Go to page of
Similar user manuals
-
Boiler
Weil-McLain GOLD CGt SERIES
3 pages 0.04 mb -
Boiler
Weil-McLain LGB-9
11 pages 0.99 mb -
Boiler
Weil-McLain VHE (Series 2)
11 pages 0.95 mb -
Boiler
Weil-McLain CGA25SPDN
68 pages 3.65 mb -
Boiler
Weil-McLain EG-30 THRU -75
24 pages 4.12 mb -
Boiler
Weil-McLain BMC
32 pages 1.08 mb -
Boiler
Weil-McLain Oil-Fired Water Boiler
4 pages 1.74 mb -
Boiler
Weil-McLain EGH Series 4
4 pages 0.3 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Weil-McLain EGH-125, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Weil-McLain EGH-125 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Weil-McLain EGH-125. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Weil-McLain EGH-125 should contain:
- informations concerning technical data of Weil-McLain EGH-125
- name of the manufacturer and a year of construction of the Weil-McLain EGH-125 item
- rules of operation, control and maintenance of the Weil-McLain EGH-125 item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Weil-McLain EGH-125 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Weil-McLain EGH-125, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Weil-McLain service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Weil-McLain EGH-125.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Weil-McLain EGH-125 item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
Control Supplement Control Supplement Control Supplement Control Supplement Control Supplement EGH EGH EGH EGH EGH Gas-Fired Boiler EGH-105 t o EGH-125 Series 4 Natural gas ‡ P art No. 550-110-677/0299 CSD -1 control system ‡ For propane boilers, install EGH propane conversion kit in addition to following the instructions in this Control Supple[...]
-
Page 2
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 2 The following terms are used throughout this Control Supplement to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product. Indicat[...]
-
Page 3
CSD-1 control system — Natural gas P art Number 550-110-677/0299 3 Carton guide T able 1 Boiler car tons V erify that the correct car tons are av ailable bef ore beginning assemb ly . Note that the Base assembly and T rim & controls car tons for CSD-1 are special. The CSD-1 ignition control panel (in Base assemb ly car ton) consists of igniti[...]
-
Page 4
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 4 Installation I Place the boiler Refer to the EGH Manual. Read Section I and follow all of its guidelines. Complete the following steps of Section I of the EGH Manual: • Placing the boiler • Installati[...]
-
Page 5
CSD-1 control system — Natural gas P art Number 550-110-677/0299 5 Install optional vent damper (if supplied) If not instal ling a vent damper , proc eed to next section ( Piping connections ). Once a vent damper has been operated on an EGH boiler , the boiler will no longer operate without a damper installed. Only dampers listed in the Replaceme[...]
-
Page 6
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 6 P iping connections II Connect steam (water) piping to the boiler per EGH Manual Section II. W ater boilers — make pr ovision for mounting probe low water cut off in the supply or retur n piping, above [...]
-
Page 7
CSD-1 control system — Natural gas P art Number 550-110-677/0299 7 Install boiler controls — steam boilers III Figure 4 Steam boiler connections T able 3 Steam boiler connections 32¾" 23 / " 13 16 (W ater line) 13½" 11¾" 27 / " 5 8 16 / " 3 16 2/" 11 16 1 6/" 5 8 24" C T EG D Return Supply risers [...]
-
Page 8
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 8 Gas piping V Size and connect gas supply piping per EGH Manual , Section V . The gas supply can enter from either the right or left side of the jacket. Be sure the gas train is directed to the correct sid[...]
-
Page 9
CSD-1 control system — Natural gas P art Number 550-110-677/0299 9 General The following sequence of operation applies to all wiring diagrams in this Supplement — both water and steam. Call for heat On a call for heat (from thermostat or operating control): 1 . Limit control and water level control contacts are assumed closed. 2 . V ent damper [...]
-
Page 10
P art Number 550-110-677/0299 10 o NOTES: TO COMPONENT MANUF ACTURER’S INSTR UCTIONS FOR APPLICA TION WIRING AND FOR MUL TIPLE ZONE SYSTEMS USING ZONE V AL VES OR CIRCULA TORS , REFER 5. THERMOST A T - FOR SINGLE ZONE SYSTEMS, THERMOST A T ANTICIP A TOR SETTING IS 0.40 AMPS . 4. REFER T O CONTROL COMPONENT INSTR UCTIONS P ACKED WITH BOILER FOR AP[...]
-
Page 11
P art Number 550-110-677/0299 11 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement NOTE 10 TERMINAL BLOCK 1 2 A 1 A 2 W JUNCTION BO X EQUIPMENT GROUND (BY OTHERS) (NOTE 7) CIRCULA T OR N (NOTE 9) W Y H SWITCH SER VICE C WIRE NUTS (3) W BK Y BK G Y G[...]
-
Page 12
P art Number 550-110-677/0299 12 MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK 677-02 1 2 3 4 5 6 10 8 9 11 12 14 15 15 16 17 18 19 20 24 21 25 21 22 23 7 V ent connections — Connect with ¼" tubing and run vent line outside building per code requirements. Install strain relief bushin[...]
-
Page 13
P art Number 550-110-677/0299 13 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement 1 CSD-1 control panel 14 Pilot shutoff valv e 2 Ignition control 15 Leak test v alv es with plugs 3 Impulse rela y and lighted push-b utton alarm silencing s witch 16[...]
-
Page 14
P art Number 550-110-677/0299 14 o NOTES: TO COMPONENT MANUF ACTURER’S INSTR UCTIONS FOR APPLICA TION WIRING AND FOR MUL TIPLE ZONE SYSTEMS USING ZONE V AL VES OR CIRCULA TORS, REFER 5. THERMOST A T - FOR SINGLE ZONE SYSTEMS, THERMOST A T ANTICIP A T OR SETTING IS 0.40 AMPS. 4. REFER T O CONTROL COMPONENT INSTR UCTIONS P ACKED WITH BOILER FOR APP[...]
-
Page 15
P art Number 550-110-677/0299 15 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement NO TE 10 TERMINAL BLOCK 1 2 A 1 A 2 W JUNCTION BO X EQUIPMENT GROUND (BY O THERS) (NO TE 7) N H SWITCH SER VICE C WIRE NUTS (2) W BK G Y G BK BK D AMPER TO BK R TRANS[...]
-
Page 16
P art Number 550-110-677/0299 16 MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK 677-01 1 2 3 4 5 6 10 8 9 11 12 14 15 15 16 17 18 19 20 21 22 23 24 25 25 26 27 Install strain relief bushings wherev er electr ical wiring passes through jack et. 7 V ent connections — Connect with ¼" tub[...]
-
Page 17
P art Number 550-110-677/0299 17 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement 1 CSD-1 control panel 14 Pilot shutoff valv e 2 Ignition control 15 Leak test valves with plugs 3 Impulse rela y and lighted push-b utton alarm silencing s witch 16 G[...]
-
Page 18
P art Number 550-110-677/0299 18 o NOTES: TO COMPONENT MANUF ACTURER’S INSTR UCTIONS FOR APPLICA TION WIRING AND FOR MUL TIPLE ZONE SYSTEMS USING ZONE V AL VES OR CIRCULA TORS, REFER 5. THERMOST A T - FOR SINGLE ZONE SYSTEMS, THERMOST A T ANTICIP A T OR SETTING IS 0.40 AMPS. 4. REFER T O CONTROL COMPONENT INSTR UCTIONS P ACKED WITH BOILER FOR APP[...]
-
Page 19
P art Number 550-110-677/0299 19 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement NO TE 10 TERMINAL BLOCK 1 2 A 1 A 2 W JUNCTION BO X EQUIPMENT GROUND (BY O THERS) (NO TE 7) N H SWITCH SER VICE C W BK G Y G BK BK D AMPER TO BK R TRANSFORMER 120/24 [...]
-
Page 20
P art Number 550-110-677/0299 20 MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK 677-01-p 1 2 3 4 5 6 7 10 8 9 11 12 14 15 15 16 17 18 19 20 21 22 25 25 26 27 23 24 Install strain relief bushings wherev er electr ical wiring passes through jack et. V ent connections — Connect with ¼" tubing and run vent line outside building per code re[...]
-
Page 21
P art Number 550-110-677/0299 21 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement 1 CSD-1 control panel 14 P ilot shutoff v alv e 2 Ignition control 15 Leak test valv es with plugs 3 Impulse rela y and lighted push-b utton alarm silencing s witch 1[...]
-
Page 22
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 22 Final adjustments VII 1 . Follow EGH Manual instructions for Final Adjustments , Section VII, including filling the boiler and skimming steam boilers. Skimming the boiler as described in Section VII of t[...]
-
Page 23
CSD-1 control system — Natural gas P art Number 550-110-677/0299 23 Final adjustments — operating instructions VII Figure 11 Operating instructions[...]
-
Page 24
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 24 Check - out procedure — operation VIII Always follow boiler Operating instructions , Figure 11, when starting the boiler . F ailure to do so could r esult in sev ere personal injury , death or substant[...]
-
Page 25
CSD-1 control system — Natural gas P art Number 550-110-677/0299 25 Check - out procedure — leak test VIII 677-11 1 2 4 3 T o control panel Fo r your safety , turn off electrical power supply before making any electrical connections to avoid possible shock hazard. 1 . T urn off p owe r to the boiler and rem ove the (RED) wire from terminal TH o[...]
-
Page 26
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 26 Check - out procedure — troubleshooting VIII V erify proper operation after servicing Never jumper (bypass) any device except for momentary testing as outlined in T roubleshooting Char ts. Substantial [...]
-
Page 27
CSD-1 control system — Natural gas P art Number 550-110-677/0299 27 Check - out procedure — troubleshooting VIII VISU ALL Y CHECK — Is ground wire connected from GND (Burner) to ignition control mounting screw , and ground wire connected from transf or mer ter minal C to case ground? Correct by making connections . Is 24V A C present across t[...]
-
Page 28
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 28 Check - out procedure — troubleshooting VIII Is damper harness securely plugged in at both ends? Secure connections . Is 24V A C present across transf ormer ter minals C & Y ? Check f or open ther [...]
-
Page 29
CSD-1 control system — Natural gas P art Number 550-110-677/0299 29 Check - out procedure — troubleshooting VIII Set up microammeter to measure output current in flame sensor circuit as f ollows . a . Detach sense lead from ignition control. Attach negative lead from microammeter to sense terminal on ignition control. b . Attach positive lead t[...]
-
Page 30
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 30 Check - out procedure — troubleshooting VIII Are pilot valv e wir ing connections CORRECT and securely fastened? Connect securely to terminal PV on ignition control and terminal TR on main gas valve . [...]
-
Page 31
CSD-1 control system — Natural gas P art Number 550-110-677/0299 31 Service and maintenance IX Complete Installation and Service Certificate in EGH Manual , Section IX. Fol l ow EGH Manual , Section IX, fo r serv ice and maintenanc e of boiler .[...]
-
Page 32
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 32 Replacement parts — water boilers X Figure 14 W ater boiler assembl y MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK 677-12 1 2 5 6 10 9 11 12 1[...]
-
Page 33
CSD-1 control system — Natural gas P art Number 550-110-677/0299 33 T able 5 W ater boiler replacement par ts Before r eplacing any parts on the boiler — T urn off power to boiler and shut off g as supply . Failure t o comply c ould result in sev ere personal injury , death or substantial propert y damage. Item Part description Boiler models Ve[...]
-
Page 34
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 34 Replacement parts — steam boilers X Figure 15 Steam boiler assembly MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK 677-13 1 2 5 6 10 9 11 12 13 [...]
-
Page 35
CSD-1 control system — Natural gas P art Number 550-110-677/0299 35 T able 6 Steam boiler replacement par ts Before r eplacing an y parts on the b oiler — T ur n off power t o boiler and shut off gas supply . Failure to c omply could result in sev ere personal injury , death or substantial propert y damage. Item Part description Boiler models V[...]
-
Page 36
EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 36 W eil-McLain 500 Blaine Street Michigan City , IN 46360-2388 http://www .weil-mclain.com[...]