Go to page of
Similar user manuals
-
Switch
Emerson Static Transfer Switch
152 pages 5.56 mb -
Switch
Emerson MPR25
120 pages 0.93 mb -
Switch
Emerson FDESIGN 30004000A
12 pages 2.66 mb -
Switch
Emerson 7ACTB
12 pages 1.02 mb -
Switch
Emerson GDESIGN 10004000A
12 pages 2.66 mb -
Switch
Emerson Series 300
20 pages 2.65 mb -
Switch
Emerson 7000 SERIES 7ADTB
12 pages 1 mb -
Switch
Emerson 185
12 pages 1.12 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Emerson 300, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Emerson 300 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Emerson 300. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Emerson 300 should contain:
- informations concerning technical data of Emerson 300
- name of the manufacturer and a year of construction of the Emerson 300 item
- rules of operation, control and maintenance of the Emerson 300 item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Emerson 300 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Emerson 300, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Emerson service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Emerson 300.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Emerson 300 item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
381333–289 C 50 Hanove r Road, F lorham Park, New J ersey 07932–1591 USA For sales or service call 1 800 800–2726 (A SCO ) www.ascopower .com AS CO PO WER TECH NO LOGI E S CA NA DA PO Box 1238, 17 Airport R oad, Brantf ord, O ntario, Can ada N 3T 5T3 Operator’s Manual Seri es 300 Automatic T ransfer S witc hes J–de si gn, 600 A DANGER is [...]
-
Page 2
[...]
-
Page 3
Namepl ate The T rans fer Switch nam epla te incl udes data for each sp ecific A SCO S eries 300 A TS. Use the A TS only wit hin the limits show n on this namep late. Ca talog Num ber Identif icatio n A typ ica l C ata l og Numbe r i s s hown be lo w wi th i ts elements ex plained . The ex ample is for a Series 300 A T Sw i t hs w i t c h e dn e u [...]
-
Page 4
[...]
-
Page 5
SECT ION 1 INST ALLA TION 1 --- 1 Series 300 A utomatic T ransfer Sw itches are fac tory wired an d tested. Install ation requir es skid rem oval then sec urin g the enc los ure to the s uppor ting foundation. Remove th e Shipping S kid Open the fr ont door and rem ove the four l ag sc rews ( 2 in front, 2 i n rear) securing enc losure to the wood [...]
-
Page 6
ter min al b lock f or e ngin e s ta rt a nd auxiliary ci rcuit connections left s id e of transfer switch COMMON FEA TU RE 7 closes to start FEA TU RE 8 open s to star t COMMON FEA TU RE 14B closed on em ergenc y FEA TU RE 14A clos ed on nor mal COMMON FEA TU RE 14BA closed on em ergenc y FEA TU RE 14AA clos ed on nor mal Engi ne Sta rti ng Sig na[...]
-
Page 7
INST ALLA TION (cont inued) 1 --- 3 F unctio nal T est The F unctional T est consists of thr ee chec ks: manual operation, v oltage chec ks, and el ectrical operation. NOT ICE Do these checks in the order presented to avoid damaging the auto matic transfer s witch. R ead all instructions on the W iring Diagram and labels affixed to the autom atic t[...]
-
Page 8
INST ALLA TION (cont inued) 1 --- 4 Fi gure 1 -4 . Maintenance handle o peration and co ntact positi on indic ators. observe these l ights Figure 1–5. Standard contro ls and indicato rs. 2–V o l t a g eC h e c k s First check nameplate on tra nsfer swi tch; rated voltage m u s tb et h es a m ea sn o r m a la n de m e r g e n c yl i n e voltages[...]
-
Page 9
INST ALLA TION (cont inued) 1 --- 5 p r e s st h i sb u t t o n observe these l ights Figure 1–6. Standard contro ls and indicato rs. 3 – Electrica l Opera tion Th i s pr oce du re wi ll che ck t he e le ctr ica l o pe ra ti o n o f the A utomatic T ransfe r Switch. See Figure 1–6. Close th e transfe r switc h encl osure door a nd tighten t h[...]
-
Page 10
Hol d 15 sec .t o start t he engine generator and to transf er the load to emergency . Press to cancel the active exercise period (sto ps engine now or afte r cooldow n) Se e page 5– 1. Hol d 5 sec .t os e t 20 min. engine ex ercise perio d immediately (engine starts) and weekly thereaf ter . ³ blinks sl owly when button is r eleased (set) and d[...]
-
Page 11
SECT ION 3 TEST ING & SERVIC E 3 --- 1 PREV ENTIV E MAIN TENAN CE F or high rel iabil ity and long l ife for the A TS: Ope rate t he sw itc h at l east o nce a mo nth .P e r f o r m t h i s 4–step Electrical Operat ion T e st (te st with load t ransfer). T r ansfer Swi tch T est 1. Press and ho ld the door -mounted T ra nsfer T est button unt[...]
-
Page 12
TEST ING & SERVIC E (continued) 3 --- 2 MANUAL L OAD TR ANSFER This pr oced ure w ill m anual ly tr ansfer th e load if th e cont ro lle r is d i sco nne ct ed . Do no t manually operate the transfer switch until bot h power so urces are disconnected: open bot h circuit breakers . 1. Open normal and emergency source ci rcuit brea kers. 2. Use t[...]
-
Page 13
SECT ION 4 ADJUST MENTS 4 --- 1 Ti me De l a y Ad j u st m e n t Standard ti me delays are set to customer specificati ons (if none specif ied, st andard factory set tings are used). T o change a setting, follow proc edure on page 4-2. Use T abl e 4-1 as a gu ide to time del ay values and their c or- responding adjustment DIP switch or potentiomete[...]
-
Page 14
ADJUST MENTS (continued) 4 --- 2 NOT ICE Do not make any set ting changes while the contro ller is energized. How to Change a Setti ng 1. Prev ent the transfer switch from operating b y discon- nec ting one s ourc e first, then the o ther, as fol low s: a. If the transfer s witch is in the No rmal p osition, ope n t he e mer gen cy so urce ci r cui[...]
-
Page 15
SECTION 5 CONTROL FEA TURES – ENGINE EXER CISERS 5 --- 1 These timer s periodic ally exer cise the em ergenc y engine-g enerator p lant. They can be s et to exercise w ith or withou t load tr ansfer, or they can b e compl etely disab led. The engine-gen erator shoul d be exercised u nder load on ce a week for a minimum time period of 20 minutes, [...]
-
Page 16
CONTRO L F EATURES (continued) 5 --- 2 Opt ion al Ac ce ssory 11BG – SOURCE A VAILABILITY SIG NAL & P ROGRAMMA BLE EN GINE EX ERCIS ER MOD ULE 2–line display 3 buttons connectio ns for source ava ila bilit y signal co ntacts Figure 5–2. Accessory 11BG modul e (mounted behind operato r interface and connected to the co ntroll er) incl udes[...]
-
Page 17
Fa s t/ Sl o w A d j u st Dayl ight Savi ng Time A dju st Date Time Start T Ime Engine Exerciser Run TIm e CONTRO L F EATURES (continued) 5 --- 3 How to Set Option a l Progra mm ab le En gin e Exe rcis er (p art o f Acc. 11BG m od ule) Haza rdous vol tage ca pabl e of causin g shock, burns, o r death is used in this t ransfer switch. Deenergize bo [...]
-
Page 18
CONTRO L F EATURES (continued) 5 --- 4 INPHASE M ONITOR FOR M OTOR LOAD TR ANSF ER Inphase monitori ng logic con trols tr ansfer and retransfe r of motor loads, so that inrush current s do not exceed normal starti ng currents. It a voids nuisance tripping of cir cuit breakers and m echanic al damag e to mot or co up li ngs . The Motor Load T ransfe[...]
-
Page 19
CONTRO L F EATURES (continued) 5 --- 5 OPTIONAL STR IP HEA T ER (Accessor y 44) A cc essory 44 Str ip Heater is design ed to keep ambient temp eratures within the A utomatic T ransfer Switc h en closu re a t a ccep ta ble le ve ls. Th is a cces so ry co nsi s ts of a mounting bra cket with strip heat er, thermosta t, and terminal block. A transform[...]
-
Page 20
INDEX Printed in U .S.A. Copy right - - - ASC O Power T echn ologies, L.P . 2011 A accessories, 5–2, 5–5 auxil iary cir cuits , 1–2 B battery , 4–2, 5–1 buttons, push, 3–1 bypass time delay, 1–5, 2–1, 3–1 C cable lugs, 1–1 prepar ation, 1–1 cat alo g nu mber, in si de co ve r cleaning, 3–1 connections engine control contact,[...]