Neuro Logic Systems 19" manual

1
2
3
4
5
6
7
8
9
10
11
12
13

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Neuro Logic Systems 19", along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Neuro Logic Systems 19" one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Neuro Logic Systems 19". A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Neuro Logic Systems 19" should contain:
- informations concerning technical data of Neuro Logic Systems 19"
- name of the manufacturer and a year of construction of the Neuro Logic Systems 19" item
- rules of operation, control and maintenance of the Neuro Logic Systems 19" item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Neuro Logic Systems 19" alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Neuro Logic Systems 19", and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Neuro Logic Systems service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Neuro Logic Systems 19".

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Neuro Logic Systems 19" item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    1U 17” & 1 9 LCD and S u n Keyboard Installati on gui d e for th e RFT2-17/ 19 In to a 4- post 19-in ch EIA ca binet 07/ 01/0 6 R ev 1. 0 Pag e 1 o f 1 3 Table of C onten ts Wh at’ s i n the B o x…………… …… ……………… ………………… ……………… ……. . 2 Ha r dw a re I n st al l at i o n… …………?[...]

  • Page 2

    RFT2 Rack Kit I n stallation Gu i de 07/ 01/0 6 R ev 1. 0 Pag e 2 o f 1 3 Box I nvent ory As you unp ack t he kit, e nsure tha t you have the following ite ms included in the b ox: 1 – 1U L CD w it h K eyboard 1 – 3m HD-15 t o HD-15 Vi deo C able 1 – 3m D V I -D to DVI-D V ideo C able 1 – 3m A to B U SB Cable 1 – 2m IE C Power Cable 1 –[...]

  • Page 3

    RFT2 Rack Kit I n stallation Gu i de 07/ 01/0 6 R ev 1. 0 Pag e 3 o f 1 3 Hardware Inst allation Ste p De tail 1. The fol lowing inst r uctions assume that your equipment rack ut il i zes caged nuts. If you rack has pre- tapped holes t here will be no need to incl ude the caged nuts and t he size of the mounti ng bolt s may vary fr om that descr ib[...]

  • Page 4

    RFT2 Rack Kit I n stallation Gu i de 07/ 01/0 6 R ev 1. 0 Pag e 4 o f 1 3 Ste p De tail 3. Remove t he slides fr o m t he tr ay assembly. The sli des come shipped att ached to the tray assemb l y, the out er slide mem ber s must be removed t o be proper ly inst alled int o the rack. To remove t he out er sli de members, f ull y ext end both slides [...]

  • Page 5

    RFT2 Rack Kit I n stallation Gu i de 07/ 01/0 6 R ev 1. 0 Pag e 5 o f 1 3 Ste p De tail 6. A tta ch the le ft s lid e ra il a ss emb ly to th e rack mounti ng rail by usi ng (4) #10-32 x  ” screw s f o r the fr ont and rear slide m ounti ng brackets. 7. Repeat for t he ri ght sli de rail assem bl y. 8. Ext end the slides from the r ack. 9. I n[...]

  • Page 6

    RFT2 Rack Kit I n stallation Gu i de 07/ 01/0 6 R ev 1. 0 Pag e 6 o f 1 3 Cabl e Mana geme nt Ins talla tio n 1. W it h the RFT i nst alled, go to the back of t he r ack t o inst all the cabl e m anagem ent system. 2. Att ach Par t A to par t extension of out e r m ember on the l eft sli de. 3. Connect Part B t o t he insi de right hand si de slide[...]

  • Page 7

    RFT2 Rack Kit I n stallation Gu i de 07/ 01/0 6 R ev 1. 0 Pag e 7 o f 1 3 Conne cti ng your LCD/ Ke yboar d Step De tail ! No te : Before connect ing the LCD monitor/keyboard t o a KVM o r Server , all systems shoul d be turned off . 1. The keyboard and t rackba ll’s d es ign a llows it to be u se d wi th mo st Su n systems. The RFT2 comes wit h [...]

  • Page 8

    RFT2 Rack Kit I n stallation Gu i de 07/ 01/0 6 R ev 1. 0 Pag e 8 o f 1 3 Operatin g t he LCD/Keyb oard NOTE: It is important to ens ure that the monitor is connected and powered on prior to po wering up the conn ected server and/or KVM. Powering up the KVM then the ser ver last will with s ome servers allow t he video c ard and mon ito r to se lf [...]

  • Page 9

    RFT2 Rack Kit I n stallation Gu i de 07/ 01/0 6 R ev 1. 0 Pag e 9 o f 1 3 Navi gating the Me nu (Th e OSD C ontr ols may be loca te d on th e bac k or th e top of the LCD he ad ) Although no t required, you can make numerous adjustments to your monitor using the o n-screen menu. To access the OSD (On- Screen Display) menu Press the M E NU button lo[...]

  • Page 10

    RFT2 Rack Kit I n stallation Gu i de 07/ 01 /0 6 R ev 1.0 Pag e 10 of 1 3 O n-S c re en Di spl a y (O SD ) Me nus The men u pages c an be displayed by pressin g the Me nu button. No t all me nu func tions can be adjust ed. ( Menu items or layou t may change wi thout no t ice) Picture: Controls for Picture Quali ty (mos t of these settings are optim[...]

  • Page 11

    RFT2 Rack Kit I n stallation Gu i de 07/ 01 /0 6 R ev 1.0 Pag e 11 of 1 3 Troubl e Shooti ng Ba d Ima ge Quali ty Image q uali ty prob lems (b l u rry char acters, distorted i m ages, etc) are us ually caused by o ne of the fo llow in g: The graph ics c ard is ru nn ing at the w rong res olution f or th e LCD mon itor : The monitor optima ll y runs[...]

  • Page 12

    RFT2 Rack Kit I n stallation Gu i de 07/ 01 /0 6 R ev 1.0 Pag e 12 of 1 3 S p e c i f i c a t i o n s Ge ne ral Co mpa tibi li ty Keyboard Type 6 and Type 7 USB Port s USB 1.1 and 2. 0 Rack 4 Post EI A Systems Solar is – SPARC LCD Panel Speci ficati ons LCD Nati ve (Pi xel) Resoluti on 1280x1024 Prot ective Coveri ng 2mm st r engthened gl ass Key[...]

  • Page 13

    RFT2 Rack Kit I n stallation Gu i de 07/ 01 /0 6 R ev 1.0 Pag e 13 of 1 3 Warra nt y Neuro Logic Systems warrants to the original ret ail purchaser that this pro duct is and wil l be fre e fro m defects i n materials and workmanship for a period o f 24 months fr om the da te of purchas e. During the w arranty period, purchaser must pro mptly call N[...]