Go to page of
Similar user manuals
-
Boiler
Crown Boiler BSI172
54 pages 1.17 mb -
Boiler
Crown Boiler KSZ075
36 pages 0.31 mb -
Boiler
Crown Boiler XE-5
20 pages 3.91 mb -
Boiler
Crown Boiler BSI138
54 pages 1.17 mb -
Boiler
Crown Boiler 24-09
90 pages 6.5 mb -
Boiler
Crown Boiler MWC Series
88 pages 9.07 mb -
Boiler
Crown Boiler JSE310
46 pages 2.01 mb -
Boiler
Crown Boiler BWC225
26 pages 3.96 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Crown Boiler 50-004, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Crown Boiler 50-004 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Crown Boiler 50-004. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Crown Boiler 50-004 should contain:
- informations concerning technical data of Crown Boiler 50-004
- name of the manufacturer and a year of construction of the Crown Boiler 50-004 item
- rules of operation, control and maintenance of the Crown Boiler 50-004 item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Crown Boiler 50-004 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Crown Boiler 50-004, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Crown Boiler service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Crown Boiler 50-004.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Crown Boiler 50-004 item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
Crown Boiler Company CWD Series Boilers 50-003 (3”), 50-004 (4”) Coaxial T erminal Installation Instructions If the optional coaxial terminal is used, it should be installed in the wall before vent assembly is started. Install the terminal in accordance with the following procedure (Figures 1a, 1b & 1c): Position the wall face plate on the [...]
-
Page 2
FIGURE 1b: CROWN COAXIAL TERMINAL EXPLODED VIEW FIGURE 1c: CROWN COAXIAL TERMINAL ASSEMBL Y Loosen the hose clamp on the end of the exhaust terminal. Mount the exhaust terminal onto the intake terminal with the “V” 8. horizontal ( fl ue gas openings on top and bottom) as shown in Figure 1b. Slip the hose clamp over the “ fi ngers” on the [...]