Linear SLD manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Linear SLD, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Linear SLD one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Linear SLD. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Linear SLD should contain:
- informations concerning technical data of Linear SLD
- name of the manufacturer and a year of construction of the Linear SLD item
- rules of operation, control and maintenance of the Linear SLD item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Linear SLD alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Linear SLD, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Linear service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Linear SLD.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Linear SLD item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    SLR - SLC - SLD Slide Gate Oper ator Installation Guide PRINTER’S INSTRUCTIONS: INSTR,INSTL,SLR SLC SLD - LINEAR P/N: 227968 X11 - INK: BLA CK - MA TERIAL: 20 LB. MEAD BOND - SIZE: 8.500” X 11.000” - SCALE: 1-1 - FOLDING: ALB UM-FOLD - BINDING: SADDLE-STITCH C US I N T E R T E K CM L I S T E D Operator models contained in this manual conform [...]

  • Page 2

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 2 - 227968 Revision X13 2-3-09 T able of Contents Pre-installation Information .................................. 1 B e f o r e Y o u B e g i n . . . ...................................... 1 Alwa ys Check the Gate’ s Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Gate [...]

  • Page 3

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 1 - 227968 Revision X13 2-3-09 Pre-installation Information Before Y ou Begin... Bef ore unpacking, inspect the car ton for exterior damage. If you find damage, advise the deliv er y carrier of a potential claim. Inspect your pac kage carefully . Y ou can chec k y our accessor y box par [...]

  • Page 4

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 2 - 227968 Revision X13 2-3-09 Wiring Specifications Ref er to the f ollowing steps f or details on pow er and accessor y wiring for the operator . AC P ower Wiring 1. Find the listing on this page corresponding to the model, voltage and horsepower r ating of your operator . 2. The dista[...]

  • Page 5

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 3 - 227968 Revision X13 2-3-09 Mounting P ad Installation The gate operator mounts bolted to a custom poured concrete mounting pad. The pad suppor ts the operator and pre vents it from mo ving dur ing operation. An optional post mount kit is also av ailable (P/N 2120-483) which allows ins[...]

  • Page 6

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 4 - 227968 Revision X13 2-3-09 Gate Brack et and Chain Assembly ✓ NO TE: The item numbers shown in these illustrations are f or reference only . F or the actual par t numbers, ref er to the par ts lists in the rear of this manual. Assemble a gate brack et (1) to the front edge of the ga[...]

  • Page 7

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 5 - 227968 Revision X13 2-3-09 Operator Prepar ation Vent Plug Installation In order to k eep gear oil from spilling out dur ing shipping, gear reducers used in this gate operator has either a solid plug, or a sealed v ent plug, installed at the factory . F or oper ators with a solid plug[...]

  • Page 8

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 6 - 227968 Revision X13 2-3-09 Operator Setup (Continued) Limit Nuts Rough Adjustment The limit nuts are not preset at the f actor y and m ust be adjusted f or the length of the gate in each installation. The limit s witches are activ ated b y two threaded nylon rotar y limit n uts which [...]

  • Page 9

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 7 - 227968 Revision X13 2-3-09 Controller Features SHADOW/RESET PROGRAMMING BUTTONS POWE R INDICATORS DISPLAY WHIP ANTENNA OPERATION BUTTONS OPERATION AND PROGRAMMING INDICATORS ANTENNA CONNECTOR MOTOR BOAR D COVE R INPU T POWE R TERMINALS ACCESSORY POWE R TERMINALS RESET BUTTON TERMINALS[...]

  • Page 10

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 8 - 227968 Revision X13 2-3-09 Indicator Descriptions INDICA TOR DEFINITION INDICA TION WHEN LIT DURING NORMAL OPERA TION INDICA TION WHEN LIT DURING PROGRAMMING OPERA TION PROGRAMMING 24 V OL T INPUT PO WER LOW VOL T AGE A C POWER IS PRESENT 24 V OL T DC A CCY POWER LO W VOL T AGE DC PO [...]

  • Page 11

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 9 - 227968 Revision X13 2-3-09 T erminal Descriptions TERMINAL GROUP FUNCTION A C N 24 V OL T INPUT F ACT OR Y CONNECTED T O 24 V AC FR OM TRANSFORMER OR 24 VDC FROM CONTINUOUS DUTY DC SUPPL Y . AC DC - A CCESSOR Y POWER PRO VIDES 24 V OL T DC POWER FOR A CCESSORIES. (.5A MAX) DC + RESET [...]

  • Page 12

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 10 - 227968 Revision X13 2-3-09 Operator Accessor y Connections 3-BUTTON ST ATIO N KEYSWITC H FIRE ACCESS SWITCH SINGLE-CHAN NEL RADIO RECEIVER WIRELESS GA TE EDGE SE NSOR MG T TRANSMITTE R PHOTOEYE FO R REVERS E PHOTOEYE FO R OPEN OBS TRUCTIO N TELEPHONE E NTR Y KEYPAD EXTERNAL POWE R SO[...]

  • Page 13

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 11 - 227968 Revision X13 2-3-09 Basic Controller Programming Progr amming Overview The Controller can be programmed with v ar ious options for the operator . The programming fields are defined as “functions” that hav e “options”. T o make setup easier for the installer , the Con[...]

  • Page 14

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 12 - 227968 Revision X13 2-3-09 Basic Controller Programming (Cont.) Run Alarm and Pre-start Alarm The f actor y def ault is Run Alarm on and a 3-second Pre-start Alar m. The operator’ s beeper will sound 3 seconds before the operator star ts. The options are: Run Alarm Off and Pre-star[...]

  • Page 15

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 13 - 227968 Revision X13 2-3-09 Advanced Controller Progr amming Entering Advanced Progr amming Mode T o access and program the Advanced Programming functions, for each programming session, Adv anced Programming m ust be enabled. After exiting programming, the Advanced Pr ogramming functi[...]

  • Page 16

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 14 - 227968 Revision X13 2-3-09 Advanced Controller Progr amming (Cont.) Auxiliary Relay Mode The A uxiliar y Rela y has nor mally open and nor mally closed contacts. The f actor y setting disables the A uxiliar y Relay . The relay can be set f or : Magloc k: • The relay will energiz[...]

  • Page 17

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 15 - 227968 Revision X13 2-3-09 Advanced Controller Progr amming (Cont.) Soft Start/Stop Duration This function is only used with DC slide gate Model SLD . This function causes the operator to star t and stop the DC motor slowly reducing gate wear and tear (at the full open or closed posi[...]

  • Page 18

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 16 - 227968 Revision X13 2-3-09 Advanced Controller Progr amming (Cont.) Radio Enable The Controller contains a built-in MegaCode ® radio receiv er to allow activation from up to 40 access control transmitters and two Model MGT (gate edge) transmitters . The factory default enab les the [...]

  • Page 19

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 17 - 227968 Revision X13 2-3-09 Loop Lay out Illustration SEPARATE PEDESTRIAN GATE REQUIRED 7 FEET MINIMUM DISTANCE FROM GATE 2" 3/8" LOOP SEALANT MULTIPLE TURNS REFER TO LOOP INSTALLATION NOTES FOR DETAILS TWIST WIRE FROM END OF LOOPS BACK TO OPERATOR AT LEAST SIX TIMES PER FOO[...]

  • Page 20

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 18 - 227968 Revision X13 2-3-09 Safety Edge Lay out Illustration #1 NOTES: 1. WIRE THESE ED GES FOR CLOSE OBSTRUCTION 2. WIRE THESE EDGES FOR OPEN OBST RUCTION 3. ON LEADING ED GE, WIRE FOR CLOSING OBSTRUCT IO N OR REVERSING IF DESIRED 4. ON TRAILING E DGE, WIRE FOR OPEN OBSTRUCTION REFER[...]

  • Page 21

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 19 - 227968 Revision X13 2-3-09 Safety Edge Lay out Illustration #2 NOTES: 1. WIRE THESE EDGES FOR CLOSE OBSTRU CTIO N 2. WIRE THESE EDGES FOR OP EN OBSTRUCTION 3. ON LEADING EDGE, WIRE FOR CLOSING OBSTRUCTION OR REVERS ING IF DESIRED 4. ON TRAILIN G EDGE, WIRE FOR OPEN O BSTRUCTION REFER[...]

  • Page 22

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 20 - 227968 Revision X13 2-3-09 Photoey e Installation Illustration CARE MUST BE TAKEN IN THE PLACEMENT OF PHOTOEYES TO MINIMIZE N UISANCE TRIPPING PHOTOEYE TO PROTECT FENCE LINE OUTSIDE OF PROTECTED AREA WIRED FOR OPEN OBSTRUCTIO N SEE ACCESSORY CONNECTIONS FOR DETAILS OF WIRING PHOTOEYE[...]

  • Page 23

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 21 - 227968 Revision X13 2-3-09 Picket Gate Installation CARD READER ON STAND PICKETS SPACE SMALLER THAN 2 1/4" MESH WITH OPEN INGS SMALLER THAN 2 1/4" TO A MINIMUM HEIGHT OF 48" ABOVE G ROUND OVER ENTIRE GATE LENGTH SEPARATE PEDES TRIAN GATE REQUIRED 7 FT. MINIMUM DISTANCE[...]

  • Page 24

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 22 - 227968 Revision X13 2-3-09 T rack Gate Installation OVERHEAD TRACK GATE WITH ADDED C-CHANNEL FOR GATE BRACKET ATTACHMEN T OVERHEAD TRACK GATE WITH ADDED BUSTLE FOR GATE BRACKET ATTACHMEN T COVER GATE WITH FABRIC WITH OPENINGS SM ALLE THAN 2 1/4" TO A MINIMUM HEIGHT OF 48" A[...]

  • Page 25

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 23 - 227968 Revision X13 2-3-09 Dual Gate Installations T wo ope rat ors can be used in dua l gate ins tall atio ns. T he oper ator s communicate with each other through the 3-wire COMM LINK terminals. When one operator activates, the COMM LINK connection signals the other operator to act[...]

  • Page 26

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 24 - 227968 Revision X13 2-3-09 Gate Operation Open Button Opens the gate. If the Controller is programmed to stop opening the gate at mid-trav el, a constant press of the OPEN button will override the Mid-tr av el Stop and completely open the gate. If the A uto Close Timer is set, it wil[...]

  • Page 27

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 25 - 227968 Revision X13 2-3-09 Error Indications During abnor mal operation, the Controller’ s displays and beeper will indicate the error condition that has occurred. Entrapment If an entrapment condition occurs detected by two repeated open or close obstr uction triggers, the Control[...]

  • Page 28

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 26 - 227968 Revision X13 2-3-09 T roubleshooting Contacting T echnical Support F or technical questions regarding Linear gate oper ators, contact the T echnical Ser vices Depar tment at: 1-800-421-1587 from 6:30 AM to 4:30 PM P acific time Operator fails to start A. If the operator has b[...]

  • Page 29

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 27 - 227968 Revision X13 2-3-09 Model SLR Exploded View 1 31 30 29 27 33 32 34 2A 2 3 28 A 24 26 22 25 36 39 15 13 23 4 21 35 20 12 11 10 9 8 16 14 18 19 17 7 7A 28 NOTE: MAY HAVE O PTIONAL TORQUE L IMITE R 1A 1B MODEL SLR MECHANICAL P ARTS LIST REF . # P ART # DESCRIPTION 1 2300-907 Oper[...]

  • Page 30

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 28 - 227968 Revision X13 2-3-09 Model SLC Exploded View 1 31 30 29 27 33 34 2A 2 3 24 26 22 25 36 15 13 23 4 21 35 20 12 11 10 9 8 16 14 18 19 17 7 7A 32 38 1A 1B 28 NOTE: MAY HAVE OPTIONAL TORQUE LIMITER[...]

  • Page 31

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 29 - 227968 Revision X13 2-3-09 MODEL SLC MECHANICAL P ARTS LIST REF . # P ART # DESCRIPTION 1 2300-907 Operator Cov er 1A 2510-354 Plunger Reset Assembly 2500-2240 Plunger Reset Button 2500-2241 Plunger Extension Only 1B 2200-790 Lock f or Cover , with Ke ys 2200-824 Extra K eys 2 2110-7[...]

  • Page 32

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 30 - 227968 Revision X13 2-3-09 Model SLD Exploded View 1 31 30 29 27 33 32 34 2A 2 3 24 26 22 36 25 38 15 13 23 4 21 35 20 12 11 10 9 8 16 14 18 19 17 7 7A 40 1A 1B NOTE: MAY HAVE OPTIONAL TORQUE LIMITER 41[...]

  • Page 33

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 31 - 227968 Revision X13 2-3-09 MODEL SLD MECHANICAL P ARTS LIST REF . # P ART # DESCRIPTION 1 2300-907 Operator Cov er 1A 2510-354 Plunger Reset Assembly 2500-2240 Plunger Reset Button 2500-2241 Plunger Extension Only 1B 2200-790 Lock f or Cover , with Ke ys 2200-824 Extra K eys 2 2110-7[...]

  • Page 34

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 32 - 227968 Revision X13 2-3-09 Model SLD Maintenance Battery Maintenance The gel-cell batter ies in this operator require no routine maintenance. For assured continued perf or mance, they should be replaced ev er y year . If pow er is to be remov ed f or one w eek or more , disconnect th[...]

  • Page 35

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 33 - 227968 Revision X13 2-3-09 Prev entative Maintenance General Linear gate operators are designed for many years of trouble-free operation and, under recommended operating conditions, will require only minimal maintenance. T o ensure that a unit is ready f or operation at all times, an[...]

  • Page 36

    SLR • SLC • SLD Slide Gate Operator Installation Guide - 34 - 227968 Revision X13 2-3-09 Gate Operator Installation Checklist ❑ ❑ 1. The gate has been chec ked to make sure it is le vel and mov es freely in both directions. ❑ ❑ 2. P otential pinch areas hav e been guarded so as to be inaccessible OR ha ve contact and/or non-contact obst[...]