Weil-McLain -230 manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Weil-McLain -230, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Weil-McLain -230 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Weil-McLain -230. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Weil-McLain -230 should contain:
- informations concerning technical data of Weil-McLain -230
- name of the manufacturer and a year of construction of the Weil-McLain -230 item
- rules of operation, control and maintenance of the Weil-McLain -230 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Weil-McLain -230 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Weil-McLain -230, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Weil-McLain service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Weil-McLain -230.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Weil-McLain -230 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    Part number 550-101-233/0903 • Installation • Star tup • Maintenance • P ar ts This manual must only be used by a qualified heating installer/service technician. Read all instructions, including this manual, the Ultra Control Supplement and the Ultra V ent Supple ment, before installing. P erform steps in the o rder gi ven. Failure to co mp[...]

  • Page 2

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 2 GAS - FIRED W A TER BOILER — Boiler Manual T HE BOILER , WITH Ph Ph Ph Ph Ph D D D D D TECHNOLOGY – H OW IT WORKS . . . PhD PhD PhD PhD PhD technology PhD T e chnology , P r e cision h ydr onic D ata, is an intelligent system that delivers Precision hydronic heating and[...]

  • Page 3

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 3 T HE GAS - FIRED W A TER BOILER , WITH Ph Ph Ph Ph Ph D D D D D TECHNOLOGY[...]

  • Page 4

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 4 GAS - FIRED W A TER BOILER — Boiler Manual Contents The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product. Indicates pr esence o f haz[...]

  • Page 5

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 5 Please read before proceeding Failure to adhere to the guidelines on this page can result in severe personal injury , death or substantial pro pert y damage. When servicing boiler — • T o avoid electric shock, disc onnect electr ical supply before performing maintenance[...]

  • Page 6

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 6 GAS - FIRED W A TER BOILER — Boiler Manual Figure 1 Clearances required P repare boiler location 1 Installations must comply with: Installations must comply with: Installations must comply with: Installations must comply with: Installations must comply with: • Local, st[...]

  • Page 7

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 7 P repare boiler location (continued) 1 Flooring and foundation Flooring The Ultra boiler is approved for installation on combustible flooring, but must never be installed on carpeting. Do not install boiler on carpeting even if foundation is used. Fire can result, causing s[...]

  • Page 8

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 8 GAS - FIRED W A TER BOILER — Boiler Manual Table 1 Corrosive contaminants and sources Prevent combustion air contamination Install air inlet piping for the Ultra boiler as described in the Ultra Boiler V e nt Supple ment. Do not terminate vent/ air in locations that can a[...]

  • Page 9

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 9 Remove boiler from crate Cold weather handling — If boiler has been stored in a very cold location (below 0°F) before installation, handle with care until the plastic components come to room temperature. 1 . The Ultra boiler is generally easier to handle and maneuver aft[...]

  • Page 10

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 10 Figure 2a Installing propane orifice (Ultra-155 and Ultra-230) Prepare for propane if operating on propane — Ultra-155 to -230 Ultra-80: DO NOT apply the following instructions to conversion of Ultra-80 boilers. Follow the instructions provided with the optional propane [...]

  • Page 11

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 11 GAS - FIRED W A TER BOILER — Boiler Manual Prepare boiler (continued) Perform hydrostatic pressure test Pressure test boiler before permanently attaching water or gas piping or electrical supply . Prepare boiler for test 1 . See Figure 3 for reference in following steps.[...]

  • Page 12

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 12 Install water piping 3 Install relief valve 1 . Install relief valve in ¾" street elbow piped from boiler supply piping tee (Figure 3, page 11). Pipe the relief valve only as shown, in the location shown. 2 . Connect discharge piping to safe disposal location, follow[...]

  • Page 13

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 13 GAS - FIRED W A TER BOILER — Boiler Manual Install water piping (continued) 3 Figure 4 Expansion tank piping System water piping methods All piping methods shown in this manual use primary/secondary connection to the boiler loop. These designs ensure proper flow through [...]

  • Page 14

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 14 Install water piping (continued) 3 Figure 6 Pump curves for typical circulators suggested for DHW loop Ta b l e 2 Pipe sizing and head losses for DHW applications (H1=boiler head loss; H2=piping head loss; H3=maximum allowable head loss through water heater based on availa[...]

  • Page 15

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 15 GAS - FIRED W A TER BOILER — Boiler Manual Install water piping (continued) 3 Figure 7 Zone valve zoning plus optional DHW piping Zoning with zone valves 1 . Connect boiler to system as shown in Figure 7 when zone valve zoning. The primary/secondary piping shown ensures [...]

  • Page 16

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 16 Install water piping (continued) 3 Figure 8 Circulator zoning plus optional DHW piping Zoning with circulators 1 . Connect boiler to system as shown in Figure 8 when circulator zoning. The boiler circulator cannot be used for a zone. It must supply only the boiler loop. 2 [...]

  • Page 17

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 17 GAS - FIRED W A TER BOILER — Boiler Manual Figure 9 Typical radiant heating system piping plus optional DHW Radiant heating applications 1 . The Ultra b o iler is ideal for use in radiant heating. The U ltra b o iler’ s unique heat exchanger design allows it to work we[...]

  • Page 18

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 18 Chilled water systems 1 . Install boiler so that chilled medium is piped in parallel with the heating boiler . U se appropriate val ves to preve nt chilled medium from entering boiler . See Figure 10 for ty pical installation of balancing valve and check valve. 2 . The spa[...]

  • Page 19

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 19 V enting , combustion air & condensate line 4 Prepare condensate fittings 1 . Remov e PV C fittings and gasket from the a ccessories bag. 2 . Deburr and chamfer outside and inside of ½" x 1¼" PV C nipple to ensure ev en cement distribution when joining. 3 .[...]

  • Page 20

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 20 GAS - FIRED W A TER BOILER — Boiler Manual Connect condensate drain 1 . Remove condensate trap line from bag. Prepare and install per page 19. Secure to jack et by attaching PV C tee as shown in Figure 13. 2 . Slide trap line onto flue outlet condensate connection and PV[...]

  • Page 21

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 21 Gas piping 5 Connecting gas supply piping 1 . Remove jacket front panel and refer to Figure 15 to pipe g as to boiler . a. Install ground joint union for servicing, when required. b. Install manual shutoff valve in gas supply piping outside boiler jacket when required by l[...]

  • Page 22

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 22 GAS - FIRED W A TER BOILER — Boiler Manual T able 4 Pipe capacity for 0.60 specific gra vity natural gas Gas piping (continued) 5 Natural Gas: Pipe sizing for natural gas 1 . Ref er to T able 4 for pipe length and diameter . Base on rated boiler input (divide by 1,000 to[...]

  • Page 23

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 23 GAS - FIRED W A TER BOILER — Boiler Manual Startup 6 Check/control water chemistry Do not use petroleum-based cleaning or sealing compounds in boiler system. Damage to elastomer seals and gaskets in syst em could occur , resulting in substantial property damage. Before f[...]

  • Page 24

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 24 Startup (continued) 6 Final checks before starting boiler ❏ Read the Ultra Control Supplement to familiarize yourself with Ultra PhD control module operation. Read Operating Instructions in Control Supplement for pr o per steps to start boiler . ❏ V er ify the boiler a[...]

  • Page 25

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 25 GAS - FIRED W A TER BOILER — Boiler Manual Startup (continued) 6 ❏ Check flame & combustion 1 . Press and hold both the Ultra control panel “Mode ” and “+” buttons simultaneously until “H” appears. 2 . T he “H” in the first digit of the display mean[...]

  • Page 26

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 26 GAS - FIRED W A TER BOILER — Boiler Manual Check - out/startup verification 7 ❏ Boiler and heat distribution units filled with water? ❏ W ater c h emistry verified per page 23? ❏ A utomatic air vents, if used, open one full turn? ❏ Air purged from system? ❏ Air[...]

  • Page 27

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 27 Installation certificate Boiler model __________________ CP number ___________ Date installed _______________ Measured Btuh input ____________ Fuel: ❏ Natural Gas ❏ Propane ❏ Installation instructions have been followed. ❏ Check out sequence has been performed. ❏[...]

  • Page 28

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 28 GAS - FIRED W A TER BOILER — Boiler Manual Annual startup and general maintenance Follow the Service and maintenance procedures given throughout this manual and in component literature shipped with the boiler . Fail ure to perform the serv ice and maint enance could resu[...]

  • Page 29

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 29 Annual startup The boiler should be inspected and started annually , at the beginning of the heating season, only by a qualified serv ice t echnician. In addition, the maint enance and care of the boiler designated in T able 5 and explained on the following pages must be p[...]

  • Page 30

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 30 GAS - FIRED W A TER BOILER — Boiler Manual Annual startup (continued) Clean condensate trap 1 . Loosen condensate trap line hose clamps and remove trap line. 2 . Empty water from trap line and inspect. Flush out if needed w ith fresh water . 3 . Check condensate elbow an[...]

  • Page 31

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 31 Inspect ignition electrode 1 . Remove the ignition electrode from the boiler heat exchanger a ccess c ov e r . 2. Remove any white oxides accumulated on the ignition electrode using sandpaper . If the ignition electrode cannot be cleaned satisfactorily , replace ignitor wi[...]

  • Page 32

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 32 GAS - FIRED W A TER BOILER — Boiler Manual Annual startup (continued) 8a Figure 16 Burner assembly Perform startup and checks 1 . Start boiler and perform checks and tests specified on pages 23 through 26 (and Control Supplement). 2 . V e rify cold fill pressur e is corr[...]

  • Page 33

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 33 Maintenance — general 8b Replace boiler jacket front door after startup or servicing Replace boiler jacket front door after start or servicing. The boiler front door must be securely fastened to the boiler to prevent boiler from drawing air from inside the boiler room. T[...]

  • Page 34

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 34 Cleaning boiler heat exchanger (continued from previous page) Access exchanger: Ultra-155, -230, -310 Only 1 . Remove gas valve electrical plug from gas valve. Also remove two electrical molex plugs from blower assembly . 2 . Disconnect gas line union with pipe wrench or C[...]

  • Page 35

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 35 GAS - FIRED W A TER BOILER — Boiler Manual Replacement parts 9 Miscellaneous parts and kits Replace boiler jacket front door after startup or servicing Replace boiler jacket front door after start or servicing. The boiler front door must be securely fastened to the boile[...]

  • Page 36

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 36 GAS - FIRED W A TER BOILER — Boiler Manual Replacement parts (continued) 9 Jacket parts[...]

  • Page 37

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 37 Replacement parts (continued) 9 Jacket parts[...]

  • Page 38

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 38 GAS - FIRED W A TER BOILER — Boiler Manual Replacement parts (continued) 9 Heat exchanger and piping — Ultra-80 & -105[...]

  • Page 39

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 39 Replacement parts (continued) 9 Heat exchanger and piping — Ultra-80 & -105[...]

  • Page 40

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 40 Replacement parts (continued) 9 Heat exchanger and piping — Ultra-155 to -310[...]

  • Page 41

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 41 Replacement parts (continued) 9 Heat exchanger and piping — Ultra-155 to -310[...]

  • Page 42

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 42 GAS - FIRED W A TER BOILER — Boiler Manual 9 Replacement parts (continued) Controls[...]

  • Page 43

    GAS - FIRED W A TER BOILER — Boiler Manual Part number 550-101-233/0903 43 10 Dimensions 1 . Boiler supply and return tappings are both 1" NPT (Ultra- 80/105/155/230) or 1¼" NPT (Ultra-310). See pages 14 through 18 for recommended system supply and return piping sizes. W a ll-hung boilers: water piping and gas pipe can be routed throug[...]

  • Page 44

    Part number 550-101-233/0903 GAS - FIRED W A TER BOILER — Boiler Manual 44 Ratings DOE 1 . A s an Energy Star Partner , W eil-McLain has determined that Ultra boilers meet the Energy Star guidelines for energy efficiency . 2 . Based on standard test procedures prescribed by the United States Department of Energy . 3. Net I=B=R ratings are based o[...]