Paradyne 1900 manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Paradyne 1900, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Paradyne 1900 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Paradyne 1900. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Paradyne 1900 should contain:
- informations concerning technical data of Paradyne 1900
- name of the manufacturer and a year of construction of the Paradyne 1900 item
- rules of operation, control and maintenance of the Paradyne 1900 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Paradyne 1900 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Paradyne 1900, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Paradyne service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Paradyne 1900.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Paradyne 1900 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    BitStorm ™ 1900 IP DSLAM Install ati on and Mai nte nanc e Gu ide Docume nt No. 1900-A2 -GN20-00 J u ly 20 02[...]

  • Page 2

    A July 2002 1900-A2-G N20-00 Copyright © 2002 Par adyne Corpo ration. All ri ght s reserve d . Prin te d in U .S.A . Notice This pu blic ation is protec ted by f edera l cop yright la w . No part of this pu blic ation ma y be cop ied or dis tribut ed, tra nsmit ted, tr ansc ribed, store d in a re trie v al sy stem , or tra nslate d into a ny huma [...]

  • Page 3

    1900-A2-G N20-00 July 2002 B Import ant Safety I nstruc tions 1. Read a nd f ollow all warning n otices an d instructions ma rked on the p roduct or i ncluded in the manual . 2. All inst allation and se r vice must be perf ormed by qu alified service perso nnel, a s openin g or remo ving cov ers ma y e x pose y ou to dange rous high vo ltage points[...]

  • Page 4

    C July 2002 1900-A2-G N20-00 EMI Notices UNITED ST A TES – EMI NOTI CE: This equi pment has been tes ted and found to comply with the limits for a Class A dig ital de vice, pur suant to P ar t 15 of the FCC ru les. These limits are designed to pro vide reasonab le pro tection against ha rmful interf erence w hen the eq uipment is op erated in a c[...]

  • Page 5

    1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide i T able of Content s About This Do cument Focus an d A u d i e n c e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix Relat ed Doc um ents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix Conv entio ns . . . . . . . . . . [...]

  • Page 6

    Table of Contents ii Bi tStorm 1900 Installat ion an d Mainten ance Gu ide 1900- A2-GN20-00 10 Mbps CO Modem Card Specifications . . . . . . . . . . . . . . . . . . . . 1-11 10306 CO Modem Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-11 Special Featur es . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .[...]

  • Page 7

    Table of Contents 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide iii Task 024: Confi gurin g th e MIU . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7 2 Task 025: Configuring Remot e Man agement . . . . . . . . . . . . . . . . 2-87 Task 02 6: Tes ting the BitSto rm 1900 I nstallat ion . . . . . . . . . . . . . 2-96 Ta[...]

  • Page 8

    Table of Contents iv BitStorm 19 00 Instal lation and Main tenance Guide 1900- A2-GN20-00 Appendix B. Cabling Sp ecifications Cable Connections and Specif icat ions . . . . . . . . . . . . . . . . . . . . .B-115 10306 Modem Card Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-116 10224 Modem Card Cabling . . . . . . . . . . . . . [...]

  • Page 9

    1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide v List of Figures Figure 1-1: BitStor m 1900 She lf with Cards and Compo nents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 Figure 1-2: BitStor m 1900 with 10306 Mode m Cards (Part #: 01 -00153-01) . . . . . . . . . . . . . . . . . . . . 1-1 2 Figure 1-3: 10[...]

  • Page 10

    List o f Figu res vi BitStorm 19 00 Inst allation and Main tenance G uide 1900- A2-GN20-00 Figure 2-21 : Voice/D ata System Te st Points . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-97 Figure 2-22 : Data-only System Te st Points . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [...]

  • Page 11

    1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide vii List of T ables Table 1-1: CO Modem Car d LEDs .. ................... ............. ................... .................... ............. ............ ....... .. 1- 6 Table 1-2: Sa me Card B roadcast Fe ature Ena bled/Disabled Fu nction fo r CO Modems ................. ......[...]

  • Page 12

    List o f Tabl es viii BitStorm 19 00 Inst allation and Main tenance G uide 1900- A2-GN20-00[...]

  • Page 13

    1900-A2-G N20-00 BitStorm 1900 Inst allation and Ma intenance Gui de ix About This Document Focus and Audience This document c ontains the complete installation and ma intenance procedures for the BitStorm™ 1900 IP DSL Access Multiplexer (IP DSLAM) system. It is intended for installation technicians responsible for installing and maintaini ng the[...]

  • Page 14

    About This Docu ment x BitStorm 1900 Inst allation and Ma intenance Gui de 1900- A2-GN20-00 • 08-01019-01, S tormT racker – Spe ctrum Manager User Guide This document covers spectral compati b ility and debug/monitor functionality . Conventions The following conventions have been used in preparing this documentation. Safety Labels Throughout th[...]

  • Page 15

    Abou t This D ocume nt 1900-A2-G N20-00 BitStorm 1900 Inst allation and Ma intenance Gui de xi Software S teps and Procedures • T ext you are required to type or enter will appear in the document as follows: <ENTER> , Name , <Tab> , programssevenaa1 • T ext displayed on a computer screen will a ppear as follows: “From the HyperT[...]

  • Page 16

    About This Docu ment xii BitStorm 1900 Inst allation and Ma intenance Gui de 1900- A2-GN20-00[...]

  • Page 17

    1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-1 1. BitS torm 1900 IP DSLAM Introduction The BitS torm 1900 utilizes patented EtherLoop TM Intelligent Ethernet technology to provide a robust platform that supports lifeline Plain Old T elephone Service (POTS) in additi on to a variety of new revenue- generating services rangin[...]

  • Page 18

    1. BitStorm 1900 IP DSLAM 1-2 BitStorm 1900 I nstallati on and Ma intenance Gui de 1900- A2-GN20-0 0 Figure 1- 1: BitStorm 1900 Shelf with Car ds and Co mponents BitS torm 1900 Shel f The BitS torm 1900 Shelf supports 60 to 240 EtherLoop lines. Each BS1900 Shelf contains 13 card slots housing the following circuit packs: • T en (1 0) BitS torm Mu[...]

  • Page 19

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-3 The BitS torm 1900 shelf and component s are installed in a standard 19” rack and can be installed in 23” racks using optional 23” mounting ears. Up to five (5) BS1900 Systems can be installed into one rack depending on the application and the a[...]

  • Page 20

    1. BitStorm 1900 IP DSLAM 1-4 BitStorm 1900 I nstallati on and Ma intenance Gui de 1900- A2-GN20-0 0 The following table provides information on some common configurations and the number of Filter Shelves required for e ach instal lation. Filter 66 -Block Opt ion The Filter 66-Block provides the same POTS s plitter function as the Filter Shelf; how[...]

  • Page 21

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-5 The following table compares the number of BS1900 systems that can be installed into a standard 7’ rack using the Filter Shelf or Filter 66- Block options: The remainder of this chapter covers fe atures of the BitStorm S ystem and the CO modem card [...]

  • Page 22

    1. BitStorm 1900 IP DSLAM 1-6 BitStorm 1900 I nstallati on and Ma intenance Gui de 1900- A2-GN20-0 0 CO Modem Cards One BitS torm 1900 shelf supports up to 10 modem cards. Each CO modem card controls the StormPort CPE modems, directing data traffic flow between the CPE modems and the data network. The following CO modem cards are available: • 103[...]

  • Page 23

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-7 computer ’ s MAC addre ss is entered into the Privacy Management filter table. NOTE: Crea ting a filt er table on a 10224 CO modem affects all EtherLoop port s on that card and one of its CPEs is redund ant , but possible. However , the CO t able sh[...]

  • Page 24

    1. BitStorm 1900 IP DSLAM 1-8 BitStorm 1900 I nstallati on and Ma intenance Gui de 1900- A2-GN20-0 0 Spectrum Manager ADSL Protect The Spectrum Manager software makes EtherLoop spectrally compatible with asymm etrical services suc h as ADSL and G .Lite, detecting and protecting against interf erence within the same binder . In addition, EtherLoop i[...]

  • Page 25

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-9 Passes VLAN T agged Frames The BitS torm 1900 is capable of passing 802.1Q tagged Ethernet frames of 1522 bytes. T o implement a VLAN solution, a 802.1Q tagging switch must exist upstream. Also, an 802.1Q tagging switch or device must be present on th[...]

  • Page 26

    1. BitStorm 1900 IP DSLAM 1-10 BitStorm 19 00 Inst allation and Main tenanc e Guide 19 00-A2-GN20-00 Mixing CO Modem Cards It is possible to fill a BitS torm 1900 shelf with different modem cards (i.e., five 10306 CO modem cards, and five 10224 CO modem cards). For the 10306 CO modem cards, Spectrum Manager includes a V ideo Protect mode that prote[...]

  • Page 27

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-11 10 Mbps C O Modem C ard Specifications 10306 CO Modem Card The 10306 CO modem card provides six EtherLoop lines, each with its own dedicated 10 Mbps modem. Special Features • Same Card Broadcast • Spectrum Manager – ADSL Protect • Spectrum Ma[...]

  • Page 28

    1. BitStorm 1900 IP DSLAM 1-12 BitStorm 19 00 Inst allation and Main tenanc e Guide 19 00-A2-GN20-00 Figure 1-2: BitStorm 1900 w ith 10306 Modem Card s (Part #: 01-00153 -01) 02-17163 10306 CO Modem Specifications Description Specification Shelf Interface 100Base-T Ethernet Bus WAN Inte r f a c e MIU Line Interface 35-pin Omni Grid connector Heat D[...]

  • Page 29

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-13 T able 1-3: System Po wer Spe cifications with 1030 6 CO Mode m * Configuration as sumes 10 mo dem cards are u sed. 10306 CO Modem IP Multicast Operation An optional feature of the 10306 CO modem card is the ability to pass IP Multicast traf fic only[...]

  • Page 30

    1. BitStorm 1900 IP DSLAM 1-14 BitStorm 19 00 Inst allation and Main tenanc e Guide 19 00-A2-GN20-00 Figure 1 -3: 10306 IP Multicas t Operatio n 02-17164[...]

  • Page 31

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-15 The 10306 IP Multicast Operation works in the following manner: 1. The client issues an IGMP Jo in Request (Uns olicited report) Layer 2 broadcast. 2. The 10306 modem listens for any IGMP packets (IGMP snooping) and maintains a table mapping the IP M[...]

  • Page 32

    1. BitStorm 1900 IP DSLAM 1-16 BitStorm 19 00 Inst allation and Main tenanc e Guide 19 00-A2-GN20-00 10224 CO Modem Card The 10224 CO modem card provides 24 statistically multiplexed EtherLoop lines; 12 per single 10 Mbps modem. NOTE: The 10224 is r ecommende d for use on l oops up to 6000’ lo ng. ! W ARNING: POSSIBLE EQUIP MENT DAMAGE! T o compl[...]

  • Page 33

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-17 Figure 1-4: BitStorm 1900 w ith 10224 Modem Card s (Part #: 01-00164 -01) 02-17165 10224 CO Modem Specifications Description Specification Shelf Interface 10 0Base-T Et hernet Bus WAN Inte rfac e MIU Line Interface Dual 35-pin Omni Grid connector Hea[...]

  • Page 34

    1. BitStorm 1900 IP DSLAM 1-18 BitStorm 19 00 Inst allation and Main tenanc e Guide 19 00-A2-GN20-00 T able 1-4: System Po wer Spe cifications with 1022 4 CO Mode m * Configuration as sumes 10 mo dems cards are us ed. Power Bit S torm 190 0 Configuration Mo dem Cards # Lines Power (W atts) Wa t ts Per Line Wa t ts w/Fan T ray Max Current DC 260 W D[...]

  • Page 35

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-19 W AN Interface Card Specifications The BitS torm 1900 system supports the MIU (Management Interf ace Unit) W AN interface. MIU (Management Interfac e Unit) The MIU is the recommended W AN interface for the BitS torm 1900. Seated ne xt to the modem ca[...]

  • Page 36

    1. BitStorm 1900 IP DSLAM 1-20 BitStorm 19 00 Inst allation and Main tenanc e Guide 19 00-A2-GN20-00 Figure 1-5: BitStorm 1900 w ith MIU (Par t #: 01-00 075-01) an d 10306 CO Modems 02-17166 RS-232 RJ11 Craft Interf ace Po r t Ethernet P ass-Thr u Management WA N Po r t 10Base T -X Crossed Inactive P or t Uncrossed MIU CO Modem Specifications Descr[...]

  • Page 37

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-21 Figure 1-6: MIU Data Connection BITST RM SERVER BitStorm ™ Ser ver Software Applications Site Manager Spectrum Manager Etc. Modem Cards TCP/IP *Server can be co-located or remote IP Address Mode-X Daemon SNMP POWER RE ADY 100Mb/s LINK /A CT LINK /A[...]

  • Page 38

    1. BitStorm 1900 IP DSLAM 1-22 BitStorm 19 00 Inst allation and Main tenanc e Guide 19 00-A2-GN20-00 Power Card Specifications The power cards convert the power f eeds to the +12, +5, +3.3, -5 and +2.5 V DC power levels used by the BitS torm 1900 components. 260 W DC The 260 W DC power card conve rts the -48 V DC power feed to the power levels used[...]

  • Page 39

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-23 Figure 1-7: 260 W DC Power Card (Par t #: 01-00 080-01) 02-17168 260 W DC Power Card Specifications Description Specification Card Dimensions 12” x 2.27” x 1 1.75” LEDs -48V , DC Power , S upply Alarm, Fuse Alarm Input -48V DC (Refer to T able [...]

  • Page 40

    1. BitStorm 1900 IP DSLAM 1-24 BitStorm 19 00 Inst allation and Main tenanc e Guide 19 00-A2-GN20-00 260 W AC The 260 W AC power card conve rts the 1 10/220 V AC power feed to the power levels used by the 10603 and 10224 CO modem cards and the MIU. Application: Required with 10306 and 10224 CO modem cards with AC power supply .[...]

  • Page 41

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-25 Figure 1-8: 260 W AC Power Card (Par t #: 01-00 079-01) 02-17169 ON/OFF FUSE (3A, 250V A C) 260 W AC P ower Card Specifications Description Specification Card Dimensions 12” x 2.27” x 1 1. 75” LEDs 12V DC, 5 V DC, 3.3V DC,-5 V DC Input 85 – 2[...]

  • Page 42

    1. BitStorm 1900 IP DSLAM 1-26 BitStorm 19 00 Inst allation and Main tenanc e Guide 19 00-A2-GN20-00 Fan T ray Specifications The -48V DC fan tray and the 1 10/220V AC (switch selectable) fan tray are used with the BitS torm 1900 in EtherLoop applications to provide forced-air cooling in each chassis. A fan tray is re q u i re d under each chassis [...]

  • Page 43

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-27 T able 1-5: Power S pecificatio ns for the AC Fan Tray ! W ARNING: POSSIBLE EQUIP MENT DAMAGE! AC Fan T rays a re shipped w ith an ai r filter frame . T o ensure p roper airflow, the frame mus t be inst alled. DO NOT install an air filter fo r the AC[...]

  • Page 44

    1. BitStorm 1900 IP DSLAM 1-28 BitStorm 19 00 Inst allation and Main tenanc e Guide 19 00-A2-GN20-00 Fan T r ay -48 V DC Figur e 1-10: Fan Tray -48 V DC (P art #: 01-000 84-01) T able 1-6: Power S pecificatio ns for the DC Fan Tray A udible Alarm F an F ailure LEDs ON/OFF 02-17171 Fan T ra y -48 V D C Specifications Operatin g T emperatu re 0 o C t[...]

  • Page 45

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-29 Low-Pass Filter Specif icati ons Filter Shelf Low-Pass filters are used with the BitS torm 1900 in EtherLoop applications where voic e service is require d. The low-pass filter cards separate out-of-voiceband signals from the voiceband traffic betwee[...]

  • Page 46

    1. BitStorm 1900 IP DSLAM 1-30 BitStorm 19 00 Inst allation and Main tenanc e Guide 19 00-A2-GN20-00 Figure 1 -1 1: Filt er She lf (Filter S helf Part #: 01-200 29-01, Filter Card Par t #: 01-2 0029-01, an d Filter 66-Block P art #: 05- 00021-01 ) *Back P anel F ront P anel Filter 66-Block 02-17172 Filter Shelf Specifications Shel f Dimensi ons 5.2[...]

  • Page 47

    1. BitStorm 1 900 IP DSLAM 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 1-31 BitS torm 1900 Compon ent Requirements T able 1-7, “BitS torm 1900 Component Requir e ments,” provides the basic requirements for eac h component within the shelf. T able 1-7: BitSto rm 1900 Component Requirements Part Number Shelf Component s 1 [...]

  • Page 48

    1. BitStorm 1900 IP DSLAM 1-32 BitStorm 19 00 Inst allation and Main tenanc e Guide 19 00-A2-GN20-00[...]

  • Page 49

    1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-33 2. BitS torm 1900 Inst allation and T esting The BitS torm 1900 provides EtherLoop CO modems, which communica te with the remote S tormPort CPE modems instal led at the customer premises. Installing the BitStorm 1900 consists of the following: • Installing the BitS torm shel[...]

  • Page 50

    2. Bit Storm 1900 Installati on and Testing 2-34 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 Installation Flow chart Figur e 2-1, "BitS torm 1900 Installation Flowchart." provides a visual flowchart of the BitStorm 1900 inst allation process as a referenc e tool. Figure 2- 1: BitStorm 1900 I nstallation Flowchar [...]

  • Page 51

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-35 Inst allation T ask Lis t The following is a complete list of a ll tasks to perform . T o install the BitS torm 1900 complete each task in the order given. Installing the BitS torm 1900 The following tasks and procedures have been pr[...]

  • Page 52

    2. Bit Storm 1900 Installati on and Testing 2-36 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 T a sk 00 1: Pre-Inst allation Che cklist Before installing the BitS torm 1900 system, verify that the following steps have been completed: S tep Procedure 1.) Perfor m site sur vey and ver ify equ ipment bay s are ins talled cor r[...]

  • Page 53

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-37 S tep Procedure (continued) 5.) V erify a ll necessar y BS 1900 s ystem comp onents, hardwar e, circuit pac ks, and c ables are at the ins tallation site a nd that they are in g ood conditio n. If a M aterials L ist is pro vided, ver[...]

  • Page 54

    2. Bit Storm 1900 Installati on and Testing 2-38 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 T a sk 00 2: Inst alling the 19” Fan T ra y The 19" fan tray is necessary for a cha ssis housing one or more 10306 or 10224 CO modem cards. The fan tray is installed under each BS1900 shelf and contains six forced-air coolin[...]

  • Page 55

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-39 S tep Procedure (continued) Figure 2-2: Fan Tray Mounting 2.) Connect po wer for -4 8 V DC. (If you are installing a n AC fan tray , proceed to step 3 to connec t power for t he 1 10 V AC fan tray .) a.) The - 48 V DC connecti on req[...]

  • Page 56

    2. Bit Storm 1900 Installati on and Testing 2-40 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) Figure 2-3: -48 V DC Fan Tray 3.) Connect po wer for the 1 10/2 20 V AC fan tray . a.) Conne ct the powe r cord to the IEC te rminal connecti on on the front panel. b.) Route the o ther end to a ground e[...]

  • Page 57

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-41 S tep Procedure (continued) 4.) Install the a ir filter f rame. a.) The fi lter mus t be remo ved. b.) Slide th e frame i nto place . 5.) Install the air fi lter for th e DC fan tray . ( DO NOT insta ll a filter in the AC fan tray). [...]

  • Page 58

    2. Bit Storm 1900 Installati on and Testing 2-42 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 T a sk 00 3: Inst alling the BS1900 and Filte r She lves Use this procedure to install the BitS torm 1900 modem shelf and filter shelf. NOTE: The filter shelf is not required in data-only applications. Requirements This procedure r[...]

  • Page 59

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-43 S tep Procedure 1.) Select a nd appl y grounded anti-sta tic pro tection. 2.) Select t he moun ting poin t in the bay where th e top holes of the shelf mo unting fla nges wi ll be attach ed. 3.) Align th e holes o f the sh elf mounti[...]

  • Page 60

    2. Bit Storm 1900 Installati on and Testing 2-44 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 Figure 2-5: BitS torm 1900 Modem Shelves Mounted in Bay 4.) Using th e shelf mounting screws prov ided in the she lf hardwa re kit, fasten the left and rig ht flanges to the bay as shown in Figure 2- 6, "Bit Storm 1900 Shelf F[...]

  • Page 61

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-45 S tep Procedure (continued) Figure 2- 6: BitStorm 1900 S helf Fasten ed to Bay 5.) Procee d accordi ng to the fol lowing tab le: If the applica tion is Then V oi ce/da ta A lign a nd moun t a fi lte r shel f di rect ly above the Bit-[...]

  • Page 62

    2. Bit Storm 1900 Installati on and Testing 2-46 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) Figure 2-7: Filter Shelf Mounting in Bay ST OP < RXKDY HFRPSO HWHGW KLVWDVN Filter Shelf 5.25" x 17.5" x 11.75" BS1900 Shelf 12.1875" x 17.5" x 12" Mid-Mou[...]

  • Page 63

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-47 T a sk 00 4: Inst alling the Air Baffle Use this procedure to install the BitS torm 1900 Air Baffle. Requirements This procedure requires the following: • Phillip s-head scre wdriver (#1 or #2) S tep Procedure 1.) V erify th at the[...]

  • Page 64

    2. Bit Storm 1900 Installati on and Testing 2-48 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 T a sk 00 5: Inst alling the Circuit Packs Use this procedure to install the BitS torm 1900 circuit packs. Requirements This procedure requires the following: • Grounded anti-static protection S tep Procedure 1.) Place a nti-stat[...]

  • Page 65

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-49 T a sk 006: Connecting Power to the Shelf Use this procedure to install the power feeds from a -48 V DC or 1 10 V AC power source to the BitStorm 1900 modem sh elf. NOTE: The filter sh elf does not req uire a power fe ed. Requirement[...]

  • Page 66

    2. Bit Storm 1900 Installati on and Testing 2-50 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) 3.) With the p ower suppl y turned OFF , c onnect th e -48 V DC (260W) or 1 10 V AC ( 260W) powe r source accord ing to the f ollowing table and Fig ure 2-8, "T ypi cal DC Pow er Harness Con nection[...]

  • Page 67

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-51 S tep Procedure (continued) Figure 2-8: Typical DC Power Harness C onnection to -48 V DC ( 260W) P ower Sou rce 4.) For a -48 V DC power s ource, con nect the red power lea d to the Negative (-) term inal connec tion and t he black p[...]

  • Page 68

    2. Bit Storm 1900 Installati on and Testing 2-52 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) NOTE: The redundant pow er supply sourc es connect to two pairs of wires on the BitStorm 190 0’s power ha rness and are electrically the same. 5.) Route the ot her end o f the DC power harness to the D[...]

  • Page 69

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-53 S tep Procedure (continued) 9.) Secu re the pow er harne ss in acc ordance with l ocal office procedu res. 10.) Turn ON the power to the sh elf from t he power sup ply . ST OP < RXKDY HFRPSO HWHGW KLVWDVN[...]

  • Page 70

    2. Bit Storm 1900 Installati on and Testing 2-54 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 T a sk 007: Inst alling the Dat a Network C onnection with an MIU Use this procedure to connect the BitStorm 1900 to the Ethernet data network using an MIU. Requirements This procedure requires the following: • Ethernet data ne t[...]

  • Page 71

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-55 S tep Procedure (continued) Figure 2- 10 shows a typical EtherLoo p data network c onnection with the B itS tor m 1900 us ing an MIU . Figure 2- 10: BitStorm 1900 D ata Connectio n via M IU BitStor m™ 1900 BitStor m ™ Ser v er PO[...]

  • Page 72

    2. Bit Storm 1900 Installati on and Testing 2-56 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) 2.) Connect t he 50-pi n connector to the Ethernet Pass- Thru por t, then conne ct the ca bles at th e other en d to the correspo nding switch (e s). Refer t o Figur e 2-1 1 (shown below). 3.) Connect th[...]

  • Page 73

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-57 S tep Procedure (continued) 5.) Procee d accordi ng to the fol lowing tab le: ST OP < RXKDY HFRPSO HWHGW KLVWDVN If the application is Then Vo i c e / d a t a GO TO: "T ask 0 08: Inst alling V oice/Dat a & [...]

  • Page 74

    2. Bit Storm 1900 Installati on and Testing 2-58 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 T a sk 008: Inst alling V oice/Dat a & Filter Shelf Connections Use this procedure to connect the BitStorm 1900 to the EtherLoop cross-connect in voice/data applications. Requirements This procedure requires the following tools[...]

  • Page 75

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-59 S tep Procedure (continued) T able 2-2: P in and Pair Assignmen ts for the Champ to Omni G rid Cable (P art #: 04-00 007-10) From Con n From Pin # With Pair # Color Code To To Pin # From Conn From Pin # With Pair # Color Code To To P[...]

  • Page 76

    2. Bit Storm 1900 Installati on and Testing 2-60 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) 4.) Connect on e Amp-Ch amp conne ctor of a n interme diate cab le to the "Line /CPE" s ide of the E therLoop cross- connect b lock, th en connect the othe r end to a n Amp-Champ to Dual Om ni [...]

  • Page 77

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-61 S tep Procedure (continued) Figure 2-12: Line/CPE and V oice Connections on the Filter Shelf for 10306 Modem Cards Interconnect Cable #1 IN *Not Used Dial T one IN from PBX/PSTN EtherLoop from BitStorm shelf Dial T one & EtherLoo[...]

  • Page 78

    2. Bit Storm 1900 Installati on and Testing 2-62 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) Figure 2-13: Line/CPE and V oice Connections on the Filter Shelf for 10224 Modem Cards Interconnect Cable #1 IN *Not Used Dial T one IN from PBX/PSTN EtherLoop from BitStorm shelf Dial T one & EtherL[...]

  • Page 79

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-63 S tep Procedure (continued) 8.) Go to "T ask 01 1: I nstalling E xternal Voice Swit ch Conn ections, on page 70." ST OP < RXKDY HFRPSO HWHGW KLVWDVN[...]

  • Page 80

    2. Bit Storm 1900 Installati on and Testing 2-64 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 T a sk 009: Inst alling V oice/Dat a w/Filter 66-Block Connections Use this procedure to connect the BitStorm 1900 to the EtherLoop cross-connect in applications where voice /data service is required with a Filter 66-Block. Require[...]

  • Page 81

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-65 S tep Procedure (continued) Figure 2- 14: Voice/Data Filter 66 -Block Conn ections fo r 10306 CO Modems *Not Used Amp Champ to Dual Omni Grid Cable par t # 04-00007-10 Amp Champ to Dual Amp Champ Cable par t # 04-00029-01 J1 J2 J1 J2[...]

  • Page 82

    2. Bit Storm 1900 Installati on and Testing 2-66 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) Figure 2- 15: Voice/Data Filter 66 -Block Conn ections fo r 10224 CO Modems ST OP < RXKDY HFRPSO HWHGW KLVWDVN *Not Used J1 J2 Amp Champ to Dual Omni Grid Cable par t # 04-00007-10 02-1[...]

  • Page 83

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-67 T a sk 01 0: Inst alling the Dat a -only Connections Use this procedure to connect the BitStorm 1900 to the EtherLoop cross-connect in applications wh ere no voice service is required. Requirements This procedure requires the followi[...]

  • Page 84

    2. Bit Storm 1900 Installati on and Testing 2-68 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) Figure 2- 17, "D ata-only Conn ections on th e 66-Bl ock for 1022 4 CO Modem Car ds," on page 69 . Record th e EtherL oop assignm ents. Figure 2- 16: Data- only Connect ions on the 66-Block f o[...]

  • Page 85

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-69 S tep Procedure (continued) Figure 2- 17: Data- only Connect ions on the 66-Block f or 10224 CO Modem Card s ST OP < RXKDY HFRPSO HWHGW KLVWDVN *Not Used J1 J2 Amp Champ to Dual Omni Grid Cable par t # 04-00007-10 M[...]

  • Page 86

    2. Bit Storm 1900 Installati on and Testing 2-70 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 T ask 01 1: Inst alling External V oice Switch Connections Use this procedure to connect the BitStorm 1900 lines to an external voice fac ility . Requirements This procedure requires the following tools and materials: • 24 jumper[...]

  • Page 87

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-71 S tep Procedure (continued) 8.) Record t he EtherL oop cross -connect Tip/Ring as signments fo r the voice f acili ty accor ding to local office proced ures. ST OP < RXKDY HFRPSO HWHGW KLVWDVN[...]

  • Page 88

    2. Bit Storm 1900 Installati on and Testing 2-72 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 T a sk 01 2: Configuring the MIU Complete the following steps to configure the MIU. S tep Procedure 1.) Ensure that the Bi tS tor m 1900 is powered on. 2.) V erify th e PC has a n ASCII term inal emul ator loaded (i.e., Hyper termi[...]

  • Page 89

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-73 S tep Procedure (continued) Figure 2-18: Craft Connection with the MIU Craft Cable MIU Card CRAFT Connection MIU Craft Cab le (DB-9 with RJ-11 to RS-232 adapter) Craft T er minal 02-17190[...]

  • Page 90

    2. Bit Storm 1900 Installati on and Testing 2-74 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) 4.) Set the s erial COM1 port termi nal communi cation s ettings. a.) Initi ate a T erminal Ses sion using terminal em ulation s oftware (i.e., Hyper termin al). b.) Select the approp riate s erial COM p[...]

  • Page 91

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-75 S tep Procedure (continued) 5.) The Craft Interface Login screen d ispl ays. T ype admin for the default Username and press <Enter> . NOTE: The Craft Interfac e is case-sensiti ve. Make sure to ty pe all entries in lowercase. T[...]

  • Page 92

    2. Bit Storm 1900 Installati on and Testing 2-76 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) The BS1900MIU>> promp t disp lays: 7.) For lis t of all avai lable CLI comma nds, type help a t the BS1900MIU>> promp t and press <Enter> . This scree n provid es a list of th e availab[...]

  • Page 93

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-77 DA TE Enter to ch ange the d a te. HELP Enter to ob tain addition al hel p IFCONF IG Use to co nfigure the MIU I.P . Address, Sub net Ma sk, S tatus, Default G ateway etc . MENU Enter to view the M ain Menu fo r the interface. T able[...]

  • Page 94

    2. Bit Storm 1900 Installati on and Testing 2-78 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 PING Enter to ve rify if an I.P . Address is va lid. RESET Use to Rese t or Reboot t he system. (It is no t ad vi se d to power down the s ys tem i n o rde r to per form a rese t of the sy stem.) SNMP Ente r to review and/or mod if[...]

  • Page 95

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-79 S tep Procedure (continued) 8.) T ype menu at the BS 1900MIU >> prompt. The BitStorm 1900 MIU Craft Interface Main Menu displ a ys. 9.) T ype a to select Configuration .[...]

  • Page 96

    2. Bit Storm 1900 Installati on and Testing 2-80 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) 10.) From the Configuration Menu , ty pe a to acce ss the Network Interface Configuration scre en. 11 . ) T ype in the MIU Ethe rnet IP Addres s , MIU Ether net Subnet Mask , MIU Defa ult Gatewa y, and t[...]

  • Page 97

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-81 S tep Procedure (continued) 12.) T y pe c to selec t Set Time-of-Day Clock . The followi ng screen appears: 13.) Enter the cur rent date and time. a.) Ente r the curren t date in th e format M MDDYYYY . [E nter only the numbe rs not [...]

  • Page 98

    2. Bit Storm 1900 Installati on and Testing 2-82 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) b.) After enter ing the 4- digit ye ar , the c ursor wi ll automa tically jump to th e T ime field. (Th is fiel d is not m arked in t his vers ion.) Enter the tim e as HHMMSS (D o not type the colo n (:)[...]

  • Page 99

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-83 S tep Procedure (continued) 15.) T y pe a to select Change Username to modify the user name. Th e followi ng screens displa y:[...]

  • Page 100

    2. Bit Storm 1900 Installati on and Testing 2-84 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) 16.) T ype a new user nam e, then press <Enter> (a confirmat ion will follow in dicating that the user name h as been s aved). Press any key to retu rn to the User Account Administration screen . 1[...]

  • Page 101

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-85 S tep Procedure (continued) 19.) Onc e all of th e configu ration paramete rs are ent ered, the s ystem must be res et for the changes to take effect. T o reset the sys tem, type e to se lect Utilities fr om the Main Menu screen.[...]

  • Page 102

    2. Bit Storm 1900 Installati on and Testing 2-86 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) 20.) T y pe a to selec t Reset System , and then y to confir m. ST OP < RXKDY HFRPSO HWHGW KLVWDVN[...]

  • Page 103

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-87 T a sk 013: Confi guring Re mote Mana ge ment The MIU can be remotely manage d via the management 10Base T -X Ethernet port as shown in Figur e 2-20, "T e lnet Connection for the BitS torm 1900." Figure 2-20: T elnet Connec[...]

  • Page 104

    2. Bit Storm 1900 Installati on and Testing 2-88 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 Using SNMP Network Management Software If the client is using SNMP Network Management Software, our private MIB must be loaded into the user ’ s SNMP Network Manage r using the procedure accompanying th e spec ific Network Manage[...]

  • Page 105

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-89 S tep Procedure (continued) 2.) T ype command in the Open: fiel d and cli ck OK . The DOS prompt di splays : 3.) At t h e DOS prom pt type telnet and th e I.P. Address for the MI U, then press <Enter> . T he Craft Interface Log[...]

  • Page 106

    2. Bit Storm 1900 Installati on and Testing 2-90 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) 4.) T ype admin for the default Username and press <Enter> . NOTE: The Craft Interfac e is case-sensiti ve. Make sure to ty pe all entries in lowercase. 5.) T ype etherloop for the def ault Passwor[...]

  • Page 107

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-91 S tep Procedure (continued) The BS1900MIU>> promp t disp lays: 6.) T ype version to check the curren t firmware ver sion. T o verify this is the lates t version, contact o ur T e chnical Support organiz ation at www .p arad yne[...]

  • Page 108

    2. Bit Storm 1900 Installati on and Testing 2-92 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) 8.) If any of th e inform ation need s to be mo dified, ty pe: ifconfig -m 0 and pr ess <Enter> . 9.) The screen abo ve dis pl ays ind ic ating yo u are connecte d remo tel y to the MIU and asks if[...]

  • Page 109

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-93 S tep Procedure (continued) 11 . ) T o view t he cu rrent SNM P parameter s, type sn mp -L and press <Enter> . 12.) V er ify the corr ect Community Name , Poll Inter vals , and Trap Target Addresses . 13.) T o edit the S NMP co[...]

  • Page 110

    2. Bit Storm 1900 Installati on and Testing 2-94 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) 14.) From th is screen c hanges to the Community Name , Current Poll Interval , and Set Trap Targets can be ma de. Refe r to the fol lowing table as a guid e for thes e settings . If there are no chang e[...]

  • Page 111

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-95 S tep Procedure (continued) 15.) If cha nges to the configur ation hav e been ma de, the system m ust be reset. T ype reset and press <Enter> , then y to confirm. NOTE: When loggi ng back into the MI U, the new IP Address mus t[...]

  • Page 112

    2. Bit Storm 1900 Installati on and Testing 2-96 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 T a sk 01 4: T e sting the BitStorm 1900 Inst allation T esting a BitS torm 1900 installation includes the following tasks: • T esting voice connectivity • T esting data connectivit y • End-to-end connectivity The following s[...]

  • Page 113

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-97 S tep Procedure (continued) Figure 2-21: Voice/Data Sys tem T est Points BitStorm™ 1900 Optional BitStorm ™ Ser ver P O W E R R E A D Y 1 0 0 M b /s L IN K /A C T L I N K /A C T 1 0 0 M b /s 1 0 0 M b / s L I N K /A C T L I N K /[...]

  • Page 114

    2. Bit Storm 1900 Installati on and Testing 2-98 BitStorm 1900 Ins tallat ion and M aintenanc e Guide 1900- A2-GN20-00 S tep Procedure (continued) Figure 2-22: Data-only System T est Points ST OP < RXKDY HFRPSO HWHGW KLVWDVN BitStorm™ 1900 Optional BitStorm ™ Ser ver P O W E R R E A D Y 1 0 0 M b / s L I N K / A C T L I N K /A[...]

  • Page 115

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 19 00 Installation and Main tenance Guide 2-99 T a sk 015: T esting V o ice Connectivity This procedure checks the voice connectivity in BitStorm 1900 voice/ data applications. Requirements The following is required to do this procedure: • External voice facility point-of-prese[...]

  • Page 116

    2. Bit Storm 1900 Installati on and Testing 2-100 BitStorm 19 00 Instal lation and Main tenance Guide 1900-A2-GN 20-00 T a sk 01 6: T e sting Data Connectivity This procedure checks data connectivity from the customer premise distribution frame and the BitS torm 1900 shelf. Requirements A StormPort Modem with power ad apter and extension cord (if n[...]

  • Page 117

    2. BitStorm 190 0 Installation and Testi ng 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide 2-101 T a sk 017: EtherL oop End-to -End T es ting This procedure checks the EtherLoop system installation, including simultaneous voice and data EtherLoop tests from the modem to the voice and data networks. Requirements The EtherLoop e[...]

  • Page 118

    2. Bit Storm 1900 Installati on and Testing 2-102 BitStorm 19 00 Instal lation and Main tenance Guide 1900-A2-GN 20-00 S tep Procedure (continued) NOTE: The browser appli cation must be confi gured for "no proxies." Re fer to “Chapter 3. BitStorm 1900 Ma intenance” on pag e 103 for more information." 7.) In the b rowser app licat[...]

  • Page 119

    1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide 3-103 3. BitS torm 1900 Maintenance This chapter contains guidelines and checklis ts for the ma intenance of the BitS torm 1900 system. Maintenance G uidelines The following factors can cause service problems in an EtherLoop sys- tem instal lation: • Poor wiring conditions • I[...]

  • Page 120

    3. Bit Storm 1900 Mainte nance 3-104 BitStorm 1900 I n stallation and Maintena nce Guide 1900- A2-GN20-00 Cable Connections It is important to ensure that all connections to the EtherLoop system are firmly seated and secured. An incomplete c onnection at any one point could cause the EtherLoop system to malfunction. BitStorm 1900 Equipment Installa[...]

  • Page 121

    3. BitStorm 1900 Maintenan ce 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide 3-105 Maintenance Checklists V oice/Dat a Con nectivity T roubleshooting C hecklist T able 3-1: V oice /Data Connectivity M aintenance in Facility R oom Problem Maintenance Check No vo ice or dat a service • V erify that the corr ect T ip/Ring pa ir[...]

  • Page 122

    3. Bit Storm 1900 Mainte nance 3-106 BitStorm 1900 I n stallation and Maintena nce Guide 1900- A2-GN20-00 End-to-End Maintenance C hecklist T able 3-2: End-to- End Mainten ance Chec klist Problem Check No voice or dat a serv ice • V erify power at all p oints in the system • V erify connectio ns and w iring con dition s at all poi nts V oice bu[...]

  • Page 123

    1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide A-107 Appendix A. Inst allation Requirement s This appendix describes the facili ty requirements for the B itSt orm 1900 shelf and filter shelf. BitS torm 1900 Supp ort Eq uipment Equipment and materials that must be inst alled to s upport the B itS torm 1900 shelf include the fol[...]

  • Page 124

    Appendix A. Instal lation Requiremen ts A-108 BitStorm 19 00 Installation and Main tenanc e Guide 1900-A2-G N20-00 • The bay must be installed and secured in accord ance with standard telecommunications industry practices • Use an Isolation Kit to isolate the bay from building st ructures and outside eleme nts for "in-building" instal[...]

  • Page 125

    Appendix A. Ins tallati on Requireme nts 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide A-109 1 10306 configuration assumes a full chassis consisting of a 260 W att AC Power Card, MIU and 10-10306 CO Cards. 2 10224 configuration assumes a full chassis consisting of a 260 W att AC Power Card, MIU and 10-10224 CO Cards. Fan T r [...]

  • Page 126

    Appendix A. Instal lation Requiremen ts A-110 BitStorm 19 00 Installation and Main tenanc e Guide 1900-A2-G N20-00 (IBN) environment. Either of thes e environments may use a 1/0 A WG ground collector . The following sections of fer gui delines for each of these environments, with and without ground collectors. See local electrical codes or the appr[...]

  • Page 127

    Appendix A. Ins tallati on Requireme nts 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide A-111 Network Support Equipme nt The network support equipment that ma y need to be installed includes the following: • Ethernet 10 Base-T hub port for BitS torm 1900 Hub card connection (one per BitStorm 1900 shelf) • Ethernet 10 Base-[...]

  • Page 128

    Appendix A. Instal lation Requiremen ts A-112 BitStorm 19 00 Installation and Main tenanc e Guide 1900-A2-G N20-00 Inst all ation T ools and Materials The tools and materials required to install the BitS torm 1900 shelf include the following: • 4 bay mounting screws • 1 medium Phillips-head screwdriver • 1 cross-connect block matching the exi[...]

  • Page 129

    Appendix A. Ins tallati on Requireme nts 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide A-113 BitStorm 1900 Physical Characteristic s This section specifies the physical dimensions and weight of the BitS torm 1900 and filter shelves T able A-3, "BitS torm 1900 W eight and Dimensions" includes the shelf weight and dim[...]

  • Page 130

    Appendix A. Instal lation Requiremen ts A-114 BitStorm 19 00 Installation and Main tenanc e Guide 1900-A2-G N20-00 T able A-4: Bi tS torm Opera tional Requireme nts Specification Requir ement Local a rea net work enviro nment Layer 2 Ethernet Power supp ly -48 V DC nomin al -46 to -56 V DC acc eptabl e range or 1 10 V AC Environm ent al Oper ating [...]

  • Page 131

    1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide B-115 Appendix B. Cabling S pecifications This appendix contains the specifica tions for the cabling used with the 10306 and 10224 modem cards in the BitS torm 1900 shelf. The illustrations associated with each of the modem card cabling sections show typical rack layouts. (These c[...]

  • Page 132

    Appendix B. Cabl ing Speci fications B-116 BitSt orm 1900 Install ation and Main tenance G uide 19 00-A2-GN20-0 0 10306 Modem Card Cab ling Refer to Figur e B-1,“Cabling – Filt er Shelf with 10306 Modem Car ds,” on page 1 16 , for the 10306 cable connections us ing a filter shelf and 66-Block. Figur e B-2,“Cabling – Filter 66-Block with 1[...]

  • Page 133

    Appendix B. Ca bling Specif ications 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide B-117 Figure B-2 : Cabling – Filter 66-Blo ck with 1030 6 Modem Car ds 10306 10306 10306 10306 2 RU F AN 2 RU AIR BAFFLE 2 RU F AN 2 RU AIR BAFFLE 2 RU F AN 2 RU AIR BAFFLE 2 RU F AN 2 RU AIR BAFFLE 02-17195 *Only one Filter 66-Block and one [...]

  • Page 134

    Appendix B. Cabl ing Speci fications B-118 BitSt orm 1900 Install ation and Main tenance G uide 19 00-A2-GN20-0 0 10224 Modem Card Cab ling Figur e B-3,“Cabling – Filter Shelf w ith 10224 Modem Car ds,” on page 1 18 , for 10224 cable connections using a filter shelf and 66- Block. Figur e B-4,“Cabling – Filter 66-Block with 10224 Modem Ca[...]

  • Page 135

    Appendix B. Ca bling Specif ications 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide B-119 Figure B-4 : Cabling – Filter 66-Blo ck with 1022 4 Modem Car ds BitStorm 1900 Cable Harness Figur e B-5 (on next page) illustrates the BitS torm 1900 cable assembly (DSUB50P to 10x RJ45). This cable connects the MI U card to the layer [...]

  • Page 136

    Appendix B. Cabl ing Speci fications B-120 BitSt orm 1900 Install ation and Main tenance G uide 19 00-A2-GN20-0 0 Decapus Cable Figure B-5: D ecapus Cab le Connect ions MIU Connector La yer 2/3 Switch Connectors 02-17198 BitStorm™ 1900 Decapus Cable MIU Card 02-17199 POWER RE ADY 100Mb/s LINK /A CT LINK/ A CT 100Mb/s 100Mb/s LINK /A CT LINK/ A CT[...]

  • Page 137

    Appendix B. Ca bling Specif ications 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide B-121 AMP-Champ to Dual AMP C hamp Cable The AMP Champ to Dual AMP Champ cable connects from the Filter 66-Block to an AMP Champ Omni Grid cable, which connects to the 10306 cards. Refer to Figur e B-6 (shown below) and to T able B-1, “AMP-Ch[...]

  • Page 138

    Appendix B. Cabl ing Speci fications B-122 BitSt orm 1900 Install ation and Main tenance G uide 19 00-A2-GN20-0 0 T able B-1: AMP-Champ to Dual AMP-Champ Cable Specifica tions Conn1 Color Code of Cable 1 Conn2 Conn1 Color Code of Cable 2 Conn3 1B L / W 1 1 3 G / B K 1 26 W/BL 26 38 BK/G 26 2O / W 2 1 4 B R / B K 2 27 W/O 27 39 BK /BR 27 3 G/W 3 15 [...]

  • Page 139

    Appendix B. Ca bling Specif ications 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide B-123 AMP Champ to Dual Omni Grid Cable The AMP Cha mp to Dual Omni Grid c able is used to connect th e Filte r Shelf or Filter 66-Block with 10306 and 10224 C O modem cards to the AMP Champ to AMP Champ cable the cross connect. For 10306 and 1[...]

  • Page 140

    Appendix B. Cabl ing Speci fications B-124 BitSt orm 1900 Install ation and Main tenance G uide 19 00-A2-GN20-0 0 T able B-2: AMP C hamp to Dual Omni G rid Cable Specif ications From Conn From Pin # With Pair # Co lor Code To To Pin # From Conn From Pin # With Pair # Color Code To To Pin # J1 B2 R1 BLU/WHT P1 1 J1 A2 T1 WHT/BLU P1 26 E2 R2 OR/WHT 2[...]

  • Page 141

    Appendix B. Ca bling Specif ications 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide B-125 Omni Grid to Dual Omni Grid The Omni Grid to Dual Omni Grid ca ble is used to connect the Filter Shelf to 10306 CO modem cards. Refer to Figur e B-8 (shown below) and T able B-3, “Omni Grid to Dual Omni Grid Cable Specific ations,” on[...]

  • Page 142

    Appendix B. Cabl ing Speci fications B-126 BitSt orm 1900 Install ation and Main tenance G uide 19 00-A2-GN20-0 0 T able B-3: Omni Grid to Dual Omni Grid Ca ble Specifications J3 J2 Color J1 B2 BLU/WHT B2 A2 WHT/BLU A2 E2 OR/WHT E2 D2 WHT/OR D2 B3 GR/WHT B3 A3 WHT/GR A3 E3 BR/WHT E3 D3 WHT/BR D3 B4 GRY/W HT B4 A4 WHT/GR Y A4 E4 BLU/RED E4 D4 RED/BL[...]

  • Page 143

    Appendix B. Ca bling Specif ications 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide B-127 Omni Grid to Omni Grid Cable The omni grid to omni grid cable connects the Filter Shelf to the 10224 CO modem cards. Refer to Figur e B-9 (shown below) and T able B-4, “Omni Grid to Omni Grid Cable Specifications,” on page 128 for cab[...]

  • Page 144

    Appendix B. Cabl ing Speci fications B-128 BitSt orm 1900 Install ation and Main tenance G uide 19 00-A2-GN20-0 0 T able B- 4: Omni G rid to Omni Grid Cable S pecifications From Conn From Pin # Wi th Pair # Color Code To Conn To Pin # From Con n From Pin # With Pair # Color Code To Conn To Pin # J1 A2 T1 WHT/ BLU J2 A2 J1 B2 R1 BLU/ WHT J2 B2 D2 T2[...]

  • Page 145

    Appendix B. Ca bling Specif ications 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide B-129 Intermediate Cable Specifications BitS torm 1900 intermediate (loop extension) cables can be obtained "of f-the-shelf" from a varie ty of vendors, as long as cables chosen meet the following spec ifications: • Category 5 bundl[...]

  • Page 146

    Appendix B. Cabl ing Speci fications B-130 BitSt orm 1900 Install ation and Main tenance G uide 19 00-A2-GN20-0 0 Power Cable Harness Figur e B-1 1 (shown below) illustrates the B itStorm 1900 cabl e harness. The BitS torm 1900 power cable assembly connec ts the DC power source to the BitSt orm 1900 shelf. One BitStorm 1900 power cable harness cont[...]

  • Page 147

    Appendix B. Ca bling Specif ications 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide B-131 ! W ARNING: POSSIBLE EQUIPMENT DAMAGE ! Reversed polarities on the DC power feed can irreparably damage the BitStorm 1900 shelf component s. Be certain power feeds are connected pr operly to the pow er source, with the re d leads connecte[...]

  • Page 148

    Appendix B. Cabl ing Speci fications B-132 BitSt orm 1900 Install ation and Main tenance G uide 19 00-A2-GN20-0 0[...]

  • Page 149

    1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide C-133 Appendix C. Craf t Interface Screens This appendix includes all of the Craft Interfac e screens available fr om the Main Menu. Main Menu Figure C-1: Main Menu[...]

  • Page 150

    Appendix C. Craft In terface Sc reens C-134 BitStorm 1900 I nstallati on and Maintena nce Gui de 1900- A2-GN20-00 Configuration Figure C-2: (A. Configuration) Configuration Menu Figure C- 3: (A. Config uration) A. Network Inter face Configur ation[...]

  • Page 151

    Appendix C. Craft Interface Sc reens 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide C-135 Figure C-4: (A. Configuration) B. SNMP Configuration Menu Figure C-5: (A. Configuration, B. SNMP Configuration Menu) A. SNMP Trap/Polling Parameters[...]

  • Page 152

    Appendix C. Craft In terface Sc reens C-136 BitStorm 1900 I nstallati on and Maintena nce Gui de 1900- A2-GN20-00 Figure C-6: (A. Configuration, B. SNMP Config uration Menu) B. Change SNMP Community Names Figure C-7: (A. Configuration) C. Set T ime-of-Day Clock[...]

  • Page 153

    Appendix C. Craft Interface Sc reens 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide C-137 St atistics Figure C-8: B. Statistics Menu Figure C- 9: (B. Statistics ) A. Network Layer Statistics[...]

  • Page 154

    Appendix C. Craft In terface Sc reens C-138 BitStorm 1900 I nstallati on and Maintena nce Gui de 1900- A2-GN20-00 Figure C- 10: (B. Statistics) B. Physical La yer Statistics Men u Figure C-1 1 : (B. Statistics, B . Physical Lay er Statistics) A. Ethernet Port Statistics[...]

  • Page 155

    Appendix C. Craft Interface Sc reens 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide C-139 Figure C-12 : (B. Statistics, B. P hysical Layer Statistics ) B. I2C Statistics Figure C-13 : (B. Statistics) C. Environ ment Statistics[...]

  • Page 156

    Appendix C. Craft In terface Sc reens C-140 BitStorm 1900 I nstallati on and Maintena nce Gui de 1900- A2-GN20-00 Figure C -14: (B. Statistics) D. System M emory Statistics Figure C-15: (B. St atistics ) E. Shelf Exte nt S tatisti cs[...]

  • Page 157

    Appendix C. Craft Interface Sc reens 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide C-141 Figure C- 16: (B. Statistics) F . S ystem Erro r-Reset Data Figure C- 17: (B. Statistics) G . Mo dex Daemon Run Statistics[...]

  • Page 158

    Appendix C. Craft In terface Sc reens C-142 BitStorm 1900 I nstallati on and Maintena nce Gui de 1900- A2-GN20-00 Firmware V ers ion Information Figure C-18: C. Firmware Ve rsion Information User Account Ad ministration Figure C-19: D. User Account Administration Menu[...]

  • Page 159

    Appendix C. Craft Interface Sc reens 1900-A2-G N20-00 BitStorm 1900 Ins tallation and Ma intenanc e Guide C-143 Figure C-20: (D. User Account Administrati on) A. Change Remote <TELENET> Username Figure C-21: (D. User Account Administration) B. Change Remote <TELENET> Password[...]

  • Page 160

    Appendix C. Craft In terface Sc reens C-144 BitStorm 1900 I nstallati on and Maintena nce Gui de 1900- A2-GN20-00 Utilities Figure C-22: E . Utilities Menu Figure C-23: (E. Utilities) A. Reset Confirmation[...]