Go to page of
Similar user manuals
-
Boiler
Raypak 700
8 pages 2.87 mb -
Boiler
Raypak 0066B
40 pages 1.01 mb -
Boiler
Raypak H7 504-2004
2 pages 0.13 mb -
Boiler
Raypak H-0066B
4 pages 0.09 mb -
Boiler
Raypak H-0030B
4 pages 0.09 mb -
Boiler
Raypak 3001
2 pages 0.08 mb -
Boiler
Raypak HI DELTA 302B
60 pages 3.15 mb -
Boiler
Raypak HD101
8 pages 1.54 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Raypak 302BD-2342BD, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Raypak 302BD-2342BD one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Raypak 302BD-2342BD. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Raypak 302BD-2342BD should contain:
- informations concerning technical data of Raypak 302BD-2342BD
- name of the manufacturer and a year of construction of the Raypak 302BD-2342BD item
- rules of operation, control and maintenance of the Raypak 302BD-2342BD item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Raypak 302BD-2342BD alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Raypak 302BD-2342BD, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Raypak service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Raypak 302BD-2342BD.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Raypak 302BD-2342BD item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
SUPPLEMENT AL INST ALLA TION AND OPERA TING INSTR UCTIONS Catalog No. 1000.58B Effective: 06-24-08 Replaces: 02-22-07 P/N 241295 Rev . 3 Patent No. 6,904,873; Other patent pending FOR Y OUR SAFETY : Do not store or use gasoline or other flammable vapors and liquids or other combustible materials in the vicinity of this or any other appliance. T o d[...]
-
Page 2
2 Rev . 3 reflects the following: Changes to: step 4 of the FlexGas System Start-up section on page 7; the Wiring Diagram was moved from page 5 to page 9; the addition of: a note to the Attach Manometers to Measure Pressures section on page 7 .[...]
-
Page 3
Raypak strongly recommends that this manual be reviewed thoroughly before installing your Hi Delta heater equipped with FlexGas. Raypak also recom- mends that the appropriate Hi Delta Installation and Operating Instruction manual (1000.501 for 302B- 902B or 1000.51 1 for 992B – 2342B) be thoroughly read before attempting to install these heaters.[...]
-
Page 4
4 All Raypak heaters are National Board Approved, and design-certified and tested by the Canadian Stan- dards Association (CSA) for the U.S. and Canada. Each heater is constructed in accordance with Section IV of the American Society of Mechanical Engineers (ASME) Pressure V essel Code, and bears either the ASME “H” stamp for boilers or “HL W[...]
-
Page 5
5 Gas Supply Pr essure A minimum of 5.0 in. WC and a maximum of 10.5 in. WC upstream gas pressure is required under load and no-load conditions for natural gas. A minimum of 8.0 in. WC and a maximum of 13.0 in. WC is required for propane gas. The gas pressure regulator(s) supplied on the heater is for low-pressure service. If upstream gas pressures[...]
-
Page 6
6 Star t-up F or Y our Safety This appliance has a hot surface igniter(s). It is equipped with an ignition device(s) which automatical- ly lights the burners. Do not try to light the burners by hand. BEFORE OPERA TING, smell all around the appli- ance area for gas. Be sure to smell near the floor because some gas is heavier than air and will settle[...]
-
Page 7
7 Prepar ation Check P ow er Suppl y With multi-meter at incoming power in Hi Delta heater , check voltage between: Hot - Common (≈120 V AC) Hot - Ground (≈120 V AC) Common - Ground (< 1 V AC) Attach Manometers to Measure Pr essures 1. T urn off main gas valves. 2. Attach 24” scale manometer to the first main gas shut-off valve pressure ta[...]
-
Page 8
F r om PR O to NA T: 1. T urn the boiler off (power switch on front control panel). 2. T urn FlexGas key to “OFF”. 3. Close PRO manual valve. 4. Open NA T manual valve. 5. T urn FlexGas key to “NA T”. 6. T urn the boiler on. Safety Inspection 1. Check all thermostats and high limit settings. 2. During the following safety checks leave ma- n[...]
-
Page 9
9 4. Remove all manometers and replace caps and screws. 5. Replace all gas pressure caps. 6. Check for gas leaks one more time. 7. Restart unit. Fig. 5: FlexGas Control Panel Fig. 6 Wiring Diagram * *Optional on 302BD–902BD W iring Dia g ram[...]
-
Page 10
10[...]
-
Page 11
11 CALL OUT DESCRIPTION 302BD-652BD 752BD-902BD 992BD-1262BD 1532BD-2342BD F 3 4 9 1 1 0 F 3 4 9 1 1 0 F 3 4 9 1 1 0 F 3 4 9 1 1 0 Y S S A H C T I W S Y E K C - 1 F 6 2 1 2 1 0 F 6 2 1 2 1 0 F 6 2 1 2 1 0 F 6 2 1 2 1 0 C A V 0 2 1 T D P S - Y A L E R C - 2 3-C CONNECTOR-WIRE BONDING 007155F 007155F 007155F 007155F 1-G GAS SOLENOID V AL VE (NA T) 01[...]
-
Page 12
Raypak, Inc., 2151 Eastman Avenue, Oxnard, CA 93030 (805) 278-5300 Fax (805) 278-5468 Litho in U.S.A. www .raypak.com[...]