Lennox International Inc. G32Q4-100 manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Lennox International Inc. G32Q4-100, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Lennox International Inc. G32Q4-100 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Lennox International Inc. G32Q4-100. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Lennox International Inc. G32Q4-100 should contain:
- informations concerning technical data of Lennox International Inc. G32Q4-100
- name of the manufacturer and a year of construction of the Lennox International Inc. G32Q4-100 item
- rules of operation, control and maintenance of the Lennox International Inc. G32Q4-100 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Lennox International Inc. G32Q4-100 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Lennox International Inc. G32Q4-100, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Lennox International Inc. service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Lennox International Inc. G32Q4-100.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Lennox International Inc. G32Q4-100 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    LENNOX _2001 Lennox Industt]e-_ _nc Dallas Texas USA INSTALLATION INSTRUCTIONS G32Q SERIES UNITS GAS UNITS 504,488M _[_2ech nical 11/2001 blications Supersedes 504,382M Litho U.S.A. RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE IT a hi6 of_ _ _ te:nts i :: Unit Dimensions ................................ 2 G32Q Parts Arrangement ..................[...]

  • Page 2

    1 1116 (41) _8 (16)'-IP 1 1116 3 5/8 ,o-o I • v 151 ) AIR OUTLET TOP VIEW "ql'-- 28 1/2 (724) I I ELECTRICA INLETS _ {Both Sides) m L _____(Either Side) J Lt:;:"ZtJ Return Air Knockout (Bottom) SIDE VIEW T 21 3/4 (552) GAS PIPING INLET (Both Sides) 91- 4(102) T 46 (1168) EXTERNAL SIDE RETURN /_R FIL'I1ER K]T (Either Side [...]

  • Page 3

    GLASS FIBER GASKET FRESH AIR INTAKE FITTING BURNERBOX ASSEMBLY PATCH FLUE COLLAR TOP CAP WARM HEADER _I (COLLECTORTH_ _ . BOX / / PATCH PLATE WITH l BARBED FITTING AND FLAME ROLL-OUT SWITCH FLUE DuralokPlus TM HEAT EXCHANGER ASSEMBLY CABINET RESSURE-. FLAME SIGHT p swrrcH GLASS / BURNER BOX / HIGH HEAT COVER ]3NO-STAGE PRESSURE GAS VALVE AND SWITCH[...]

  • Page 4

    Lennox G32Q units are CSA International certified to ANSI Z21.47 and CSA 2.3 standards. In the USA, installation of Lennox gas central furnaces must conform with local building codes. In the absence of local codes, units must be installed according to the cur- rent National Fuel Gas Code (ANSI-Z223.1) in the United States. The National Fuel Gas Cod[...]

  • Page 5

    NOTE - G32 senes units must not be used as a construc- tion heater dunng any phase of construction. Very low re. turn air temperatures, harmful vapors and misplacement of the filters will damage the unit and lower its efficiency. The G32Q is an upflow gas furnace. A changeover kit is necessary if the furnace is to be used with L.P. gas, These instr[...]

  • Page 6

    Bottom Return Air Applications If return air is to terminate through the floor under the fur- nace, a direct, airtight and sealed connection must be made to the bottom of the furnace, 1 - Cut opening in floor or platform. Using knockouts provided, cut bottom of base panel. See figure 2. KNOCKOUT PATTERN FOR BOTTOM RETURN AIR APPLICATION ,v vd iV Vd[...]

  • Page 7

    FILTER DOOR ASSEMBLY FILTER DO0_ _ PIN _T_ TAB FILTER DOOR I I I _'l]l FILTER FIGURE 6 4 - Position filter door on end offilter so that the thumb tab side of the filter door is away from the furnace. Squeeze thumb tabs to secure filter to door. 5 - Guide filter and filter door into the filter rack installed on side of furnace. Push door into f[...]

  • Page 8

    Lennox Part No. 60G77 33K97 15F75 22G44 15F74 44J41 44J40 30G28 30G79 LB-49107CE LB-87942 LB-49107CC LB-49107CD LB_9107CB LB-65678A LB-65701A WTK WTKX TABLE 3 TERMINATION KITS Kit LB# Description*Inches (ram) 1-1/2" (38) Concentric Termination Kit 3" (50,8) Low Pressure Drop Concentric Term Kit 2" (50,8) Roof Termination Kit 2" [...]

  • Page 9

    All cementing of joints should be done according to the specifications outlined in ASTM D 2855. 1 - Measure and cut vent pipe to desired length. 2 - Debur and chamfer end of pipe, removing any ddges or rough edges. If end is not chamfered, edge of pipe may remove cement fTom fitting socket and result in a leaking joint. 3 - Clean and dry surfaces t[...]

  • Page 10

    { NOTE - Exhaust piping should be checked carefully to make sure there are no sags or low spots. NOTE - Exhaust piping must be Insulated wffh 1/2 inch (13 ram) Armaflex or equivalent when nJn through un- heated space. Do not leave any area of exhaust pipe open to outside air. extenor exhaust must be insulated wrth 1/2 inch (13 ram) Armaflex or equi[...]

  • Page 11

    On roof terminations, the intake piping should termi- nate straight down using two 90 ° elbows. See figure 8. NOTE - If winter design temperature is below 32°F (O°C), exhaust piping must be insulated with 1/2 inch (13 mm) Armaflex or equivalent when run through unheated space. Do not leave any surface area of exhaust pipe open to outside air,&qu[...]

  • Page 12

    1/2 (12.7) FOAM INSULATION IN UNCONDITIONED SPACE Inches (mm) n OUTSIDE WALL qlp Optional Turndown Shown (Intake Onty) TOP VIEW WALL TERMINATION (22G44) LB-49107CD for 2 (50,8)Venting (44J40) LB-65701A for 3 (76.2) Venting FIGURE 11 EXHAUST INTAKE Inches (ram) EXHAUST TERMINATION abovegrade, CONCENTRIC WALL TERMINATION (60G77) LB-49107CE for G32-75[...]

  • Page 13

    Inches(turn) 1/2 (13) 3 x 2 {76 x 51) OR FOAM 2 x 1 .t/2 (61 x 36) INSULATION REDUCER BUSHING LOCATION 3 (76) OR FOR OFFSET TERMINATION 2 (51) 90 _ ELBOW 3 (76) OR Optional Turndown _ _ 2 (5t) 90" ELBOW (Not Shown) May Be Used on Intake Only FRONT VIEW WALL TERMINATION (22G44) LB-49107CD for 2(51) Venting (44J40) LB-65701A for 3(76) Venting FI[...]

  • Page 14

    Inches (mm) Front View [ 34 9 _, EXHAUST I '10" VENT = _ NOTE - Enclosed ex_us_ pipe _s insuleted w;th _F2 i,_Ch (13 ram) INTAKE foam insu_abon If in_al(e ar_ ex- VENT hsusl I_pes am reversed, sl=l and r_move foam instJlat_ot_ and Ii teat)ply to OUmr vent Exhaust vent mr=st be insulated Side View 4 USTVENT o iNTAKE VENT E VENT TERMINATION[...]

  • Page 15

    CONDENSATE PLUMBING (Plumbing must be vented higher than coll.) FIGURE 22 6- Connect condensate drain line (1/2 inch [13 mm] SDR 11 plastic pipe or tubing) to condensate con- nection on condensate trap assembly and route to open drain. Condensate line must be sloped down- ward away from drip leg to drain. If the drain level is above condensate outl[...]

  • Page 16

    Nominal Iron Pipe Size -InchesImm) t/4 (635) 3/8 (6,53) (127) 314 (19.05) 1 (254) 1-1/4 (31.75) Io1/2 (381) 2 (5O.8) 2-112 (83.5) 3 (76.2) 4 (101.6) NOTE - Capacity j TABLE 5 GAS PIPE CAPACITY - ft.3/hr Im31hrl Internal Length of Pipe-Feet (m) Diameter 10 20 30 40 50 60 70 80 90 100 .InchesImm) (3.048) (6.096) (9.144) (12.192) 115.2401 (18.288) (21[...]

  • Page 17

    3- Electrically ground unit in accordance with local codes or, in the absence of local codes, in accor- dance with the current National Electric Code (ANSI/ NFPA No. 70) and in Canada with the current Cana- dian Electric Code part 1 (CSA standard C22.1). The ground wire is provided in the field make-up box. To ensure proper grounding of the furnace[...]

  • Page 18

    G32Q CONTROL BOX DOOR INTERLOCK SWITCH SURELIGHT / CONTROL TRANSFORMER ._,_ C=RCU_ '_1_ _BREA_ER TWO_TAGE _ _'--'-CONTROL BOARD FIGURE 29 SURELIGHT INTEGRATED CONTROL BOARD IIZ II LO_ TX HOT :_(_ ,_ "_-III 0110 UIIO I -- ÷ _.._, .. _ ÷ L_____J _ FAN DELAY SFJ_-_E JI o.P -- I I i I I I I ........... J J _.__ _--.-J ® ® Y G W [...]

  • Page 19

    G32Q TWO-STAGE CONTROL BOARD 0 MODE OF OPERATION JUMPER (Factory set at TWO STAGE) FIGURE 31 TYPICAL G32Q FIELD WIRING DIAGRAM W2 TIMED ON DELAY JUMPER (Factoryset at 8 minutes.) FIGURE 32 Page 19[...]

  • Page 20

    F20M /_C 4.5 E]_(4 I|F IJ_D] O Ll'_b_m II I I I I it i I i i IIilll I --_' TYPICAL G32Q SCHEMATIC WIRING DIAGRAM ,,o HION NEAT srj Ti_ IVI SlO Ul_ LIMIT SI]_ c_urr l_ AiR Lml_ W_ r---n 2 (ill FIGURE 33 Page 20[...]

  • Page 21

    FOR YOUR SAFETY READ BEFORE OPERATING WARNING CAUTION BEFORE OPERATING smell all around the appliance area for gas. Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor. This unit is equipped with a gas control knob. Use only your hand to turn the gas control knob. Never use tools. If knob will not tu[...]

  • Page 22

    4- After the prepurge is complete and the pressure switch is closed, a 20-second initial ignitor warm-up period begins. 5 - After warm-up period, gas valve is energized on sec- ond stage (high heat). 6 - Gas valve opens and gas is ignited. When flame is established, flame sensor sends signal to control module to de-energize the ignitor. NOTE - If t[...]

  • Page 23

    Model No. G32-75 natura_ G32-100 natural G32-125 natural G32-75 L.P G32-100 L,P. G32-125 L,P. 0 to 4500 ft. (0 to 1372 m) above sea level 3.8 3.5 (0.87) 7.5 7.5 (1.90) 7.5 11.90) TABLE 6 Manifold Pressure (outlet) in. w.g (kPa) 4501 to 5500 ft. (1373 to 1676 m) above sea level 3,5 34(0.85) 7.5 7.3 (1.81) 7.3 (1.81 } 5501 to 6500 ft. (1677 to 1981 m[...]

  • Page 24

    FAN*OFF DELAY ADJUSTMENT 60sec, 90sec. 120sec, 180sec. To adjust fan-off delay, flip dip switch to desired setting. FIGURE 36 Temperature Rise Check temperature rise and, if necessary, adjust blower speed to maintain temperature rise within range shown on unit rating plate. Two-Stage Control The two-stage control allows the field selection of one o[...]

  • Page 25

    2 - Have a shallow pan ready to empty condensate wa- ter. Avoid spilling water into the control box. 3 - Remove clamp from flue assembly and remove boot or cap. Empty water from cap. Visually inspect bot- tom of flue assembly. Replace boot and clamp. 4 - Remove boot from condensate trap and empty wa- ter. Inspect trap then replace boot. Cleaning Du[...]

  • Page 26

    34 - Reconnect widng to gas valve. Brown wire to "HI," yellow wire to "C" and orange wire to "M." Reconnect wires to name roll-out switch. NOTE - Unit is polarity-sensitive. 120V supply wiring must be installed correctly 35 - Reconnect main gas line to gas valve. Use second wrench on gas valve to avoid transferring tor[...]

  • Page 27

    The following repair parts are available through independent Lennox dealers. When ordering parts, include the complete furnace model number listed on the unit rating plate. Example: G32Q3-75-1. CABINET PARTS Cabinet cap Blower panel Upper access panel CONTROL PANEL PARTS Two-Stage control board Surelight TM integrated control board Transformer Circ[...]

  • Page 28

    HEATING SEQUENCE OF OPERATION NORMAL HEATING MODE ABNORMAL HEATING MODE I I I I I I POWER ON I CONTROL SELF-CHECK OKAY? I _ COMBUSTION AIR iNDUCER ON FOR 1 SECOND. I POLARITY OKAY? YES _ ROLLOUT SWITCH CLOSED? YES BURNER OFF? (CONTINUOUS FLAME CHECK) YES _ NORMAL OPERATION: LED #1 -- SIMULTANEOUS SLOW FLASH LED #2 - SIMULTANEOUS SLOW FLASH THERMOST[...]

  • Page 29

    HEATING SEQUENCE CONTINUED NORMAL HEATING MODE J PREPURGE J_ 15 SECONDS l IGNITION SEQUENCE BEGINS (Ignition tfiatcounter initiated.) ABNORMAL HEATING MODE j (s, GW'N_%_,%_0,0_',_",G%EF%%%, / GAS VALVE OFF. COMBUSTION AIR AND INDOOR BLOWER OFF. J- ALTER_"%_ _NL%t _F_SRES / MAIN GAS VALVE OPEN LOW HEAT ONLY (Ignitorremains energi[...]

  • Page 30

    HEATING SEQUENCE CONTINUED NORMAL HEATING MODE ABNORMAL HEATING MODE I PRESSURE SWtTCH CLOSED? ! 11 L'WO'STAGE'OOE I S,N";L;'S_;_%T CALL FOR 2ridSTAGE 2ridSTAGEON DELAY HEAT (HIGH HEAT) ON CONTROL BOARD FROM THERMOSTAT COMPLETE (B, 12 OR 15 MIN I INDOOR BLOWER ON HIGH HEATING SPEED? 1 I COMBUSTION AIR BLOWER ON HIGH SPEED? [...]

  • Page 31

    COOLING SEQUENCE OF OPERATION NORMAL COOLING MODE ABNORMAL COOLING MODE I POWER ON I I IGNITION CONTROL MAIN POWER ON. I CONTROL SELF DIAGNOSTIC CHECK. IS CONTROL OPERATING NORMALLY? YES _1 I TURN INDUCER ON FOR 1 SECOND. I IS POLARITY REVERSED? SIGNAL HOLDS" N_ PRo/SE THERo E ._ I YEs-J UNTIL UNIT IS I-_=-I ERR UND._ GPRRoOuPNEDRELY" I I[...]

  • Page 32

    SURELIGHT CONTROL CONTINUOUS FAN SEQUENCE OF OPERATION I LED: SLOW FLASH RATE REMAINS I UNCHANGED THROUGHOUT SEQUENCE, MANUAL FAN SELECTION MADE AT THERMOSTAT, CONTROL (G) ENERGIZES INDOOR BLOWER AT ACB LOW SPEED. ACC. TERM. S ENERG ZED i T.ERMOSTATCA,LSFORHEAT_W_ i--'1%_O_"_%_g"_'_ S , _¥ES SPEED AFTER NORMAL DELAY. I,NDOOR BL[...]