two are used to arm an d disarm a reas. The D9 412GV 3 can su pport up to 32 areas. The D74[...]
-
Page 56
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 11.0 Armi ng Devices . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 56 11.2.2 Installation Refer to the keypad installation manual s for installation a nd mounti ng instruct ions. Keyp ads connect to the control panel in parallel ( Table 20 ). Table 20: Keypad Connection s D9412GV3[...]
-
Page 57
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 11.0 Armi ng Devices . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 57 Figure 28: Power at Keypads 1 2 2 3 3 4 4 5 1 - To control panel 2 - +12.0 VDC 3 - Data 4 - Common 5 - D8132 or external power suppl y 11.3 D279A I ndepende nt Zone Control Any on-board or OctoPOPIT point can be[...]
-
Page 58
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 11.0 Armi ng Devices . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 58 Momentary Contact If the point to which the keyswitch is connected is programmed for a mome ntary contact, shorting the arming circuit toggles the area’s arming state betwee n armed and disarmed . All faulted [...]
-
Page 59
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 12.0 SDI Devices . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 59 12.0 SDI Devices 12.1 Description D9412GV3 and D7412GV3 Control Panels can support a number of accessory devices from the SDI Bus using Terminals 29 t h rough 32. Some devices include the D1255 and D1255 B Keypads ([...]
-
Page 60
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 12.0 SDI Devices . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 60 12.4 D9210B Wiegand Cont rol In terface Module The Bosch Security Systems, Inc. D9210B Wiegan d Control Interface Module is a four-wire powered device providing conne ctions for an access door point and door strike.[...]
-
Page 61
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 12.0 SDI Devices . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 61 12.5.2 Network Interface Modules The Bosch Security Systems, Inc. DX4020 Network Interface Module is a four-wire powered SDI device that provides connection for two-way co mmunication over Ethernet networks to D9412[...]
-
Page 62
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 13. 0 Programmer and Accessory Co nnections . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 62 13.0 Programmer and Accessory Connections 13.1 Programmer C onnector Control panel firmware version 8.11 and later does not support the D5200 Programmer. Instead, a limited local keypad pr[...]
-
Page 63
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 13. 0 Programmer and Accessory Co nnections . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 63 13.4 Accessory Connector Use the accessory connector to connect the control panel to the D928 Dual Phone Line Switcher. The accessory co nnector is on the bottom right corner of the I/O bo[...]
-
Page 64
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 14.0 Facepl ates . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 64 14.0 Faceplates 14.1 D9412GV3 Faceplate Figure 33: D9412GV3 Faceplate 1 - Charging status LED (yellow) 2 - Low battery LED (red) 3 - Color-coded battery lead s 4 - Ground fault detect enable 5- Phone LED (red) 6 - T[...]
-
Page 65
D94 12GV3 /D74 12GV3 | Op eration and Installation Guide | 14.0 Facepl ates . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 65 14.2 D7412GV3 Faceplate Figure 34: D7 412GV3 Faceplate 1 - Charging status LED (yellow) 2 - Low battery LED (red) 3 - Color-coded battery lead s 4 - Ground fault detect enable 5- Phone LED (red) 6 - Tip 7 - Telephon[...]
-
Page 66
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | Appen d ix A: System Wiring Diagrams, Issue A . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 66 Appendix A: System Wiring Diagrams, Issue A A.1 D9412GV3 Control Panel Figure 35: D9412GV3, Power Supply Side System Wiring 1 - If required by local AHJ, conne ct D113 Battery Lead Super[...]
-
Page 67
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | Appen d ix A: System Wiring Diagrams, Issue A . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 67 Figure 36: D9412GV3, Input Points and Peripheral Devices System Wiring Sw . Aux Pwr Zone B Zone A Pnl Common Pnl Common Loop B- Loop A- Loop B+ Loop A+ Earth Ground 10 9 5 4 3 8 2 1 7 6 [...]
-
Page 68
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | Appen d ix A: System Wiring Diagrams, Issue A . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 68 Figure 37: D9412GV3, SDI Devices System Wiring System Wiring 1 - Up to 16 supervised D1255 (all version s ), D1255RB, D1256, D1256 RB Keypads, or D1257RB or D12 57 Fire Annunciators, or [...]
-
Page 69
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | Appen d ix A: System Wiring Diagrams, Issue A . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 69 A.2 D7412GV3 Control Panel Figure 38: D7 412GV3, Power Supply Side Syste m Wiring 1 If require d by local AHJ, connect D11 3 Battery Lead Supervision Module. 2 Batteries 3 - D122 Dual Ba[...]
-
Page 70
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | Appen d ix A: System Wiring Diagrams, Issue A . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 70 Figure 39: D7 412GV3, Input Points and Peripheral Device s System Wiring Sw . Aux Pwr Zone B Zone A Pnl Common Pnl Common Loop B- Loop A- Loop B+ Loop A+ Earth Ground 10 9 5 4 3 8 2 1 7 [...]
-
Page 71
D94 12GV3 /D74 12GV3 | Operation and Ins tallation Guide | Appen d ix A: System Wiring Diagrams, Issue A . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 71 Figure 40: D7 412GV3, SDI Devices System Wiring 1 - Up to 16 supervised D125 5 (all versions), D1255RB, D1256, D1256RB Keypad s, or D1257RB or D1257 Fire A nnunciato rs, or up to 8 super[...]
-
Page 72
D94 12GV3 /D74 12GV3 | Operation and Inst allation Guide | Appendix B: Point A ddress Ch arts . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 72 Appendix B: Point Address Charts B.1 Zonex 1, Points 9 to 127 (D9412GV3); Zonex 1, Points 9 to 75 (D7412GV3) Place the labels on the base of the POPIT. Do not attach labels to the POPIT cover. A bu[...]
-
Page 73
D94 12GV3 /D74 12GV3 | Operation and Inst allation Guide | Appendix B: Point A ddress Ch arts . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 73 B.2 Zonex 2, Points 129 to 247 (D9412GV3 Only) Place the labels on the base of the POPIT. Do not attach labels to the POPIT cover. A number in the switch column indicates that th e switch is set to[...]
-
Page 74
D94 12GV3 /D74 12GV3 | Operation and Insta llation Guide | Specification s . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 74 Specifications Table 26: Specifications Primary: Terminals 1 and 2 16.5 VAC 40 VA class 2 plug-in transform er (D1640) Volt age Inp ut (Power Supply) Secondary: Terminals 4 and 5 Sealed lead-acid rechargeable battery[...]
-
Page 75
D94 12GV3 /D74 12GV3 | Operation and Installation Guide | Notes . Bosch Security Systems, Inc. | 10/10 | F0 1U143070-03 75 Notes[...]
-
Page 76
Bosch Security System s, Inc. 130 P erint on Par kway Fairport, NY 14450 USA www.boschsecurity.com © Bosch Security S ystems, Inc., 2010[...]