Raypak 2342BE manual

1
2
3
4
5

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Raypak 2342BE, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Raypak 2342BE one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Raypak 2342BE. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Raypak 2342BE should contain:
- informations concerning technical data of Raypak 2342BE
- name of the manufacturer and a year of construction of the Raypak 2342BE item
- rules of operation, control and maintenance of the Raypak 2342BE item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Raypak 2342BE alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Raypak 2342BE, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Raypak service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Raypak 2342BE.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Raypak 2342BE item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    Project Name / Date Division 23 52 33.13 - 1 DIVISION 23 52 33.13 FINNED WATER-TU BE BOILERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes gas-fired, copp er finned-tube hydronic heating boilers B. Related Sections Specifier Note: Use as needed 1. Building Services Piping – Division 23 21 00 2. Breeching, Chimneys, and Stacks (Vent ing) – Di[...]

  • Page 2

    Project Name / Date Division 23 52 33.13 - 2 Fax: (800) 872-9725; Web site: www.ray pak.com 2. Product: Hi Delta ® copper finned-tube hydroni c boiler(s) 2.2 BOILERS A. General 1. The boiler(s) shall be fired with gas at a rated input of BTU/hr. 2. The boiler(s) shall be CSA tested and certified with a minimum ther mal efficiency of 87 percent at [...]

  • Page 3

    Project Name / Date Division 23 52 33.13 - 3 d. Temperature and pressure gauge 2. The boiler(s) shall be equipped with an energy -saving pump control relay (Economaster II), mounted and wired, which automatically shuts o ff the boiler pump at a set period after boiler shut-down (adjustable for five or ten minute s) to avoid standby losses associ at[...]

  • Page 4

    Project Name / Date Division 23 52 33.13 - 4 powder coat which is suita ble for outdoor insta llation, applied prior to assembly for complete coverage, and shall incorporate louve rs in the outer panels to divert air past heated su rfaces. 2. The boiler(s), if located on a combustible floor , shall not requi re a separate combustible floor base. 3.[...]

  • Page 5

    Project Name / Date Division 23 52 33.13 - 5 c. Inlet temperature error d. Sensor out of range 6. The controller shall have alarm contacts. Q. Low Gas Supply Pressure Manifold 1. The boiler(s) shall be CSA certified for full-i nput operation down to 4 .0” WC dynamic inlet gas supply pres sure. R. TruSeal™ Direct Vent 1. The boiler(s) shall meet[...]