Go to page of
Similar user manuals
-
Headphone
VXi Passport 10V
2 pages -
Stereo Amplifier
VXI Multi-Purpose Amplifier
1 pages 0.13 mb -
Stereo Amplifier
VXI Tuffset Console Amplifier
1 pages 0.04 mb -
Universal Remote
VXI VT1422A
529 pages 8.92 mb -
TV Converter Box
VXI SVM2608
57 pages 0.79 mb -
Music Mixer
VXI VT1536A
16 pages 0.67 mb -
Headphones
VXI Parrott CP100
2 pages 0.17 mb -
Headphones
VXI CP150
2 pages 0.14 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of VXI CT-400, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of VXI CT-400 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of VXI CT-400. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of VXI CT-400 should contain:
- informations concerning technical data of VXI CT-400
- name of the manufacturer and a year of construction of the VXI CT-400 item
- rules of operation, control and maintenance of the VXI CT-400 item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of VXI CT-400 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of VXI CT-400, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the VXI service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of VXI CT-400.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the VXI CT-400 item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
. bus CT-400 C HASSIS T HIRTEEN -S LOT VXI BUS C HASSIS U SER ’ S M ANUAL P/N: 82-0050-000 Released December 21, 2007 VXI Technology, Inc. 2031 Main Street Irvine, CA 92614-6509 (949) 955-1894[...]
-
Page 2
2[...]
-
Page 3
www.vxitech.com CT-400 Preface 3 T ABLE OF C ONTENTS I NTRODUCTION Certifi cation .................................................................................................................. ....................................... 5 Warranty ......................................................................................................[...]
-
Page 4
VXI Technology, Inc. 4 CT-400 Preface S ECTION 3 ................................................................................................................................................................... 47 O PERATION ...........................................................................................................................[...]
-
Page 5
www.vxitech.com CT-400 Preface 5 C ERTIFICATION VXI Technology, Inc. (VTI) certifies that this product met its publ ished specifications at t he time of shi pment from the factory. VTI further certifies that its calibration measurem ents are traceable to the United States National Institute of Standards and Technology (formerly National Bureau of S[...]
-
Page 6
VXI Technology, Inc. 6 CT-400 Preface D ECLARATION OF C ONFORMITY Declaration of Conformity According to ISO/IEC Guide 22 and EN 45014 M ANUFACTURER ’ S N AME VXI Technology, Inc. M ANUFACTURER ’ S A DDRESS 2031 Main Street Irvine, Californi a 92614-6509 P RODUCT N AME Thirteen-Slot VXIbus Chassis M ODEL N UMBER ( S ) CT-400 P RODUCT O PTIONS A[...]
-
Page 7
www.vxitech.com CT-400 Preface 7 G ENERAL S AFETY I NSTRUCTIONS Review the following safety precau tions to avoid bodily injury a nd/or damage to the product. These precautions must be observed during all pha ses of operation or service of this product. Failure to comply with these pr ecautions, or with specific warni ngs elsewhere in this m anual,[...]
-
Page 8
VXI Technology, Inc. 8 CT-400 Introduction W ARNINGS (C ONT .) Use Proper Fuse To avoid fire hazard, only use the type and rating fuse specified for this product. Avoid Electric Shock To avoid electric shock or fire hazard, do not operate this product with the covers removed. Do not connect or disconnect any cable, probes, test leads, etc. while th[...]
-
Page 9
www.vxitech.com CT-400 Preface 9 S UPPORT R ESOURCES Support resources for this product are availa ble on the Internet and at VXI Technol ogy customer support centers. VXI Technology World Headquarters VXI Technology, Inc. 2031 Main Street Irvine, CA 92614-6509 Phone: (949) 955-1894 Fax: (949) 955-3041 VXI Technology Cleveland Instrument Division 5[...]
-
Page 10
VXI Technology, Inc. 10 CT-400 Introduction[...]
-
Page 11
www.vxitech.com CT-400 Introduction 11 S ECTION 1 I NTRODUCTION I NTRODUCTION This section contains a general description of operating features of the CT-400. A l ist of mainfram e features follows the description, which is then foll owed by a brief discussion of the options available for t he CT-400. F IGURE 1-1: CT-400 T HIRTEEN -S LOT M AINFRAME[...]
-
Page 12
VXI Technology, Inc. 12 CT-400 Introduction G ENERAL D ESCRIPTION The CT-400 mainfram e is a C-size, t hirteen-slot, VXIbus com patible mai nframe that conforms fully to VXIbus Specificatio n Revision 1.4. Th e mainframe em ploys a multi-layer backplane to ensure premium VXIbus and VMEbus performance and provi des all power supplies requi red by th[...]
-
Page 13
www.vxitech.com CT-400 Introduction 13 CT-400 M AINFRAME F EATURES F RONT P ANEL F EATURES P OWER S WITCH Feature 1 When elevated, the mainfram e is in standby m ode, where power is supplied to the mainfram e, but not to the VXI modules. When depressed, power is supplied to both m ainframe and VXI modules. V OLTAGE M ONITOR I NDICATORS Feature 2 In[...]
-
Page 14
VXI Technology, Inc. 14 CT-400 Introduction V OLTAGE I NDICATOR LED S The power supply lines are moni tored and displayed on t he front panel, providing inform ation pertaining to the chassis operational st atus. 01 Volt ag e Mo ni tor s +5V +12V +24V + 5 V Stby -5.2V -12V -2 4V -2V CT -40 0 SERI ES VX I MA IN FRAME 123456789 1 0 1 1 1 2 bus V olt [...]
-
Page 15
www.vxitech.com CT-400 Introduction 15 R EAR P ANEL M ONITOR / C ONTROL C ONNECTOR The 25-pin Monitor/Cont rol Connector (see Figure 1-2) provides access to the backplane voltages and other signals. The followi ng table shows a pinout/si gnal list along wi th a brief descri ption of each. Refer to the pin locations in Figure 1-4. T ABLE 1-1: M ONIT[...]
-
Page 16
VXI Technology, Inc. 16 CT-400 Introduction CT-400 S PECIFICATIONS G ENERAL S PECIFICATIONS S IZE 16.7" (424.18 mm ) W x 14.00" (355.60 mm) H x 25.00" D (635.00 m m) Thirteen C-size VXIbus card slots W EIGHT < 50 lb (11.3 kg) VXI BUS V ERSION 1.4 MTBF 100,000 hr MTTR 5 min E NVIRONMENTAL S PECIFICATIONS O PERATING L OCATION This c[...]
-
Page 17
www.vxitech.com CT-400 Introduction 17 P OWER S PECIFICATIONS P OWER Available Useable 1630 W 1000 W DC S UPPLY V OLTAGE A total of 1000 W may be supplied to the m odules with the following max imum c ur re nt s: Voltage Peak Current (I MP ) Dynamic Current (I MD ) +5 V 80 A 15 A -5.2 V 60 A 10 A -2 V 30 A 5 A +12 V 17 A 3 A -12 V 17 A 3 A +24 V 12[...]
-
Page 18
VXI Technology, Inc. 18 CT-400 Introduction 123 45 678 9 1 0 11 12 24.900 (632.46) TOP VIE W 0.805 (20.440) LE FT SIDE VIEW 13.900 (353.06) 0.615 (15.620) * Note: Me asureme nts i n paren t hesis are i n millimeters REAR VI EW FRO NT VIE W 16.699 (424.15) J211 J210 PWS PWS PWS PWS FA N FA N S P E ED HIGH VAR LOW AMB TEMP PWR VOLT CUR SPEED TEMP 01 [...]
-
Page 19
www.vxitech.com CT-400 Introduction 19 CT-400 O PTIONS O PTIONS A DJUSTABLE R ACK M OUNT F LANGES WITH H ANDLES O PTION 100 These allow the mainfram e to be accomm odated into any depth rack - either recessed in the rack up to 10 inches (25.4 cm ) or extended out from t he rack up to 5 inches (12.7 cm). VXI PLUG & PLAY R ACK M OUNT K IT O PTION[...]
-
Page 20
VXI Technology, Inc. 20 CT-400 Introduction F IGURE 1-6: O PTIONS 100 & 106 - M OUNTING F LANGES /H ANDLES & 2U C ABLE T RAY[...]
-
Page 21
www.vxitech.com CT-400 Introduction 21 F IGURE 1-7: O PTION 106 – 2U C ABLE T RAY – R EAR V IEW[...]
-
Page 22
VXI Technology, Inc. 22 CT-400 Introduction F IGURE 1-8: O PTIONS 100, 103 & 106 - M OUNTING F LANGES /H ANDLES , 2U C ABLE T RAY & D OOR[...]
-
Page 23
www.vxitech.com CT-400 Introduction 23 F IGURE 1-9: O PTION 104 - H INGED C USTOM F RONT P ANEL[...]
-
Page 24
VXI Technology, Inc. 24 CT-400 Introduction[...]
-
Page 25
www.vxitech.com CT-400 Installa tion 25 S ECTION 2 I NSTALLATION I NTRODUCTION This section includes i nstructions on CT-400 conf iguration and install ation. When the CT-400 is unpacked from its shi pping carton, the contents shoul d include the following i tems: (1) CT-400 Thirteen-Slot Mai nframe (1) CT-400 User’s Manual (this m anual) (1) Pow[...]
-
Page 26
VXI Technology, Inc. 26 CT-400 Installati on C ONNECTING THE M AINFRAME TO E ARTH G ROUND The CT-400 is configured at the factory for 115 V ac, 60 Hz. The supplied power cord grounding conductor provides adequate grounding for thi s vo ltage and frequency level . However, if the CT-400 is to run at anyt hing higher than 63 Hz, the m ainframe MUST b[...]
-
Page 27
www.vxitech.com CT-400 Installa tion 27 me tal stri p down center of shield guide Front of Mainframe all plastic c ard guide the shield guides are set back 1" from th e card guid es F IGURE 2-2: D ETAIL - C ARD G UIDE / S HIELD G UIDE I NSTALLING THE C ARD S HIELD O PTION Optional card shields are available for improved EM I/RFI performance (s[...]
-
Page 28
VXI Technology, Inc. 28 CT-400 Installati on B ENCH - TOP CT-400 U SE O VERVIEW If the CT-400 is to be used as a bench-top mainfram e, ensure that adequate spacing is provided for the mainfram e for cooling purposes as delineated in the previous sect ion. The mainfram e should be placed in a climate-controlled area, away from su ch elem ents as pre[...]
-
Page 29
www.vxitech.com CT-400 Installa tion 29 R ACK M OUNTING THE CT-400 O VERVIEW This section contains i nstructions for install ing the different rack m ount options availa ble for the CT-400 mainfram e. After install ation of the rack m ount options, the m ainframe can t hen be mounted into an EIA rack. Three different rack mounting opt ions exist fo[...]
-
Page 30
VXI Technology, Inc. 30 CT-400 Installati on O PTION 100 - A DJUSTABLE R ACK M OUNT F LANGES WITH H ANDLES This procedure provides the necessary instruct ions for installing t he adjustable rack mount flanges with handles. Required Tools 1) #2 Phillips Screwdriver 2) T15 Torx ® screwdriver Parts List Item# Qty Description VTI P/N 1 12 Screw, 8-32 [...]
-
Page 31
www.vxitech.com CT-400 Installa tion 31 2x 4x 12x 5 2 4 3 1 F IGURE 2-3: A DJUSTABLE R ACK M OUNT F LANGE I NSTALLATION D IAGRAM[...]
-
Page 32
VXI Technology, Inc. 32 CT-400 Installati on O PTION 101 - VXI PLUG & PLAY R ACK M OUNT K IT This procedure provides the necessary instruct ions for installing a VXI plug& play rack mount kit. Required Tools 1) #2 Phillips Screwdriver 2) T15 Torx screwdriver Parts List Item# Qty Description VTI P/N 1 8 Screw, 8-32 x 5/8" Button Head To[...]
-
Page 33
www.vxitech.com CT-400 Installa tion 33 Mou nting R eceptac le (Suppl i ed By Cu stomer ) 8x 4x 1 4 3 2 F IGURE 2-4: VXI PLUG & PLAY R ACK M OUNT I NSTALLATION D IAGRAM[...]
-
Page 34
VXI Technology, Inc. 34 CT-400 Installati on O PTION 102 - R ACK M OUNT S LIDES Rack mount slides allow the end user the ability to easily access the mainfram e after it has been installed into an EIA rack. This opti on may be used i n conjunction with either Opti on 100 or 101, or maybe instal led and used independently. (R ef er to the previous s[...]
-
Page 35
www.vxitech.com CT-400 Installa tion 35 10x 2x 2x 2x 3 4 2 1 F IGURE 2-5: R ACK M OUNT S LIDE I NSTALLATION D IAGRAM[...]
-
Page 36
VXI Technology, Inc. 36 CT-400 Installati on A DDITIONAL R ACK M OUNT O PTIONS O VERVIEW This section contains the procedures for installing additi onal options for the CT-400. The available rack m ounting options are: Option 103 - Transparent Front Door The transparent front door provides protection of instruments and cables while perm itting the [...]
-
Page 37
www.vxitech.com CT-400 Installa tion 37[...]
-
Page 38
VXI Technology, Inc. 38 CT-400 Installati on O PTION 103 - T RANSPARENT F RONT D OOR I NSTALLATION P ROCEDURE This kit requires Opti on 100 be installed prior t o its instal lation. Refer t o the previous secti on on Option 100 for installa tion instructions. Required Tools 1) #2 Phillips Screwdriver Parts List Item# Qty Description VTI P/N 1 2 Scr[...]
-
Page 39
www.vxitech.com CT-400 Installa tion 39 1 2 3 5 6 2 4 2x 4x 4x 2x F IGURE 2-6: T RANSPARENT D OOR I NSTALLATION D IAGRAM[...]
-
Page 40
VXI Technology, Inc. 40 CT-400 Installati on O PTION 104 - H INGED C USTOM F RONT P ANEL I NSTALLATION P ROCEDURE This kit includes the hardware found in Option 100 as well as the hardware necessary to install the hinged custom front panel. Required Tools 1) #2 Phillips Screw Driver 2) T15 Torx screwdriver 3) 3/8" Open Ended Wrench Parts List [...]
-
Page 41
www.vxitech.com CT-400 Installa tion 41 7) Locate the adjustable hinges. At tach the hinges to the front door usi ng 8-32 x 3/8" pan head Phillips screws. Attach the door to the lower support bracket using the same hardware. 8) Attach the door to the support hi nges using a nylon washer and an 8-32 x 3/8" pan head Phillips screws. 6.5” [...]
-
Page 42
VXI Technology, Inc. 42 CT-400 Installati on O PTION 105/106 - 1U/2U C ABLE T RAYS I NSTALLATION P ROCEDURE The 1U/2U cable trays m ake organizing the cabling associated with the ma inframe and modules more manageable . The cable tray is the sam e both the 1U and 2U version, with only the height of the rear panel differentiating between the two. Re[...]
-
Page 43
www.vxitech.com CT-400 Installa tion 43 Rem ove Side Pl ate S cr e ws (10x ) T o Inst a ll Ca b l e Tra y 1 1 3 3 2 2 5x 5x F IGURE 2-8: 1U (T OP ) AND 2U (B OTTOM ) C ABLE T RAY I NSTALLATION D IAGRAMS[...]
-
Page 44
VXI Technology, Inc. 44 CT-400 Installati on I NSTALLATION OF VXI M ODULES O VERVIEW After the successful installation of rack mount acce ssories, the chassis is r eady for installation of the VXIbus base units (i.e. an SMP1100, SMP1200, etc.). It is recomm ended that the instrum ents be installed after rack mount accessories have been installed to[...]
-
Page 45
www.vxitech.com CT-400 Installa tion 45 D ISCONNECTING THE M AINFRAME To disconnect the CT-400 from its install ation, sim ply follow the i nstructions below: 1) Place the mainfram e in standby by depressing the power switch. 2) Remove the power cord from the mainframe to ensure that no power is running to the main fr ame . 3) Remove all cabling as[...]
-
Page 46
VXI Technology, Inc. 46 CT-400 Installati on[...]
-
Page 47
www.vxitech.com CT-400 Operation 47 S ECTION 3 O PERATION I NTRODUCTION There are no operating instructions required for the CT-400 VXIbus mai nframe. After the mainframe is installed, operation is completely transp arent to the operator. Ju st plug in the instrument s then power up the mainfram e. The power supply lines and m ainframe operat ion a[...]
-
Page 48
VXI Technology, Inc. 48 CT-400 Operation CT-400 M ONITOR B OARD The CT-400 Monitor board provi des monitori ng of the mai nframe’s operati on and environment. It provides the user with access to the seven VXI bus backplane voltages (to power external circuitry), access to the eight b ackplane TTL trigger lines (for i nput and output) a nd control[...]
-
Page 49
www.vxitech.com CT-400 Operation 49 CT-400 M ONITOR B OARD - S IGNALS Connector J210 AMBTEMPOUT – Analog output reflecting the tem p erature of the air entering t he mainfram e. This is a non-linearized signal. See Fi gure 3-3 for a voltage to tem perature conversion. Volt age t o Tem perat ur e Con ver si on 0 5 10 15 20 0 1 0 2 03 04 05 0 6 07 [...]
-
Page 50
VXI Technology, Inc. 50 CT-400 Operation FANSPEEDLOW* - This low true open collector out put signals a power supply over- temperature condi tion. This fault occurs when ei ther of the two fans supplying ai r to the VXI instrument s speed drops below 1000 RPM. This signal is pulled up to +5 V with a 4.7k resistor internally. FANTACH1 - This is a TTL[...]
-
Page 51
www.vxitech.com CT-400 Service Informat ion 51 S ECTION 4 S ERVICE I NFORMATION I NTRODUCTION The CT-400 should operate without t he need for service, except for regular cleaning of the ai r filter elements. The cleaning schedule is dependant upon the am ount of dust in the air, how many hours the unit is operated and how much airfl ow is required [...]
-
Page 52
VXI Technology, Inc. 52 CT-400 Service Information C LEANING THE A IR F ILTERS Two air filters are present on the CT-400: a m odule fan filter and a power supply fan filter. Keeping these filters clean is important in ma intaining an adequate air flow through the mainfram e and over the power supply. The air f ilters can be cleaned in the following[...]
-
Page 53
www.vxitech.com CT-400 Service Informat ion 53 Cleaning the Module Fan Filter 1) Power off the mainfram e and remove the power cord. 2) Locate the metal air filter cover at the bottom half of the mainframe. 3) Remove the four screws holding it in place a nd rem ove the cover and the filter element. 4) Blow the dust and dirt out of the air filter el[...]
-
Page 54
VXI Technology, Inc. 54 CT-400 Service Information P OWER S UPPLY R EPLACEMENT P ROCEDURE In the event that the cooling fans or power supply must be replaced, they are contained in a single, easy to remove module. Replacem ent of the power supply can be accomplished as follows: 1) Power off the mainfram e and remove the power cord. 2) Locate four t[...]
-
Page 55
VXI Technology, Inc. CT-400 Index 55[...]
-
Page 56
[...]
-
Page 57
VXI Technology, Inc. CT-400 Index 57 I NDEX A air filters ............................................................................. 26, 51, 52 cleaning ..............................................................................52, 53 airflow ......................................................................... 12, 16, 26 , 51 B backplane[...]