Quadra-Fire Direct Vent Room Heater 839-1390 manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Quadra-Fire Direct Vent Room Heater 839-1390, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Quadra-Fire Direct Vent Room Heater 839-1390 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Quadra-Fire Direct Vent Room Heater 839-1390. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Quadra-Fire Direct Vent Room Heater 839-1390 should contain:
- informations concerning technical data of Quadra-Fire Direct Vent Room Heater 839-1390
- name of the manufacturer and a year of construction of the Quadra-Fire Direct Vent Room Heater 839-1390 item
- rules of operation, control and maintenance of the Quadra-Fire Direct Vent Room Heater 839-1390 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Quadra-Fire Direct Vent Room Heater 839-1390 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Quadra-Fire Direct Vent Room Heater 839-1390, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Quadra-Fire service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Quadra-Fire Direct Vent Room Heater 839-1390.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Quadra-Fire Direct Vent Room Heater 839-1390 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    Quartet Front Solitaire Front www .quadrafire.com September 1, 2008 250-7233H R O-T L T ested and Listed by Portland Oregon USA OMNI-T est Laboratories, Inc. C US DO NOT DISCARD THIS MANUAL CAUTION • Important operating and maintenance instructions included. • Leave this manual with party responsible for use and operation. • Read, understand[...]

  • Page 2

    Page 2 Quadra-Fire · Sapphire · 250-7233H September 1, 2008 and Welcome to the Quadra-Fire Family ! Hearth & Home T echnologies welcomes you to our tradition of excellence! In choosing a Quadra-Fire appliance, you have our assurance of commitment to quality , durability , and performance. This commitment begins with our research of the market[...]

  • Page 3

    Page 3 Quadra-Fire · Sapphire · 250-7233H - T ABLE OF CONTENTS - September 1, 2008 Section 1: Listing and Code Approvals A. Appliance Certifications ...................... 4 B. Glass Specifications ............................ 4 C. BTU Specifications .............................. 4 D. High Altitude Installations .................... 4 E. Non-[...]

  • Page 4

    Page 4 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H 1 Listing and Code Approvals The product is listed to ANSI standards for “V ented Gas Appliance Heaters” and applicable sections of “Gas Burning Heating Appliances for Manufactured Homes and Recre- ational V ehicles” and "Gas Fired Appliances for use at High Altitudes".[...]

  • Page 5

    September 1, 2008 Page 5 Quadra-Fire · Sapphire · 250-7233H NOTE: The following requirements reference various Massachusetts and national codes not contained in this document. For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including t[...]

  • Page 6

    Page 6 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H 2 Getting Started Check building codes prior to installation. • Installation MUST comply with local, regional, state and national codes and regulations. • Consult local building, fire officials or authorities having jurisdiction about restrictions, installation inspection, and perm[...]

  • Page 7

    September 1, 2008 Page 7 Quadra-Fire · Sapphire · 250-7233H 3 Appliance Location and Clearances A. Selecting Appliance Location NOTE: · Illustrations reflect typical installations and are FOR DESIGN PURPOSES ONL Y . · Illustrations/diagrams are not drawn to scale. · Actual installation may vary due to individual design preference. When select[...]

  • Page 8

    Page 8 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H 4 T ermination Locations A. V ent T ermination Minimum Clearances 20 in. (508mm) (minimum) to Perpendicular W all (Gas Only) A 18 in. (457mm) Gas or Wood T ermination Gas T ermination Gas T ermination A 6 in. (152mm) W ood & Fuel Oil T ermination 20 in. (508mm) Figure 4.2 Multiple V [...]

  • Page 9

    September 1, 2008 Page 9 Quadra-Fire · Sapphire · 250-7233H Figure 4.4 V = VENT TERMINAL X = AIR SUPPL Y INLET = AREA WHERE TERMINAL IS NOT PERMITTED A = 12 inches ............. clearances above grade, veran- da, porch, deck or balcony B = 1 2 i n c hes ............ clearances to window or door that may be opened, or to per- manently closed windo[...]

  • Page 10

    Page 10 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H 5 V ent Information A. V enting Components B. Use of Elbows In order to comply with applicable codes and product warranties, use only following venting components: • Hearth & Home T echnologies (HHT) • Simpson Dura-V ent (SDV) • Selkirk • AmeriV ent • Security Secure V ent[...]

  • Page 11

    September 1, 2008 Page 1 1 Quadra-Fire · Sapphire · 250-7233H D. How to Use the V ent Graph E. V enting Guidelines NOTE: IF YOUR INST ALLA TION F ALLS WITHIN A SHADED AREA ON THE GRAPH, THE DAMPER MUST BE USED. NOTE: In the Commonwealth of Massachusetts, the word damper shall be replaced with the words flue restrictor . 1. Measure the distance fr[...]

  • Page 12

    Page 12 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H Female Locking Lugs Male Locking Lugs Step 1. Determine the desired location of the appliance. Check to ensure that wall studs or roof rafters are not in the way when the venting system is attached. If this is the case, you may want to adjust the location of the appliance. F . Horizonta[...]

  • Page 13

    September 1, 2008 Page 13 Quadra-Fire · Sapphire · 250-7233H NOTE: (1) Installation requires a minimum of 1 1 in. (279mm) horizontal run. Each 1 ft. (305mm) of horizontal vent run must include a 1/4 in. (6mm) of vertical rise towards the termination. Never allow the vent to run downward. This could cause high temperatures and may present the poss[...]

  • Page 14

    Page 14 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H Step 5. Place the wall thimble cover over the pipe assembly and slide the appliance and vent assembly towards the wall, carefully inserting the vent pipe into the vent termination cap assembly . It is important that the vent pipe extend into the vent termination cap a sufficient distanc[...]

  • Page 15

    September 1, 2008 Page 15 Quadra-Fire · Sapphire · 250-7233H Step 1. Check the installation instructions for required 1 in. (25mm) clearances (air space) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. See page 16, Figure 5.15. Check the instructions for maximum vertica[...]

  • Page 16

    Page 16 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H Step 4. Assemble the desired lengths of pipe and elbows necessary to reach from the appliance up through the round support box. Ensure that all pipe and elbow connections are in their fully twist-locked position. Assemble as instructed. Step 5. Cut a hole in the roof centered on the sma[...]

  • Page 17

    September 1, 2008 Page 17 Quadra-Fire · Sapphire · 250-7233H Ceiling Firestop Nails Minimum 1 in. (24mm) Clearance Minimum 1 in. (24mm) Clearance Minimum 1 in. (24mm) Clearance Minimum 1 in. (24mm) Clearance Figure 5.16 Fire Risk. Explosion Risk. W ARNING • Any occupied areas above the first floor , including closets and storage spaces, which t[...]

  • Page 18

    Page 18 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H 2. Cathedral Ceiling Level Cathedral Ceiling Support Box 2 in. (51mm) Min. below finished ceiling Cut hole 1/8 in. (3mm) greater in size than pattern of support box as it is projected onto roof line Figure 5.16 Figure 5.17 Step 1. Follow installation Steps 1 and 2 under vertical install[...]

  • Page 19

    September 1, 2008 Page 19 Quadra-Fire · Sapphire · 250-7233H High Wind T ermination Cap Sheet Metal Screws Drill Four 1/8 in. (3mm) Diamater Holes Figure 5.21 Figure 5.22 Step 4. Pass the flex pipe down through the center of the chimney system, and center the top adapter on the top of the chimney pipe. Drill four 1/8 in. (3mm) diameter holes thro[...]

  • Page 20

    Page 20 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H 4. Existing Masonry Chimney T ype A - Up & Out Installations for T op V ent Configurations Figure 5.23 T ype B - Hearth Rear V ent Installations for Use With Rear V ent Kit (see Section 12 for conversion kit and venting components.) T ermination Cap Flashing 4 in. (102mm) Flex Liner[...]

  • Page 21

    September 1, 2008 Page 21 Quadra-Fire · Sapphire · 250-7233H 10 in. x 10 in. (254mm x 254mm) framed opening in wall Studwall Masonry Chimney Retro Connector (4) Masonry Bolts (Not Included) Wall Thimble Cover Cut and bend flashing as needed to fit Sealant adhesive Figure 5.24 Figure 5.25 Step 1. Before cutting any holes, assemble the desired sect[...]

  • Page 22

    Page 22 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H High Wind T ermination Cap T op Adaptor (3) Sheet Metal Screws Flashing Step 9. Attach the flex to the retro connector. Use three sheet metal screws to attach the flex liner to the connector ( Figure 5.28 ). Mount the retro connector to the masonry wall using masonry bolts. Redrill larg[...]

  • Page 23

    September 1, 2008 Page 23 Quadra-Fire · Sapphire · 250-7233H 6 Gas Information A. Fuel Conversions Before making gas connections ensure that the appliance being installed is compatible with the available gas type. Any natural or propane gas conversions necessary to meet the appliance and locality needs must be made by a quali- fied technician us[...]

  • Page 24

    Page 24 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H A B C Mounting Screws Pressure Regulator T ower Diaphragm Figure 6.6 T urn control knob to the OFF position, ensure that gas supply to the valve has been turned off. Using a T orx TH20, or slotted screwdriver , remove the three pressure reg- ulator mounting screws (A) , pressure regulat[...]

  • Page 25

    September 1, 2008 Page 25 Quadra-Fire · Sapphire · 250-7233H Fire Risk. Explosion Risk. • If the information in these instructions is not followed exactly , a fire, explosion or production of carbon monoxide may result causing property damage, personal injury or loss of life. • The qualified service agency is responsible for the proper inst[...]

  • Page 26

    Page 26 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H • A small amount of air will be in the gas supply lines. When first lighting appliance it will take a short time for air to purge from lines. When purging is complete the appliance will light and operate normally . Air only needs to be purged again if gas valve has been turned to the[...]

  • Page 27

    September 1, 2008 Page 27 Quadra-Fire · Sapphire · 250-7233H 7 Electrical Information A. Recommendation for Wire C. Standing Pilot Ignition System Wiring See B5 below for recommended maximum lead length (two wire) when using wall thermostat/switch. B. Connecting to the Appliance This appliance DOES NOT require 1 10 V AC supply for operation. A wi[...]

  • Page 28

    Page 28 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H Figure 7.1 CAUTION Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. V erify proper operation after servicing. Shock hazard. • Replace damaged wire with type 105 O C rated wire. • Wire must have high temperature[...]

  • Page 29

    September 1, 2008 Page 29 Quadra-Fire · Sapphire · 250-7233H 8 Appliance Setup A. Remove Shipping Materials Remove shipping materials from inside or underneath the firebox. B. T op and Rear V ent Conversion Figure 8.1 Remove rear access plate on the back shield and discard. Figure 8.2 Remove the rear outer flue cover plate (with the damper adju[...]

  • Page 30

    Page 30 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H Figure 8.4 Install the inner flue collar on rear of appliance , with damper rod pointing up. A dab of high temperature silicone on the gasket will help gasket adhere to the appliance. Figure 8.5 Install the inner flue cover on top of the appliance, ensuring that the damper rod is in t[...]

  • Page 31

    September 1, 2008 Page 31 Quadra-Fire · Sapphire · 250-7233H Figure 8.9 Remove burner by sliding the shutter to the right, lifting up the left side of the burner and sliding it the the left. Figure 8.10 Remove the main burner orifice using a 5/8 in. wrench. PROP ANE NA TURAL GAS .059 (53 DMS) .096 (41(DMS) NOTE: If the venting configuration has [...]

  • Page 32

    Page 32 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H E. Front Installation Figure 8.13 T o remove the face, loosen the thumb bolt beneath the ashlip. Figure 8.14 Lift up on the top of the Front, gently pulling out on the bottom. Set aside in a safe location. For BOTH Quartet and Solitaire Fronts: INST ALLA TION AND REMOV AL INSTRUCTIONS F[...]

  • Page 33

    September 1, 2008 Page 33 Quadra-Fire · Sapphire · 250-7233H F . Hearth Legs Installation Refer to Section 12 for specific color part numbers. Hearth legs will allow three additional inches of clearance. Be sure to calculate this distance correctly if necessary to cut wall hole to install horizontally . Refer to Dimensions on in Section 12. T o c[...]

  • Page 34

    Page 34 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H H. Mineral Wool • Follow ember placement instructions in manual. • Do NOT place embers directly over burner ports. • Replace ember material annually . Explosion Risk. W ARNING Improperly placed embers interferes with proper burner operation. Figure 8.21 Place individual pieces of [...]

  • Page 35

    September 1, 2008 Page 35 Quadra-Fire · Sapphire · 250-7233H NOTE: This blower utilizes a snap disc to control ON and OFF operation. When the correct temperature is reached, the blower will automatically turn ON. Use the rheostat knob to adjust the fan to High or Low to suit your preferences. Figure 8.24 Use two screws to connect the snap disc br[...]

  • Page 36

    Page 36 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H SNAP DISC 6 in. (152mm) BLACK BLOWER 4 in. (102mm) WHITE CORD M F M F 34 in. (864mm) BLACK 34 in. (864mm) WHITE F M M F RHEOST A T F F M F Figure 8.26 Blower Wiring Diagram[...]

  • Page 37

    September 1, 2008 Page 37 Quadra-Fire · Sapphire · 250-7233H See vent graph for recommendations on page 1 1 before you begin your adjustment. If your installation falls within the range of the gray shaded area of graph, it may be necessary to make an adjustment to the vertical damper to improve the flame appearance in your appliance. NOTE: In the[...]

  • Page 38

    Page 38 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H 9 Operating Instructions A. Before Lighting Appliance Read this entire manual prior to using the appliance. Failure to follow the instructions may result in property damage, bodily injury, or even death. Glass door must be in place when appliance is operating. Risk of: • Combustion Fu[...]

  • Page 39

    September 1, 2008 Page 39 Quadra-Fire · Sapphire · 250-7233H C. Lighting Appliance 1. Set the thermostat to lowest setting. 2. T urn off all electric power to the appliance if service is to be performed. 3. Push in gas control knob slightly and turn clockwise to "OFF" position. FOR YOUR SAFETY READ BEFORE LIGHTING LIGHTING INSTRUCTIONS [...]

  • Page 40

    Page 40 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H D. After Appliance is Lit When you light your appliance, you may notice that it pro- duces heat which does have an associated odor or smell. If you feel this odor is excessive it may require the initial three to four hour continuous burn on high followed by a second burn up to 12 hours [...]

  • Page 41

    September 1, 2008 Page 41 Quadra-Fire · Sapphire · 250-7233H 10 T roubleshooting With proper installation, operation, and maintenance your gas appliance will provide years of trouble-free service. If you do experience a problem, this troubleshooting guide will assist a qualified service person in the diagnosis of a problem and the corrective act[...]

  • Page 42

    Page 42 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H Symptom Possible Cause Corrective Action 3. (Continued) c. Defective valve. T urn the valve knob to the ON position. Place the ON/OFF switch in the ON position. Check the millivolt meter at the thermopile terminals. The millivolt meter should read greater than 125mV . If the reading is [...]

  • Page 43

    September 1, 2008 Page 43 Quadra-Fire · Sapphire · 250-7233H 11 Maintaining and Servicing Appliance Although the frequency of your appliance servicing and maintenance will depend on use and the type of installation, a qualified service technician should perform an appliance check-up at the beginning of each heating season. Risk of injury or prop[...]

  • Page 44

    Page 44 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H Inspect Maintenance T asks Doors 1. Inspect for scratches, dents or other damage and repair as necessary . 2. V erify no obstructions to air flow . 3. V erify maintenance of proper clearance to combustible household objects. Gasket Seal, Glass Assembly and Glass 1. Inspect gasket seal [...]

  • Page 45

    September 1, 2008 Page 45 Quadra-Fire · Sapphire · 250-7233H 12 Reference Materials A. Appliance Dimension Diagram Dimensions are actual appliance dimensions. Use for reference only . For clearances refer to Section 3. Figure 12.1 Appliance Dimensions NOTE: If appliance is equipped with Hearth Legs Kit, center-line dimension is reduced by 3 in. ([...]

  • Page 46

    Page 46 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H B. V ent Components Diagram Figure 12.2 SL-D Series V ent Components 4 in. (102 mm) inner pipe 6-5/8 in. (168 mm) outer pipe 9-1/4 in. (235mm) 6-1/2 in. (165mm) 6-5/8 in. (168mm) 17-24 in. (432-610mm) 1 1-3/4 in. (298mm) 5-3/4 in. (146mm) 6-5/8 in. (168mm) 6-3/8 in. (162mm) 6-1/2 in. (1[...]

  • Page 47

    September 1, 2008 Page 47 Quadra-Fire · Sapphire · 250-7233H C. V ent Components List Description HHT SL-P M= Multi Pack (6) Simpson Dura-V ent DirectV ent Pro Selkirk Direct-T emp Amerivent Direct Security Secure V ent 4” Pipe Length, Galvanized SLP4M - - - - 4” Pipe Length, Black SLP4-BK - - - - 6” Pipe Length, Galvanized SLP6M 46-DV A-06[...]

  • Page 48

    Page 48 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H 45° Elbow , Swivel, Black - 46DV A-E45B - - SV4EB45 90° Elbow , Galvanized SLP90M See Swivel 4DT -EL905 4D90LS - 90° Elbow , Black SLP90-BK See Swivel 4DT -EL90SB 4D90LBS SV4EBR90 90° Elbow , Swivel, Galvanized - 46DV A-E90 - - SV4E90 90° Elbow , Swivel, Black - 46DV A-E90B - - SV4[...]

  • Page 49

    September 1, 2008 Page 49 Quadra-Fire · Sapphire · 250-7233H D. Service Parts List R SAPPHIRE (NG, LP) Exploded Parts Diagram Beginning Manufacturing Date: 4-24-02 Ending Manufacturing Date: Item # Description Item # Description 1 Refractory , Metal 12 Igniter , Piezo 2 Log Support, Rear 13 Switch, Rocker , ON/OFF 3 Burner Support 14 Knob, Rheost[...]

  • Page 50

    Page 50 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H Item # Part Description Alphabetical Order SKU Adapter , DV 7000-162 18 Adapter , V alve Extension 450-6330 Air Shutter Assembly 468-5060 Ash Lip 454-0070 20 Back Shield 455-0200 19 Back Shield Cover Plate 455-0220 22 Baffle 455-0290 21 Baffle Hanger 455-0300 Blower BK-GAS 4 Bulkhead [...]

  • Page 51

    September 1, 2008 Page 51 Quadra-Fire · Sapphire · 250-7233H Item # Part Description Alphabetical Order SKU IMPORT ANT : THIS IS DA TED INFORMA TION. The most current information is located on your dealer's VIP site. When ordering, supply serial and model numbers to ensure correct service parts. D. Service Parts (cont’d.) R (NG, LP) Explod[...]

  • Page 52

    Page 52 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H IMPORT ANT : THIS IS DA TED INFORMA TION. The most current information is located on your dealer's VIP site. When ordering, supply serial and model numbers to ensure correct service parts. D. Service Parts (cont’d.) R SAPPHIRE (NG, LP) Exploded Parts Diagram Beginning Manufacturi[...]

  • Page 53

    September 1, 2008 Page 53 Quadra-Fire · Sapphire · 250-7233H F . Service and Maintenance Log Date of Service Performed By Description of Service[...]

  • Page 54

    Page 54 September 1, 2008 Quadra-Fire · Sapphire · 250-7233H G. W arranty Policy Hearth & Home T echnologies LIMITED W ARRANTY Hearth & Home T echnologies (“HHT”) and its respective brands extends the following warranty for HHT gas, wood, pellet and electric appliances purchased from an authorized HHT dealer and installed in the Unite[...]

  • Page 55

    September 1, 2008 Page 55 Quadra-Fire · Sapphire · 250-7233H  HHT’s obligation under this warranty does not extend to damages resulting from: (1) installation, operation or main- tenance of the appliance not in accordance with the installation instructions; operating instructions and the listing agent identification label furnished with the[...]

  • Page 56

    Page 56 Quadra-Fire · Sapphire · 250-7233H September 1, 2008 Hearth & Home T echnologies 1445 North Highway Colville, W A 991 14 Division of HHT INDUSTRIES CONT ACT INFORMA TION : DEALERSHIP WHERE PURCHASED: ______________________________________ _______________________________________ _______________________________________ DEALER TELEPHONE:[...]