Weil-McLain 550-141-826/1201 manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Weil-McLain 550-141-826/1201, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Weil-McLain 550-141-826/1201 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Weil-McLain 550-141-826/1201. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Weil-McLain 550-141-826/1201 should contain:
- informations concerning technical data of Weil-McLain 550-141-826/1201
- name of the manufacturer and a year of construction of the Weil-McLain 550-141-826/1201 item
- rules of operation, control and maintenance of the Weil-McLain 550-141-826/1201 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Weil-McLain 550-141-826/1201 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Weil-McLain 550-141-826/1201, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Weil-McLain service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Weil-McLain 550-141-826/1201.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Weil-McLain 550-141-826/1201 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    WGO SERIES 3 OIL-FIRED NATURAL DRAFT WATER BOILER Installer: • Make sure this is the correct manual for the boiler. Verify boiler model on rating label. • Leave all documentation received with boiler and burner with unit for future reference. User: Boiler and burner must be installed and serviced by qualified service technician. Part No. 550-14[...]

  • Page 2

    2 Hazard Definitions The following terms are used to bring attention to the presence of hazards of various risk levels or to important information concerning product life. Indicates presence of hazards that will cause severe personal injury, death or substantial property damage if ignored. Indicates presence of hazards that can cause severe persona[...]

  • Page 3

    3 Read all instructions before installing. Failure to follow all instructions in proper order can cause severe personal injury, death or substantial property damage. Read This Page First . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .[...]

  • Page 4

    Installations must comply with: • U.S. — State and local plumbing, heating and electrical codes. — National codes where applicable. • Canada — Canadian Standards Association, CSA B139, Installation Code for Oil-Burning Equipment. — CSA C22.1 Canadian Electrical Code Part One. — Applicable local or provincial codes. Before selecting bo[...]

  • Page 5

    Provide air for combustion and ventilation: Adequate combustion and ventilation air: • Assures proper combustion. • Reduces risk of severe personal injury or death from possible flue gas leakage and carbon monoxide emissions. Do not install exhaust fan in boiler room. Older buildings with single-pane windows, minimal weather-stripping and no va[...]

  • Page 6

    Place boiler: 1. Remove circulator strapped to pallet. Circulator will be damaged if not removed before boiler is lifted from pallet. 2. Remove boiler from pallet. Do not drop boiler or bump jacket on floor or pallet. Damage to boiler can result. Smaller sized boilers may be top heavy. Use caution when handling to avoid minor personal injury or pro[...]

  • Page 7

    7 Install Packaged Boiler CONTINUED Change From Back Flue Outlet to Top Flue Outlet (Optional) FIGURE 2[...]

  • Page 8

    Fiberglass wool and ceramic fiber materials: • POSSIBLE CANCER HAZARD BY INHALATION • CAN CAUSE RESPIRATORY, SKIN AND EYE IRRITATION This product contains fiberglass wool and ceramic fiber materials. Airborne fibers from these materials have been listed by the State of California as a possible cause of cancer through inhalation. Apply special c[...]

  • Page 9

    3. Non-Packaged WGO-7, 8 & 9 — install flue collector hood (see FIGURE 3): Obtain gas-tight seal to prevent possible flue gas leakage and carbon monoxide emissions, leading to severe personal injury or death. a. Thread tinnerman clip on screw so that clip fits snugly in notch of hold-down lug. Screw must not turn. b. Remove paper on sealing r[...]

  • Page 10

    Perform hydrostatic pressure test: 1. See FIGURE 4 and Control Tapping Table below to install: a. Boiler drain. b. Water pressure gauge (test only). Be sure gauge can handle test pressure. c. Air vent in upper “N” tapping. d. Plugs in remaining tappings. 2. Fill boiler. Vent all air. Pressure test boiler at 1 times working pressure. For boilers[...]

  • Page 11

    For P-WGO and A-WGO boiler: 1. Secure universal mounting flange and gasket to burner mounting door. Use three bolts provided. 2. Secure burner on flange with three bolts. 3. Position burner so end of air tube is level to 1 ½ ° tilt downward. Open door to verify burner position. End of air tube should be flush to ¼ " recessed from inside wal[...]

  • Page 12

    General chimney requirements: • Designed for natural draft firing. Connect boiler to vertical chimney. Insufficient draft can cause flue gas leakage and carbon monoxide emissions, which will lead to severe personal injury or death. • Use vent material approved by local codes for oil-fired burners. In their absence, refer to: — NFPA 31, Instal[...]

  • Page 13

    Connect Breeching CONTINUED Top Outlet Breeching Connection FIGURE 7 Back Outlet Breeching Connection FIGURE 6 Typical Location for Barometric Control (Also see Control Manufacturer’s Instructions) Flue Pipe Bracket (one on each side of pipe) 13 Typical Location for Barometric Control (Also see Control Manufacturer’s Instructions) Flue Pipe Bra[...]

  • Page 14

    General piping information: • If installation is to comply with ASME or Canadian requirements, an additional high temperature limit is needed. Install control in supply piping between boiler and isolation valve. Set control to a minimum of 20°F above set point of combination control. Maximum allowable set point is 220°F. Wire control as shown o[...]

  • Page 15

    Connect Water Piping CONTINUED Piping with DIAPHRAGM Expansion Tank FIGURE 8 Piping with CLOSED Expansion Tank FIGURE 9 15 Isolation Valve Circulator Automatic Air Vent Relief Valve To Diaphragm Expansion Tank and Fittings From System To System “C” Tapping “N” Tapping Isolation Valve Cold Water Fill Isolation Valve From System Isolation Val[...]

  • Page 16

    Piping MULTIPLE ZONES: 1. Follow instructions on page 14 and 15 to install piping near boiler. 2. See FIGURE 10 or 11 to complete installation 3. Zoning with circulators: a. Size each circulator to individual circuit requirements. b. Remove circulator (when furnished as standard equipment). c. Install balancing valves to adjust flow to distribute h[...]

  • Page 17

    Piping for systems requiring temperatures below 140°F: In most systems, this type of piping is not required. If system water temperature requirements are less than 140°F, such as radiant panels or converted gravity systems, use piping as shown in FIGURE 12 or 13. If system piping is plastic without an oxygen barrier, a heat exchanger must be used[...]

  • Page 18

    Use with refrigeration systems: • Install boiler so that chilled medium is piped in parallel with heating boiler. Use appropriate valves to prevent chilled medium from entering boiler. Consult I=B=R Installation and Piping Guides. • If boiler is connected to heating coils located in air handling units where they can be exposed to refrigerated a[...]

  • Page 19

    General wiring requirements: Electric shock hazard. Can cause severe personal injury or death if power source, including service switch on boiler, is not disconnected before installing or servicing. • Installations must follow these codes: — National Electrical Code, ANSI/NFPA 70, latest edition and any additional national, state or local codes[...]

  • Page 20

    Boiler Wiring for Forced Hot Water FIGURE 15 20 Connect Wiring CONTINUED Limit Control Wiring Harness Circulator Wiring Harness (Not Furnished on “A” Boilers) Service Switch On Boiler Burner Wiring Harness Burner Disconnect Plug[...]

  • Page 21

    21 Connect Wiring CONTINUED[...]

  • Page 22

    General oil piping requirements: • Location and installation of oil tanks, oil piping and burners must follow: — NFPA 31, Standard for the Installation of Oil-Burning Equipment. — In Canada, CSA B139, Installation of Oil-Burning Equipment. — Local codes and regulations. — Information provided with burner and fuel pump. • If any part of [...]

  • Page 23

    Follow information below to prevent severe personal injury, death or substantial property damage: • Do not use gasoline crankcase drainings or any oil containing gasoline. See burner manual for proper fuel oil. • Do not attempt to start burner when excess oil has accumulated, when unit is full of vapor or when combustion chamber is very hot. ?[...]

  • Page 24

    Check off steps as completed: ❏ 1. Boiler and heat distribution units filled with water? ❏ 2. Automatic air vent, if used, opened one full turn? ❏ 3. Air purged from system? Piping checked for leaks? ❏ 4. Air purged from oil piping? Piping checked for leaks? ❏ 5. Flue cap in place and tightened? Burner door closed, sealed and nut tight? B[...]

  • Page 25

    Burner adjustments for “P” and “A” boilers: Final burner adjustments must be made using combustion test equipment to assure proper operation. Do not fire boiler without water or sections will overheat. 1. Refer to burner manual for start-up. 2. Allow boiler to heat to design condition. 3. Using combustion test equipment, adjust burner for: [...]

  • Page 26

    Close clearance installation: Substitute these instructions for corresponding material in manual. All other procedures and practices must remain the same. Recommended service and minimum clearances shown on page 4 should be used where possible. Where closer clearances are required: • Top of boiler — If less than 24" available, provide remo[...]

  • Page 27

    PROTECTION REQUIRED FOR CLEARANCES LESS THAN 6 INCHES FROM DOUBLEWALL VENT PIPE* DIMENSION A When desired minimum clearance from type “L” doublewall vent pipe to Use the following combustible surface is: protection**: ½" thick insulation board *** 3" over one-inch glass fiber or mineral wool batts+ 24 gauge sheet metal with 2" o[...]

  • Page 28

    Repair parts must be purchased through Weil-McLain for the specific boiler as indicated in the list below. Results from using modified or other manufactured parts will not be covered by warranty and may damage boiler or impair operation. Parts List Fig. W-M Sales No. Description Part Number A Regular Front Section 7012 316-700-250 B Wide Intermedia[...]

  • Page 29

    29 Parts Drawing D H J N H C G G M L P E G F R Q B A K H H[...]

  • Page 30

    30 30 DIMENSIONS - in. BOILER MODEL NUMBER B L WGO-2 10 1 / 2 13 3 / 4 WGO-3 13 1 / 2 16 7 / 8 WGO-4 13 5 / 8 16 7 / 8 WGO-5 16 7 / 8 20 WGO-6 20 23 1 / 8 WGO-7 23 1 / 8 26 1 / 4 WGO-8 26 1 / 4 29 3 ¼ 8 WGO-9 29 3 / 8 32 1 / 2 DIMENSIONS - mm. BOILER MODEL NUMBER B L WGO-2 266.7 349.2 WGO-3 342.9 428.7 WGO-4 345.9 428.7 WGO-5 428.7 508.0 WGO-6 508[...]

  • Page 31

    31 31 Dimensions CONTINUED 6 1 / 4 [158.8] 29 9 / 16 [750.9] For 7 DIA. [177.8] Vent Pipe Alternate Return (“A” Boilers Only) 7 DIA. [177.8] Intermediate Back[...]

  • Page 32

    Ratings * Substitute “P” for completely assembled packaged boiler without burner (WGO-2 through WGO-6 only). Substitute “A” for boiler only for use with approved burners as listed with I-B=R. ** Available only as an “A” unit. (1) WGO boiler designed with convertible vertical and horizontal flue outlet. (2) MBH refers to thousands of Btu[...]