Go to page of
Similar user manuals
-
Electric Steamer
Henny Penny GSC-620 gas
12 pages 0.59 mb -
Electric Steamer
Henny Penny GSC-220
2 pages 0.11 mb -
Electric Steamer
Henny Penny ESC-115 Electric
12 pages 0.59 mb -
Electric Steamer
Henny Penny ESC-615 electric
12 pages 0.59 mb -
Electric Steamer
Henny Penny ESC-220
2 pages 0.11 mb -
Electric Steamer
Henny Penny CSL-6
4 pages 1.3 mb -
Electric Steamer
Henny Penny CSM
11 pages 0.72 mb -
Electric Steamer
Henny Penny GSC-615 gas
12 pages 0.59 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Henny Penny CSL, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Henny Penny CSL one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Henny Penny CSL. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Henny Penny CSL should contain:
- informations concerning technical data of Henny Penny CSL
- name of the manufacturer and a year of construction of the Henny Penny CSL item
- rules of operation, control and maintenance of the Henny Penny CSL item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Henny Penny CSL alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Henny Penny CSL, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Henny Penny service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Henny Penny CSL.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Henny Penny CSL item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
CSL CSM CSB 62 INTRODUCTION This section provides the installation instr uctions for the Henny Penny Electric Combi-Steamers. NOTE: The installation of this unit must conform to all local, state, and federal codes. In the absence of codes use ANSI/NFP A No. 70-latest edition. NOTE: Canadian installations must conform with the Canadian electrical co[...]
-
Page 2
CSL CSM CSB 63 Installation – Electric Units (continued) Floor Units: NOTE: Adequate clearance must be provided for ser vicing and for operation. Minimum clearances have to be maintained from the adjacent walls. Left Side Right Side Back Side CSB, CSM, CSL-20, 40 14” (350mm) 2” (50mm) 2” (50mm) Place the combi-steamer on a level and sturdy [...]
-
Page 3
CSL CSM CSB 64 ELECTRICAL SUPPL Y Standard electrical supply for all Combi-Steamers is 208-240 volt, 3 phase, 50-60 Hz. NOTE: The power connections are located behind the ser vice door (see section 5-3). Each unit requir es a separate fused ser vice accor ding to the following table: (3 phase only) Model V oltage Phase Amps Load CSL/M/B-6 208V 3 27[...]
-
Page 4
CSL CSM CSB 65 WA TER SUPPLY The Combi-Steamer should only be connected to a cold water supply which meets the quality requir ements by the EPA on drinking water . Soft water must be at least 5 or 6 grains. The recommended water supply pr essure is 44 psi, but 22 to 87 psi will work. The water connection is done on a 3/4” NPT thread fitting, and [...]
-
Page 5
CSG 66 INSTALLA TION GAS UNITS This section provides the installation instr uctions for the Henny Penny Gas Combi-Steamers NOTE: The installation must conform with local codes or in the absence of local codes, with ANSI Z223.1 latest edition and electrical code ANSI/NFP A No. 70 latest edition. NOTE: For Canadian installations it should be done in [...]
-
Page 6
CSG 67 Minor unevenness of the sur face/floor can be compensated by adjusting the metal legs of the stand or the appliance. The weight of the units are as follows: CSG-10 556 lbs. (252 Kg) CSG-12 529 lbs. (240 Kg) CSG-20 1015 lbs. (460 Kg) VENTILA TION-CSG The gas Combi-Steamers all should be located with a provision for venting into an adequate ex[...]
-
Page 7
CSG 68 WA TER SUPPLY-CSG The Combi-Steamer should only be connected to a cold water supply which meets the quality requir ements by the EP A on drinking water . Soft water must be at least 5 or 6 grains. The recommended water supply pr essure is 44 psi, but 22 to 87 psi will work. The water connection is done on a 3/4” NPT thread fitting, and a m[...]
-
Page 8
CSG 69 Installation – Gas Units (continued) ELECTRICAL SUPPL Y -CSG The gas Combi-Steamer requir es 120 volt, single phase, 60 Her tz, 15 amp, 3 wire grounded ser vice. The gas unit is factor y equipped with a gr ounded cord and plug. NOTE: The unit will not function and the reset signal will stay on with the white wire connected to the live blac[...]
-
Page 9
CSG 70 GAS SUPPL Y -CSG RIGHT MINIMUM PULL of equipment away from wall permissible for accessibility to Quick Disconnect Device WRONG A VOID SHARP BENDS AND KINKS when pulling equipment away from wall. (Maximum pull will kink ends, even if installed properly , and reduce Connector life.) Couplings and hose should be installed in the same plane as s[...]
-
Page 10
CSG 71 GAS SUPPL Y (continued) A steam bur ner gas valve and dr y heat bur ner gas valve r espectively are responsible for the gas supply to the indi- vidual bur ners. The Combi-Steamer models CSG have manual shut-of f valves, that can be r eached from the front without tools. The manual shut-of f valves of these units are located behind the ser vi[...]
-
Page 11
CSG 72 NOTE: After turning on the gas, the manual shut-of f valve must remain open, except during pressure testing as outlined in the above steps, or when necessar y during service maintenance. This incoming pressur e reading can be taken by installing a gas pressur e gauge on the front of the unit’s main gas valves test por t. This should be don[...]