Pelco TXB-V manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Pelco TXB-V, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Pelco TXB-V one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Pelco TXB-V. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Pelco TXB-V should contain:
- informations concerning technical data of Pelco TXB-V
- name of the manufacturer and a year of construction of the Pelco TXB-V item
- rules of operation, control and maintenance of the Pelco TXB-V item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Pelco TXB-V alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Pelco TXB-V, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Pelco service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Pelco TXB-V.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Pelco TXB-V item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    INST ALLA TION/OPERA TION TXB-V T ranslator Board C656M-E (4/07)[...]

  • Page 2

    2 C656M-E (04/07) Contents Important Safety Instructi ons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Important Notice. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Regulato[...]

  • Page 3

    C656M-E (4/07) 3 Important Safety Instructions 1. Read these instructions. 2. Keep these instructions. 3. Heed all warnings. 4. Follow all instructions. 5. Only use attachments/accessories specified by the manufacturer . 6. Installation should be don e only by qualified personnel and conform to all local codes. Only use replacement parts recommende[...]

  • Page 4

    4 C656M-E (4/07) Regulatory Notices This device complies with Part 15 of the FCC Rules. O peration is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. RADIO AND TELEVISION INTERFERENCE Thi[...]

  • Page 5

    C656M-E (4/07) 5 Description The TXB-V translator board allows Vicon ® controllers to communicate with Pelco’ s ExSite ™ , Esprit ® , and Spectra ® systems. After setup, the controller functions the same as a V icon controller normally would, except as noted in the Operation section on page 21. The TXB-V translator board has been tested and [...]

  • Page 6

    6 C656M-E (4/07) Esprit Installation T o install the TXB-V translator board in an Esprit system (refer to Figure 1): 1. T urn off power to the Esprit system. 2. Remove the left cover fro m the pan and tilt. 3. Remove the short ing plug from the 16-pin c onnector on the E sprit system’ s circuit board. 4. Remove the nut an d washer from the stando[...]

  • Page 7

    C656M-E (4/07) 7 Figure 2. TXB-V T ermination and B aud Rate (Bottom View) 6. Set the baud rate for the TXB-V translator board (from the controller). Use the P3 and P4 jumpers (refer to the following tab le). 7. Install the TXB-V on the Esprit circuit board (refer to Figure 3): a. Insert the 16-pin connector on the bo ttom of the TXB-V in to the ma[...]

  • Page 8

    8 C656M-E (4/07) 9. Reinstall the left cover of the pan and tilt: a. Properly position the cover and slide it into place. The sides of the cover must fit under the front and back rain guards of the pan and tilt. The top of the cover must seat against the lip of the top gasket. (Refer to Figure 4.) Figure 4. Installing the Esprit Co ver b. Apply pre[...]

  • Page 9

    C656M-E (4/07) 9 Figure 5. Fastening the Es prit Cover 10. Remove the pan and tilt from the base of the Esprit system. 11. Check the control wiring inside the base of the unit. Refer to the Esprit documentation and the documentation supplied with your controller to make su re the wiring is correct. 12. Reattach the pan and tilt onto the base of the[...]

  • Page 10

    10 C656M-E (4/07) Spectra III/Spectra IV Installation T o install the TXB-V translator board in a Spectra III/Spectra IV Series: 1. T urn off power to the dome system. 2. Remove the lower dome. 3. Remove the do me drive by pressing in the blue and red tabs on the sides of the dome drive. Gently rock the dome drive to relea se it from the back box. [...]

  • Page 11

    C656M-E (4/07) 11 6. Install the TXB-V translator board into the back box: a. Open the hinged door to the back box. Push the tab lock towards the back box wall of the unit and open the door (refer to Figure 7). Figure 7. Spectra III/Spectra IV Back Box Interconnect Door b. Check the wiring to the controller . Refe r to the Spectra III/Spectra IV do[...]

  • Page 12

    12 C656M-E (4/07) c. Remove the shorting plug from th e 16-pin connector located on the back box circuit bo ard (refer to Figure 8). Figure 8. Spectra III/Spectra IV Back Box Circuit Board NOTES: • Discard the 4-40 screw and its lock washer; they are not used in the Spectra III/Spectra IV system. • Save the 16-pin shorting plug. Otherwise, the [...]

  • Page 13

    C656M-E (4/07) 13 b. For Spectra III systems, set al l SW3 switches on the dome to the OFF position. For Spectra IV systems, set SW2-1 through SW2-8 to the OFF position. 8. Install the dome drive (refer to Figure 11). Line up the blue (A) and red (B) tabs with the blu e (A) and red (B) labels. When pushing the tabs in, insert one side, then the oth[...]

  • Page 14

    14 C656M-E (4/07) Spectra Mini Dome Installation T o install the T XB-V translator board in a Spectra Mini dome: NOTE: Installing a TXB-V into a mini dome increases unit heigh t. In surface mount installations, you must cut a hole in the surface to accommodate the TXB-V cover . For an installation template and more information, refer to the Spectra[...]

  • Page 15

    C656M-E (4/07) 15 5. Set the P2 jumper on the TXB-V to the pro per termination setting (refer to Figure 13). Note the following: • By default, the P2 jumper is installed in the unt erminated position. • All TXB-Vs in a daisy chain, except the last unit, must be un terminated. • The total wire distance from the Vicon controller to the last TXB[...]

  • Page 16

    16 C656M-E (4/07) Figure 14. Removing the Mini Dome Cover and Shor ting Plug c. Insert the TXB-V translator board into the 16-p in connector on the Spectra Mini dome’ s circuit board. d. Install the translator bo ard cover that is supplied with the Spectra Mini dome . Figure 15. Installing the TXB-V and Mini Dome Cover REMOVE SHORTING PLUG[...]

  • Page 17

    C656M-E (4/07) 17 8. Check the wiring to the controller . Refer to the Spectra Mini dome docume ntation and the documentation supplied with your controller to make su re the wiring is correct. 9. Refer to the installation manua l for the Spec tra Mini dome to complete the installation. 10. Apply power to the system. The following message appears on[...]

  • Page 18

    18 C656M-E (4/07) ExSite Installation T o install the TXB-V translator board in an ExSite unit: 1. T urn off the power to the ExSite system. 2. Remove the pan an d tilt unit from the power module (refer to Figure 16 and Figure 17): a. Loosen the setscrew in the lockin g ring with a 2 mm Alle n wrench. b. Loosen the locking ring with a span ner wren[...]

  • Page 19

    C656M-E (4/07) 19 • T o unterminate a TXB-V , remove the P2 jumper from the TXB-V and place it over one pin for storage. NOTE: When combining Pelco and Vicon receivers in the same system, refer to the Vicon manual for proper RS-485 configuration o f the Vicon receiver(s). Figure 18. TXB-V T ermination and Baud Rate (Bo ttom View) 4. Set the baud [...]

  • Page 20

    20 C656M-E (4/07) Figure 19. Installing the TXB-V into the ExSite 6. Check the wiring to the controller . Refer to the ExSite documen tation and the d ocumentation supplied with your controller to make sure the wiring is correct. 7. Set the DIP switches on the ExSite system (refer to Figure 19 for switch location): a. SW3: V erify that all SW3 swit[...]

  • Page 21

    C656M-E (4/07) 21 Operation Set preset 94 to access the camera menus. Press Iris Open to select menu items. The following table shows how the Vicon keyboard relates to the Pelco translator . Refer to your Vicon documentation for operating instructions. SPECIAL FUNCTIONS DEFINITIONS * Spectra SD53CBW family, Spectra SD435 family , Esprit ES30CBW18 f[...]

  • Page 22

    22 C656M-E (4/07) TXB-V ZONE PROGRAMMING PROCEDURE A zone is a pan area, defined by a left and right limit, on the 360-degree pan plane. T o program a zone using a Vicon controller (refer to the manual supplied with the controller): IMPORT ANT : (Spectra III/Spectra IV and ExSite systems only ): After programming a zone, always enable the zone thro[...]

  • Page 23

    C656M-E (4/07) 23 T roubleshooting Symptom Possible Cause Su ggested Remedy No video is displayed. Power is not connected to the Pelco unit. Check the power connector . Video cable is not connected to the Pelco unit. Check the video connector . T ranslator board is not inserted properly . Reinstall the translator board. Make sure the pins on the bo[...]

  • Page 24

    24 C656M-E (4/07) Appendix Ta b l e A . Receiver Address Settings Receiver Address Switch Setting 12345678 1 ON OFF OFF OFF OFF OFF OFF OFF 2 OF F ON OFF OFF OFF OFF OF F OFF 3 ON ON OFF OFF OFF OFF OFF OFF 4 OFF OFF ON OFF OFF OFF OFF OFF 5 ON OFF ON OFF OFF OFF OFF OFF 6 OFF ON ON OFF OFF OFF OFF O FF 7 ON ON ON OFF OFF O FF OFF OFF 8 OF F OFF OF[...]

  • Page 25

    C656M-E (4/07) 25 38 OFF ON ON OFF OFF ON OFF OFF 39 ON ON ON OFF OFF ON OFF OFF 40 OFF OFF OFF ON OFF ON OFF OFF 41 ON OFF OFF ON OFF ON OFF OFF 42 OFF ON OFF ON OFF ON OFF OFF 43 ON ON OFF ON OFF ON OFF OFF 44 OFF OFF ON ON OFF ON OFF OFF 45 ON OFF ON ON OFF ON OFF OFF 46 OFF ON ON ON OFF ON OFF OFF 47 ON ON ON ON OFF ON OFF OFF 48 OFF OFF OFF OF[...]

  • Page 26

    26 C656M-E (4/07) 78 OFF ON ON ON OFF OFF ON OFF 79 ON ON ON ON OFF OFF ON OFF 80 OFF OFF OFF OFF ON OFF ON OFF 81 ON OFF OFF OFF ON OFF ON OFF 82 OFF ON OFF OFF ON OFF ON OFF 83 ON ON OFF OFF ON OFF ON OFF 84 OFF OFF ON OFF ON OFF ON OFF 85 ON OFF ON OFF ON OFF ON OFF 86 OFF ON ON OFF ON OFF ON OFF 87 ON ON ON OFF ON OFF ON OFF 88 OFF OFF OFF ON O[...]

  • Page 27

    C656M-E (4/07) 27 118 OFF ON ON OFF ON ON ON OFF 119 ON ON ON OFF ON ON ON OFF 120 OFF OFF OFF ON ON ON ON OFF 1 2 1 O N O F F O F F O NO NO NO N O F F 122 OFF ON OFF ON ON ON ON OFF 123 ON ON OFF ON ON ON ON OFF 1 2 4 O F F O F F O NO NO NO NO N O F F 125 ON OFF ON ON ON ON ON OFF 126 OFF ON ON ON ON ON ON OFF 1 2 7 O NO NO NO NO NO NO N O F F 128[...]

  • Page 28

    28 C656M-E (4/07) 158 OFF ON ON ON ON OFF OFF ON 1 5 9 O NO NO NO NO N O F F O F F O N 160 OFF OFF OFF OFF OFF ON OFF ON 161 ON OFF OFF OFF OFF ON OFF ON 162 OFF ON OFF OFF OFF ON OFF ON 163 ON ON OFF OFF OFF ON OFF ON 164 OFF OFF ON OFF OFF ON OFF ON 165 ON OFF ON OFF OFF ON OFF ON 166 OFF ON ON OFF OFF ON OFF ON 1 6 7O N O N O NO F F O F FO NO F [...]

  • Page 29

    C656M-E (4/07) 29 198 OFF ON ON OFF OFF OFF ON ON 199 ON ON ON OFF OFF OFF ON ON 200 OFF OFF OFF ON OFF OFF ON ON 2 0 1O NO F F O F FO NO F F O F FO N O N 202 OFF ON OFF ON OFF OFF ON ON 203 ON ON OFF ON OFF OFF ON ON 204 OFF OFF ON ON OFF OFF ON ON 205 ON OFF ON ON OFF OFF ON ON 206 OFF ON ON ON OFF OFF ON ON 2 0 7 O NO NO NO N O F F O F F O NO N [...]

  • Page 30

    30 C656M-E (4/07) 238 OFF ON ON ON OFF ON ON ON 239 ON ON ON ON OFF ON ON ON 240 OFF OFF OFF OFF ON ON ON ON 241 ON OFF OFF OFF ON ON ON ON 242 OFF ON OFF OFF ON ON ON ON 2 4 3 O NO N O F F O F F O NO NO NO N 244 OFF OFF ON OFF ON ON ON ON 245 ON OFF ON OFF ON ON ON ON 246 OFF ON ON OFF ON ON ON ON 247 ON ON ON OFF ON ON ON ON 248 OFF OFF OFF ON ON[...]

  • Page 31

    PRODUCT WARRANTY AND RETURN INFORMATION WARRANTY Pelco will repair or replace, without charge, any mer c handise proved defective in ma terial or wor kmanship for a period of one year after th e date of shipment. Exception s to this warrant y are as noted below: • Five years on fiber o ptic products and TW3 000 Series unshield ed twisted pair t r[...]

  • Page 32

    Worl dwide Headquarters 3500 Pelco W ay Clovis, California 93612 USA USA & Canada T el: 800/289-9100 Fax: 800/289-9150 International T el: 1-559/292-1981 Fax: 1-559/348-1120 www .pelco.com ISO 9001 Australia | Canada | Finland | France | Germany | Italy | Macau | The Netherlands | Russia | Singapore South Africa | Spain | Sweden | United Arab E[...]