Pelco IV SE SERIES manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Pelco IV SE SERIES, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Pelco IV SE SERIES one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Pelco IV SE SERIES. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Pelco IV SE SERIES should contain:
- informations concerning technical data of Pelco IV SE SERIES
- name of the manufacturer and a year of construction of the Pelco IV SE SERIES item
- rules of operation, control and maintenance of the Pelco IV SE SERIES item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Pelco IV SE SERIES alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Pelco IV SE SERIES, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Pelco service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Pelco IV SE SERIES.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Pelco IV SE SERIES item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    INSTALLATION Spectra ® IV Series Spectra ® IV SE Series C3416M-B (11/06) Surface Mount Back Box[...]

  • Page 2

    2 C3416M-B (11/06) Installation 1 2 3[...]

  • Page 3

    C3416M-B (11/06) 3 1. Using the ba ck box as a t emplate, mark the fasten er positions on the moun ting surfac e. 2. Prepare th e mounting surfa ce. Pull power and video wire/cab le for the do me system. Refer to T able A, T able B, and T able C f or wiring distances . 3. Open the hi nged door t o the back b ox. Push t he tab lock towards the wall [...]

  • Page 4

    4 C3416M-B (11/06) 4 5 VIDEO UTP+ UTP- RX- RX+ TX+ TX- PWR- PWR+ GND AUX2 GND GND NO NC COM 7 6 5 4 3 2 1 ALARMS AUX1[...]

  • Page 5

    C3416M-B (11/06) 5 4. Attach the back box to the moun ting surfa ce. 5. Connect wir ing to the circuit boa rd inside the back box. When finished, clos e the door to th e back box and turn on t he power . The green LED will light . NOTES: • Aux 1: Maximum 2 A at low voltage (<40 V) Aux 2: Maximum 30 mA at 32 VDC • If you are u sing both u nsh[...]

  • Page 6

    6 C3416M-B (11/06) SWITCH 1 AND 2 6 7 8 9[...]

  • Page 7

    C3416M-B (11/06) 7 6. Attach the b ack box leash to the lower dome by sliding the leash through the tab o f the lower dome until it snap s into place. 7. Configure DI P switches SW1 and SW2 locate d on the top of the dome drive. For DIP switch settings, refer to the labels locat ed on the top of the dome dr ive or to t he Switch Settings section. N[...]

  • Page 8

    8 C3416M-B (11/06) T roubleshooting If your dome do es not power up proper ly after installati on, use the following steps. 1. Check the fuse on the circuit boa rd inside the ba ck box for continuity . Replace the fuse if needed. 2. Check the wiri ng with a volt meter to en sure pr oper voltage is being received into the ba ck box. If your dome pow[...]

  • Page 9

    C3416M-B (11/06) 9 Switch Settings WAR N I NG : If you are using D-ty pe or P-type control, your system may no t operate if the baud rate and address switches are not set cor rectly . The switches ar e set at t he factory at the def aults for D-t ype control (2400 baud and address 1). T able E. Switch Settings for SW2 Special Sy stems S w i t c h N[...]

  • Page 10

    10 C3416M-B (11/06) T able F . Switch Settings for SW1, P- T ype Control NOTE: For Coaxitron controls, SW1 is not us ed; set all switches OFF . For D-type con trol systems, refer to T able G . T able G. Switch Settings for SW1, D-T ype Control NOTE: For Coaxitron controls, SW1 is not used; set all switches OFF . For P-type con trol systems, refer t[...]

  • Page 11

    C3416M-B (11/06) 11 SPECTRA ADDRESS SWITCH SETTI NG SW1-1 SW1-2 SW1-3 SW1-4 SW1-5 SW1-6 SW1-7 SW1-8 71 ON ON ON OFF OFF OFF ON OFF 72 OFF OFF OFF ON OFF OFF ON OFF 73 ON OFF OFF ON OFF OFF ON OFF 74 OFF ON OFF ON OFF OFF ON OFF 75 ON ON OFF ON OFF OFF ON OFF 76 OFF OFF ON ON OFF OFF ON OFF 77 ON OFF ON ON OFF OFF ON OFF 78 OFF ON ON ON OFF OFF ON O[...]

  • Page 12

    12 C3416M-B (11/06) SPECTRA ADDRESS SWITCH SET TING SW1-1 SW1-2 SW1-3 SW1-4 SW1-5 SW1-6 SW1-7 SW1-8 151 ON ON ON OFF ON OFF OFF ON 152 OFF OFF OFF ON ON OFF OFF ON 1 5 3 O NO F F O F FO N O NO F F O F FO N 154 OFF ON OFF ON ON OFF OFF ON 155 ON ON OFF ON O N OFF OFF ON 156 OFF OFF ON ON ON OFF OFF ON 157 ON OFF ON ON ON OFF OFF ON 158 OFF ON ON ON [...]

  • Page 13

    C3416M-B (11/06) 13 SPECTRA ADDRESS SWITCH SETTI NG SW1-1 SW1-2 SW1-3 SW1-4 SW1-5 SW1-6 SW1-7 SW1-8 223 ON ON ON ON ON OFF ON ON 224 OFF OFF OFF OFF OFF ON ON ON 225 ON OFF OFF OFF OFF ON ON ON 226 OFF ON OFF OFF OFF ON ON ON 227 ON ON OFF OFF OFF ON ON ON 228 OFF OFF ON OFF OFF ON ON ON 229 ON OFF ON OFF OFF ON ON ON 230 OFF ON ON OFF OFF ON ON ON[...]

  • Page 14

    14 C3416M-B (11/06) Specifications *For variable- speed operatio n an appropriat e controller is re quired. With fixed-s peed controll ers, pan/tilt speed is 20°/sec. The CM6700/CM68 00 controller with the KBD200A keyboard has pro grammable fixed speeds. The materials used in the manufacture of this document and its co mponents are compliant to th[...]

  • Page 15

    PRODUCT WARRANTY AND RETURN INFORMA TION WARRA NTY Pelco will r epair or repla ce, without char ge, any merc handise proved d efective in material or workmanship for a period of one year after the date of shipment. Exceptions to this warranty are a s noted below: • Five years on FR/F T/FS Series fiber optic produc ts and TW3000 Series unshielded [...]

  • Page 16

    W orldwide Headquarters 3500 Pelco W ay Clovis, California 93612 USA USA & Canada T el: 800/289-9100 Fax: 800/289-9150 International T el: 1-559/292-1981 Fax: 1-559/348-1120 www .p elco.c om ISO 9001 Australia | Canada | Finland | France | Italy | Russia | Singapore | Spain | Sweden | The Netherl ands | United Ar ab Emirat es | United Kingdom |[...]