Peerless Industries UST-WallArm3 manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Peerless Industries UST-WallArm3, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Peerless Industries UST-WallArm3 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Peerless Industries UST-WallArm3. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Peerless Industries UST-WallArm3 should contain:
- informations concerning technical data of Peerless Industries UST-WallArm3
- name of the manufacturer and a year of construction of the Peerless Industries UST-WallArm3 item
- rules of operation, control and maintenance of the Peerless Industries UST-WallArm3 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Peerless Industries UST-WallArm3 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Peerless Industries UST-WallArm3, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Peerless Industries service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Peerless Industries UST-WallArm3.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Peerless Industries UST-WallArm3 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    Installa tion and Assembl y: DUKANE PR OJECT OR SHORT THR OW WALL ARM Model: UST-WALLARM3 PROJECT OR POSITION FOR 60" - 70" SCREEN SIZE PROJECT OR POSITION FOR 70" - 100" SCREEN SIZE 430-User Guide UST-WALLARM3-00[...]

  • Page 2

    2 of 14 ISSUED:07-25-1 1 SHEET #: 125-9225-1 • DonotbegintoinstallyourPeerlessproductuntilyouhavereadandunderstoodtheinstructionsandwarnings containedinthisInstallationSheet.Ifyouhaveanyquestionsregardinganyoftheinstructionsorwarnings,for?[...]

  • Page 3

    3 of 14 ISSUED:07-25-1 1 SHEET #: 125-9225-1 Some parts may appear slightly different than illustrated. Before you start make sure all parts listed are included with your product. F A E G H I J K B D C N L M PARTS LIST Description Qty. Part # A adapterplateassembly 1 056-2051 B extensionbracket 1 056-2039 C wallarmbracket 1 056-20[...]

  • Page 4

    4 of 14 ISSUED:07-25-1 1 SHEET #: 125-9225-1 W all Plate Location Determineandmarkthetopedgeofthe screenactiveimage. NOTE: Makesuretoleaveadequatespaceabovethe              [...]

  • Page 5

    5 of 14 ISSUED:07-25-1 1 SHEET #: 125-9225-1 Usingwallplate( D )asatemplate,drillfour5/32"(4mm)dia.holestoaminimumdepthof2.5"(64mm). Attach wallplate( D )tocentersofwoodstudsusingfour#14x2.5"woodscrews( J )shownin?[...]

  • Page 6

    6 of 14 ISSUED:07-25-1 1 SHEET #: 125-9225-1 J K g1.4 CINDER BLOCK SOLID  CONCRETE C Installation to Solid Concrete or Cinder Block • WheninstallingPeerlesswallmountsoncinderblock,verifythatyouhaveaminimumof1-3/8"(35mm)ofactual concretethicknessinthehole?[...]

  • Page 7

    7 of 14 ISSUED:07-25-1 1 SHEET #: 125-9225-1 Secureloweradapterplateontoprojectortiltplate( F )usingfourM6x10mmsocketpinscrews( M ). Re-fastenknobsandM10washersfromtopofadapterplateassembly( A ). Placeprojectortiltplate( F )ontoprojector?[...]

  • Page 8

    8 of 14 ISSUED:07-25-1 1 SHEET #: 125-9225-1 FastentwoM5x20mmsocketpinserrated washerheadscrews( R )intotopofadapter plateassembly( A )leaving3/8"ofexposed threadasshownbelow . FastenoneM5x20mmsocketpinserratedwasher headscre[...]

  • Page 9

    9 of 14 ISSUED:07-25-1 1 SHEET #: 125-9225-1 DET AIL 1 Securewallarmcap( S )intowallarmbracket( C )usingtwo#8x3/8"sheetmetalscrews( N ). Routeprojectorcablesasshown.Usetwocablemanagementbrackets( G )asneeded. NOTE :#8x3/8"sheetmetal[...]

  • Page 10

    10 of 14 ISSUED:07-25-1 1 SHEET #: 125-9225-1 FRONTOFPROJECT OR FRONTOFPROJECT OR Installation using W all Arm Bracket and Extension Bracket FRONTOFPROJECT OR 9 10 DET AIL 2 B C Snapextensioncap( U )intoextensionbracket( B )inorientationasshowningure9.1. Slidewallplatecover?[...]

  • Page 11

    1 1 of 14 ISSUED:07-25-1 1 SHEET #: 125-9225-1 FRONTOFPROJECT OR FRONTOFPROJECT OR FIGURE 9.2 FIGURE 9.1 FRONTOFPROJECT OR FRONTOFPROJECT OR FRONTOFPROJECT OR FRONTOFPROJECT OR Installation using W all Arm Bracket and Extension Bracket PROJECTORCABLES 11 12 AttachexposedM5x20mmsocketpin[...]

  • Page 12

    12 of 14 ISSUED:07-25-1 1 SHEET #: 125-9225-1 Pitch Adjustment Loosenknobsonfrontofprojector ,andtighten knobsonbackofprojectortopitchprojector forward.Reverseforprojectortopitchbackward. SUPPORTING SURF ACE NOT SHOWN FOR CLARITY Roll Adjustment Loosenknobsonleftside?[...]

  • Page 13

    13 of 14 ISSUED:07-25-1 1 SHEET #: 125-9225-1 DO NOT ADJUST TIGHTEN DO NOT ADJUST TIGHTEN Combination for Pitch and Roll Rotation SUPPORTING SURF ACE NOT SHOWN FOR CLARITY T ightenknobonbackrightofprojector ,andloosen knobonleftfrontofprojectortopitchandrotate projectorbackwardtothe?[...]

  • Page 14

    14 of 14 ISSUED:07-25-1 1 SHEET #: 125-9225-1 ©2009PeerlessIndustries,Inc. Allrightsreserved. PeerlessisaregisteredtrademarkofPeerlessIndustries,Inc. Allotherbrandandproductnamesaretrademarksorregisteredtrademarksoftheirrespectiveowners. Securewallpl[...]