Go to page of
Similar user manuals
-
Electric Heater
Roberts Gorden TF-250
72 pages 12.66 mb -
Electric Heater
Roberts Gorden TF-380
28 pages 5.38 mb -
Electric Heater
Roberts Gorden TF-300
28 pages 5.38 mb -
Electric Heater
Roberts Gorden BH-150
70 pages 11.15 mb -
Electric Heater
Roberts Gorden TF-200
28 pages 5.38 mb -
Electric Heater
Roberts Gorden BH15
25 pages 4.29 mb -
Electric Heater
Roberts Gorden CTHN-60
48 pages 7.52 mb -
Electric Heater
Roberts Gorden CGTH-40
58 pages 6.3 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Roberts Gorden CTHN-200, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Roberts Gorden CTHN-200 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Roberts Gorden CTHN-200. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Roberts Gorden CTHN-200 should contain:
- informations concerning technical data of Roberts Gorden CTHN-200
- name of the manufacturer and a year of construction of the Roberts Gorden CTHN-200 item
- rules of operation, control and maintenance of the Roberts Gorden CTHN-200 item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Roberts Gorden CTHN-200 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Roberts Gorden CTHN-200, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Roberts Gorden service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Roberts Gorden CTHN-200.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Roberts Gorden CTHN-200 item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
Roberts-Gordon, LLC 1250 William Street P. O . B o x 4 4 Buffalo, New Y ork 14240-0044 T e lephone: 716.852.4400 Fax: 716.852.0854 T o ll Free: 800.828.7450 www .rg-inc.com © Cop yright 2006 Roberts-Gordon, LLC Quality in Any La nguage™ CTHN-40 CTHN-60 CTHN-80 CTHN-1 0 0 CTHN-1 25 CTHN-1 50 CTHN-1 75 CTHN-20 0 P/N 1 521 0 1NA R ev A 1 0/06 Vanta[...]
-
Page 2
[...]
-
Page 3
T ABLE OF CONTENTS SECTION 1: Heat er Safety ........ .................... ...................... .... 1 1 .1 Manpow er Requir ements ............. ....................... ......... 1 SECTION 2: Instal ler Responsibility ........ ...................... ....... 2 2.1 W all T ag .............. .................... ...................... .............[...]
-
Page 4
[...]
-
Page 5
TABLE OF FIGURES Fi gure 1: Standar d Ref lector ................ ...................... ............... 3 Fi gure 2: One Side R eflect or .... ....................... ...................... .... 4 Fi gure 3: T wo Side Ref lector s .. ....................... ...................... .... 4 Fi gure 4: 45° T ilt Ref lector ..... ......................[...]
-
Page 6
[...]
-
Page 7
SECTION 1: H EATER S AFETY 1 SECTION 1: HEATER SAFETY Y our Saf et y is Impor t ant to Us! This sy mbol is used throughout the manual t o notify you of possib le fir e, electr ical or b ur n hazar ds. Please pa y special at tention when r eading and f ollow ing the warnings in these sections. Installation, service and annual inspection of heater mu[...]
-
Page 8
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 2 SECTION 2: INSTALLER RESPONSIBILITY The installer is r esponsibl e for the f ollowing: • T o install the hea ter , as well as the gas an d electrical supplies, in accor dance w ith applicable specif ications and codes. R ober ts-Gordon recommends the inst aller contact a local Buildin[...]
-
Page 9
SECTION 3: C RIT I C A L C ONSI DERATION S 3 SECTION 3: CRITICAL CONSI DERATIONS 3.1 R equired Clear ances t o Combustibl es Clearances ar e the r equired dist ances that combustib le objects must be awa y from the heat er to pre vent f ire hazar ds. Comb ustible mat erials that ma y catch f ire include common it ems such as wood, paper , r ubber ,[...]
-
Page 10
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 4 NOTE: 1 . All dimensions ar e from the surf ac es of all tubes, couplings and elbows. 2. Clearances B , C and D can be r educed by 50% af ter 25' (7 .5 m) of tubing downstream from wher e the burner and burner tube connect. . F IGURE 2: ONE SIDE R EFLECT OR (inches) (centimet ers) [...]
-
Page 11
SECTION 3: C RIT I C A L C ONSI DERATION S 5 NOTE: 1 . All dimensions ar e from the surf ac es of all tubes, couplings and e lbows. 2. Clearances B , C and D can be r educed b y 50% af ter 2 5' (7 .5 m) of tubing downstr eam from wher e the burner and burner tube connect. F IGURE 5: U-T UBE, STANDARD REF LE CTOR (inches) (centimet ers) M o d e[...]
-
Page 12
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 6 NOTE: 1 . All dimensions ar e from the surf ac es of all tubes, couplings and elbows. 2. Clearances B , C and D can be r educed b y 50% af ter 2 5' (7 .5 m) of tubing downstr eam from wher e the burner and burner tube connect. *When inst alled in the f irst 1 0' (3 m). F IGURE[...]
-
Page 13
SECTION 4: N ATIONAL S TANDARDS AND A PPLICABLE C ODES 7 SECTION 4: NATIONAL STANDARDS AND APPLICABLE CODES 4.1 Gas Codes The type of gas appear ing on the nameplat e must be the type of gas used. Inst allation must comply with national and local codes and requir ements of the local gas compan y . United St ates: R ef er to National F uel Gas Code [...]
-
Page 14
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 8 SECTION 5: HEATER DESCR IPTIONS 5.1 Unitary vs. Multib urner CTHN-Series burners ma y be used f or unitar y heat ers or f or multib ur ner sy st ems. Unitary heaters consist of a sing le burner , a single run of radiant tubing and a single fan assemb ly . See P age 1 4, F i gure 1 3 or [...]
-
Page 15
SECTION 6: M AJOR C OMPONENTS 9 SECTION 6: MA JOR COMPONENTS F IGURE 1 1: Major Component Descri ptions T ube and R eflect or Hanger wi th C l a m p Pa ck ag e P osition this hanger no mor e than 4'' (1 0 cm) aw ay fr om the b ur ner assembly . Coupling A ssembly wi th Lock Ref lector End Cap P unch out cent er section to accommodate t ub[...]
-
Page 16
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 10 SECTION 7: GENERAL SUSPENSION DETAILS T o ensur e your saf ety and comply with the terms of the wa rrant y , all units m ust be installed in accorda nce with these instructions. The ga s or the electrical supply lines m ust not be used to support the heater . Do not locat e the gas or [...]
-
Page 17
SECTION 8: U NITARY L INEAR & U-T UBE H EATER I NSTALLATION 11 SECTION 8: UNITARY LINEAR & U-T UBE HEATER INSTALLATION 8.1 Standar d Parts *C anadian Models: Rubber (T ype 1) Gas Hoses av ailable a s an accessor y . See P age 69, Section 1 6 . T able 1: Contents of CTHN Burner Carton Part No. Descripti on CTHN-40 CTHN-60 CT HN-80 C THN-1 0 [...]
-
Page 18
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 12 T able 3: Component P ackage Guide A dditional tubing length ma y be added to heat er . Any addit ional tubing lengths ar e consider ed as vent length for len gth determination. Maximum v enting length f or unitary heater is 45' (1 3.7 m). F or manif old tubing on multib ur ner sy[...]
-
Page 19
SECTION 8: U NITARY L INEAR & U-T UBE H EATER I NSTALLATION 13 8.2 Unitary Heater R equirements CTHN unitary heater s are typically shipped as a burner pac kage , fan asse mbly and a tube and accessor y pack age. The tube and accessor y pac kages contain e nough tube, r eflect or and hanging par ts for one unit ar y CTHN heater . Elbows , u-tub[...]
-
Page 20
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 14 8.3 Unitary Linear Heater Lay outs F IGURE 1 3: Linear Heater A ssembly Ov erview T ube Ref lector Ref lector End C ap Ref lector Suppor t Burner Coupling U-Clips Burner T ube T ube and Ref lector Hanger T ube Clamp P ack age F an Assembl y T urbulat or (With Select Models)[...]
-
Page 21
SECTION 8: U NITARY L INEAR & U-T UBE H EATER I NSTALLATION 15 F IGURE 1 4: Unitary Linear L ay out O verviews F an Assembly Burner Ref lector T ube T ube/Reflect or Hanger Coupling Assembly LEGEND a = 1 4" (36 cm) ref lector width (not shown) b = 2" (5 cm) end cap to b ur ner/fan c = 2" (5 cm) end cap to hanger d = 7'6"[...]
-
Page 22
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 16 F IGURE 1 5: Unitary Linear L ay out Ov er views (Contin ued) c b de b e e e e c b de b e e e e e c b de b e e e e e e 60' (1 8 m) T ube Length 70' (21 m) T ube Length 80' (24 m) T ube Length f g f g f g[...]
-
Page 23
SECTION 8: U NITARY L INEAR & U-T UBE H EATER I NSTALLATION 17 8.4 Unitary U-t ube Heater Lay outs CTHN-Series heater s (e x cept CTHN-40) are appro v ed for optional u-tube configur ations. The u-tube ma y be installed in either a st andard hori zontal position, 45° position or in an opposit e 45° position as sho wn on P age 5, F igur e 5 th[...]
-
Page 24
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 18 F IGURE 1 7: Unitary U-tube Lay out O verviews c b d f c b de c b de f c b de e c b de e f LEGEND a = 14" (36 cm) ref lector width (not shown) b = 2" (5 cm) end cap to b ur ner c = 2" (5 cm) end cap to hanger d = 7'6" (229 cm) distance fir st hanger e = 1 0&apo[...]
-
Page 25
SECTION 8: U NITARY L INEAR & U-T UBE H EATER I NSTALLATION 19 Step 8.5 Bur ner T ube Installation Step 8.6 T ube Clamp P ackage Installation 7' 6" ± 1' (229 cm ± 25 cm) NO TE: T ubing requir es a down ward slope of 1/2" (1 .3 cm) per 20' (6 m) awa y from b ur ner . S-hook Burner T ube Hanger Of fset mounting hole mus[...]
-
Page 26
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 20 Step 8. 7 Coupling and T ube Assemb ly Step 8.7 .1 Coupling and T ube Assembly (Contin ued) T ube T ube Orient coupling so that the impact bloc k is in the 2:00 or 1 0:00 ocloc k positions. Closed Open Ta b 3" (8 cm) to 4" (1 0 cm) Slide Bar/Coupling Loc k Coupling Wide En[...]
-
Page 27
SECTION 8: U NITARY L INEAR & U-T UBE H EATER I NSTALLATION 21 Step 8.7 .2 Coupling and T ube Assembly (Contin ued) Step 8. 8 T urbulat or Installation 2.3 m .25 m 3 m .25 m Model Radiant T ube Length CTHN-40 1 0' (4.5 m) CTHN-60 20' (6 m) CTHN-80 20' (6 m) CTHN-1 00 30' (9 m) CTHN-125 40' (1 2 m) CTHN-150 40' (1 2[...]
-
Page 28
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 22 Step 8.9 R ef lector Installation H an g e r Bu r ne r Tube Re fl e c t or Description Part Number T ube/Reflect or Hanger 03090 1 00 Burner T ube 03051XXX Ref lector 02750303 NO TE: All radian t tube surf aces must be co ver ed by a r eflect or , e x cept f or a u-tube. Manif old tube[...]
-
Page 29
SECTION 8: U NITARY L INEAR & U-T UBE H EATER I NSTALLATION 23 Step 8. 9.1 Ref lector , U-clip and R ef lector Su ppor t Installation The pict orial dra wings of th e heater construction in Section 8 ar e schematic only and pro vide a general guideline of wher e hangers , ref lector supports and u-clips are t o be installed. T o ensur e proper [...]
-
Page 30
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 24 Step 8.1 0 Burner Installation Step 8.1 1 Fan Inlet Plat e and W arning T ag Lock W asher Gasket Burner Bolt (T orque 1 20 in/lb 1 3.56 Nm) S-hook Burner T ube Burner m ust be installed with the f lame observation windo w facing down. Description Part Number Bolt 9427391 4 Burner 052XX[...]
-
Page 31
SECTION 8: U NITARY L INEAR & U-T UBE H EATER I NSTALLATION 25 Step 8.1 2 Restr ictor Plat e Installation Step 8.1 3 Fan Installation At tach r estrict or plate (see char t belo w right) t o f an inlet and replace inlet collar . Description Part Numb er Restr ictor Plat e 07730XXX Model Fan A ssy . P/N R estrictor Plat e P/N CTHN-40 05220000 07[...]
-
Page 32
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 26 SECTION 9: MULTIBU RNER HEATER INSTALLATION 9.1 Standar d Parts *C anadian Models: Rubber (T ype 1) Gas Hoses av ailable as an accessory . See P age 69, Section 16 . T able 6: Contents of CTHN Burner Carton Part No. Descripti on CTHN-40 CTHN-60 CTHN-80 C THN-1 0 0 CTHN-12 5 CTHN-150 CT[...]
-
Page 33
SECTION 9: M ULT IBU RNE R H EATER I NSTALLATION 27 T able 8: Component P ackage Guid e A dditional tubing length ma y be added to heat er . Any additional tubing le ngths are consider ed as m anif old tube length f or length determination, See P age 29, Section 9.2 thr ough P age 31, Section 9.6 , design r equirement s and allowed man ifold tube l[...]
-
Page 34
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 28 01326801 Reinforcement 01365903 Joint Piece 91406700 1' x 8' (.3 m x 2.4 m) Protective Grille Deco Grille (2' x 4' [.6 m x 1.2 m]) 01365900 Shield Frame 01370408 Reflector Side Extensi on 8" x 48" (20 cm x 122 cm) 01370412 Reflector Side Extensi on 12"[...]
-
Page 35
SECTION 9: M ULT IBU RNE R H EATER I NSTALLATION 29 9.2 Multib urner S yst em Design Requir ements A CTHN multib ur ner sy ste m has a number of radiant tube sections int erconn ected b y manif old tube to a pump t o form a complete s y stem. R eflect ors can be used ov er the manif old tube b ut are not r equir ed. The s yst em design parameter s [...]
-
Page 36
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 30 T able 1 0: Multibur ner Design R equirements * U-tube = 2 elbows 9.3 Burner s P er Pump 1 . The maximu m number of burners per pump is sho wn in Ta b l e 1 1 . 2. When combining dif ferent b urner inputs in a sy ste m, the number of burners p er pump (0' - 2,000' altitude) i[...]
-
Page 37
SECTION 9: M ULT IBU RNE R H EATER I NSTALLATION 31 9.4 Radiant T ube Length The radiant tube length fi xed f or each bur ner is shown on P age 30, T able 1 0 . 9.5 Ma nifold T ube Any tube be yond the radian t tube length is considered manif old. Manifo ld tube can b e used to lengthen tube runs bey ond the radiant tu be length; to connect multipl[...]
-
Page 38
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 32 F IGURE 1 9: Flag L ay out F IGURE 20: Modif ied In-Series Lay out Last T ee Manifold tube bet ween joining tee and pump . Manifold tube bet ween radiant tube ends. Burner fur thest from pump does not need a damper coupling. Fir st T ee Burner P ump Multiple r ows of b ur ners: pump pl[...]
-
Page 39
SECTION 9: M ULT IBU RNE R H EATER I NSTALLATION 33 9.6.2 T and F ork Lay outs and Manif old T ube Length R ules See P age 33, F igure 21 thr ough P age 34, F igure 22 f or diagrams of T and F or k la youts . The T and F or k la youts ha ve a t ee or cross (called the "last t ee" or "last cross") wh ere the comb ustion gases in [...]
-
Page 40
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 34 F IGURE 22: F ork L ay out P ump Manif old tube bet ween joining cross and pump . Last Cross Manif old tube bet ween radiant tube ends. Damper C ouplings located at the end of the ro ws. Burner Radiant T ube T ee (2) Multiple r ows of b ur ners: Manif old tube bet ween the last tee or [...]
-
Page 41
SECTION 9: M ULT IBU RNE R H EATER I NSTALLATION 35 9.6.3 Her ringbone Lay out and Manifo ld T ube Length R ules The herr ingbone la yout is essentially se v eral T la youts stac ked together . Theref ore , the same prin ciple f or manifold tube calcula tion as used f or T la youts is used f or herringbone la youts , with one e x ception. In a herr[...]
-
Page 42
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 36 Step 9.7 Bur ner T ube Installation Step 9.8 T ube Clamp P ackage Installation 7' 6" ± 1' (229 cm ± 25 cm) NO TE: T ubing requir es a down ward slope of 1/2" (1 .3 cm) per 20' (6 m) awa y from b ur ner . S-hook Burner T ube Hanger Of fset mounting hole must b[...]
-
Page 43
SECTION 9: M ULT IBU RNE R H EATER I NSTALLATION 37 Step 9. 9 Coupling and T ube Assemb ly Step 9. 9.1 Coupling and T ube Assemb ly (Continued) T ube T ube Orient coupling so that the impact bloc k is in the 2:00 or 1 0:00 ocloc k positions. Closed Open Ta b 3" (8 cm) to 4" (1 0 cm) Slide Bar/Coupling Loc k Coupling Wide End Coupling T[...]
-
Page 44
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 38 Step 9. 9.2 Coupling and T ube Assemb ly (Continued) Step 9.1 0 T urbulato r Installation 2.3 m .25 m 3 m .25 m Model Radiant T ube Length CTHN-40 1 0' (4.5 m) CTHN-60 20' (6 m) CTHN-80 20' (6 m) CTHN-1 00 30' (9 m) CTHN-125 40' (1 2 m) CTHN-150 40' (1 2 m[...]
-
Page 45
SECTION 9: M ULT IBU RNE R H EATER I NSTALLATION 39 Step 9.1 1 Ref lect or Installation H an g e r Bu r ne r Tube Re fl e c t or Description Part Number T ube/Reflect or Hanger 03090 1 00 Burner T ube 03051XXX Ref lector 02750303 NO TE: All radian t tube surf aces must be co ver ed by a r eflect or , e x cept f or a u-tube. Manif old tube ma y or m[...]
-
Page 46
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 40 Step 9.1 1 .1 Ref lector , U-clip and Ref lector Support Installation The pict orial dra wings of t he heater construction in Section 9 ar e schematic only and pro vide a general guideline of wher e hangers , ref lector supports and u-clips are t o be installed. T o ensur e proper e xp[...]
-
Page 47
SECTION 9: M ULT IBU RNE R H EATER I NSTALLATION 41 Step 9.1 2 Burner Installation Lock W asher Gasket Burner Bolt (T orque 1 20 in/lb 1 3.56 Nm) S-hook Burner T ube Burner m ust be installed with the f lame observation windo w facing down. Description Part Number Bolt 9427391 4 Burner 052XXXXX Lock W asher 9641 1600 Gasket 02568200[...]
-
Page 48
CTHN-S ERIES I NSTALLATION , O PERATION AND S ERVICE M ANUAL 42 SECTION 1 0: OPTIONAL HEATER ACCESSOR I ES 1 0.1 Elbow P acka ge Configur ation Step 1 0.1 .1 Elbow Installation Step 1 0.1 .2 Elbow Installation Step 1 0.1 .3 Ref lector J oint Installation Tube 90° E l b ow C o up l in g Description Part Number Elbow P ackage 0271 8702 90° Elbow 0 [...]