Lochinvar VAL20000 manual

1
2
3
4
5
6
7
8

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Lochinvar VAL20000, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Lochinvar VAL20000 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Lochinvar VAL20000. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Lochinvar VAL20000 should contain:
- informations concerning technical data of Lochinvar VAL20000
- name of the manufacturer and a year of construction of the Lochinvar VAL20000 item
- rules of operation, control and maintenance of the Lochinvar VAL20000 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Lochinvar VAL20000 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Lochinvar VAL20000, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Lochinvar service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Lochinvar VAL20000.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Lochinvar VAL20000 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    L TV V AL VE APPLICA TION INSTRUCTIONS FOR LOW TEMPERA TURE PROTECTION COPPER-FIN AND POWER-FIN MODELS CB 495 - 2066 / CH 401 - 2071 AND PB 501 - 2000 INS7238 Rev C Kit components: V AL30000 - 1 1/2" V AL VE Models: CB 45 - 500 • V AL20000 1 1/2" L T V V alv e • INS7238 Instruction Sheet V AL3048 - 2" V AL VE Models: CB 495 - 745[...]

  • Page 2

    2 of 8 T ypical piping applications: Figure 4 _Primary/Secondary Piping of a Single Boiler - 1 1/2" V alve Figure 5_ Primary /Secondary Piping of Multiple Boilers - 1 1/2" V alve for each boiler DET AIL DET AIL C = SYSTEM RETURN WATER B = FROM BOILER OUTLET A = BLENDED WATER *Best practice for Indoor/Outdoor reset. **Best practice for set[...]

  • Page 3

    3 of 8 T ypical piping applications (cont.): Figure 6_ Primary /Secondary Piping of a Single Boiler - 2" V alve Figure 7 _Primary/Secondary Piping of Multiple Boilers - 2" V alve for each boiler Note: V alve must be installed with proper port orientation. Failure to observe port markings on the valve body prior to installing the valve cou[...]

  • Page 4

    T ypical piping applications (cont.): Figure 8 _Primary/Secondary Piping of a Single Boiler - 2 1/2" V alve Figure 9 _Primary/Secondary Piping of Multiple Boilers - 2 1/2" V alve for each boiler DET AIL DET AIL Note: V alve must be installed with proper port orientation. Failure to observe port markings on the valve body prior to installi[...]

  • Page 5

    Figure 1 1 _2" L TV V alve - Up to 750,000 Btu/hr Figure 12 _2 1/2" L TV V alve - 990,000 Btu/hr and up Figure 10 _1 1/2" L TV V alve - 45,000 - 500,000 Btu/hr PORT "A" PORT "B" PORT "C" 6.125 3.750 5.250 A B C SIDE TOP 5 of 8 INS7238 Rev C[...]

  • Page 6

    Figure 14 _2" - Flow vs. Pressure Drop Figure 15 _2 1/2" - Flow vs. Pressure Drop FLOW vs. PRESSURE DROP FLOW IN U.S. GPM Pressure Drop, PSID Figure 13 _1 1/2" - Flow vs. Pressure Drop 6 of 8 INS7238 Rev C Maintenance instr uctions The L T V valv e is maintenance fr ee. It does not r equire r egular cleaning or calibration. I n most [...]

  • Page 7

    7 of 8 INS7238 Rev C Notes[...]

  • Page 8

    Revision Notes: Revision A (INS7238 Rev A) reflects the addition of the 1 1/2" valve. Revision B (INS7238 Rev B) reflects the addition of the maintenance instructions. Revision C (ECO C02335) reflects the revision of FIG .’s. 1, 2, 3, 4, 6 & 8. 10/08 - Printed in U.S.A.[...]