Go to page of
Similar user manuals
-
Boiler
Weil-McLain Series 1
2 pages 0.19 mb -
Boiler
Weil-McLain 550-110-260/0508
64 pages 8.23 mb -
Boiler
Weil-McLain CGA25SPDN
68 pages 3.65 mb -
Boiler
Weil-McLain LGB 6-20 Series
11 pages 1.84 mb -
Boiler
Weil-McLain EGH-105
36 pages 0.88 mb -
Boiler
Weil-McLain Series 1 Boiler
28 pages 2.59 mb -
Boiler
Weil-McLain LGB-6
11 pages 0.99 mb -
Boiler
Weil-McLain GV-6 510-811-615
2 pages 0.06 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Weil-McLain LGB 6-20 Series, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Weil-McLain LGB 6-20 Series one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Weil-McLain LGB 6-20 Series. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Weil-McLain LGB 6-20 Series should contain:
- informations concerning technical data of Weil-McLain LGB 6-20 Series
- name of the manufacturer and a year of construction of the Weil-McLain LGB 6-20 Series item
- rules of operation, control and maintenance of the Weil-McLain LGB 6-20 Series item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Weil-McLain LGB 6-20 Series alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Weil-McLain LGB 6-20 Series, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Weil-McLain service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Weil-McLain LGB 6-20 Series.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Weil-McLain LGB 6-20 Series item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
P art Number 550-141-816/0798 Contents I . New installation .......... 2 II . Existing installation .... 4 III. Water and steam trim components .................. 4 IV. Gas piping ................... 5 V. Wiring ........................... 5 Sequence of operation ..... 8 Wiring procedure .............. 8 VI. Leak test procedure ... 1 0 VII. Operati[...]
-
Page 2
P art Number 550-141-816/0798 2 LGB -6 to LGB -20 Ser ies 2 – Control S upplement I New installation 1 . R emove all bu r ners from base bo x assembly . Remo ve 3.95 mm natural gas main burner orifices in manifold. Install 2.40 mm propane gas main burner orifices. Use pipe dope sparingly only on male ends. Use pipe dope compatible with propane ga[...]
-
Page 3
P art Number 550-141-816/0798 3 CSD-1 Control System – Propane gas Figure 1 Pilot burner assembly , typical Figure 2 Main flame sensor assembly I New installation – continued[...]
-
Page 4
P art Number 550-141-816/0798 4 LGB -6 to LGB -20 Ser ies 2 – Control S upplement 1 . These instructions are for use with Propane Control Cartons as listed in Gas Control Arrangement, T able 2 (page 2). 2 . Remove jacket door(s) and access panel(s). 3 . Disconnect wiring and tubing from existing pilot burner and main flame sensor . 4 . Remove all[...]
-
Page 5
P art Number 550-141-816/0798 5 CSD-1 Control System – Propane gas IV Gas piping 1 . Contact gas supplier to siz e pip es, tanks and regulator . a. Inlet gas pressure to manual main shut-off gas valve — minimum 11” W .C., maxim um 13” W .C. b. If pressure to gas valv e exc eeds 13” W .C., install 100% lock-up gas pressure regulat or upstr[...]
-
Page 6
Part Number 550-141-816/0798 6 LGB-6 to LGB -20 Series 2 – Control Supplement P art Number 550-141-816/0798 7 CSD-1 Control System – Propane gas Figure 3 Wiring diagram SENSOR MAIN FLAME FIRING RATE CONTROL (WHEN USED) STAGE COMBINATION VALVE W/REGULATOR MAIN GAS VALVE - TWO MAIN GAS VALVE TERMINAL. FIELD WIRED TO GAS VALVE OR FIRING IGNITION C[...]
-
Page 7
P art Number 550-141-816/0798 8 LGB -6 to LGB -20 Ser ies 2 – Control S upplement 1 . Operating control begins startup sequence. a. Limit control contacts are closed. 2 . Pilot proving module energized. a. Pilot solenoid opens. b. Pilot ignition spark begins. c . Pilot ignites. d. Pilot proves. 3 . Main flame proving module energized from pilot p[...]
-
Page 8
P art Number 550-141-816/0798 9 CSD-1 Control System – Propane gas Figure 5 Field wiring diagram[...]
-
Page 9
P art Number 550-141-816/0798 10 LGB -6 to LGB -20 Ser ies 2 – Control S upplement 1 . Remove red (MV) and blue (PV) wires from main gas valve. 2 . Close main test firing valve attached to the manifold. 3 . Check that both leak test valves are closed and remove plugs. 4 . Attach manometer to first leak test valve. 5 . Open first leak test valve a[...]
-
Page 10
P art Number 550-141-816/0798 11 CSD-1 Control System – Propane gas This document is intended only as a supplement to the LGB Gas-Fired Boiler Manual . Follow all instructions in the Manual, including those regarding start-up (found in Section VIII, “Placing boiler in operation ”). A . This boiler is equipped with a pilot which must be lighte[...]
-
Page 11
P art Number 550-141-816/0798 12 LGB -6 to LGB -20 Ser ies 2 – Control S upplement W eil-McLain 500 Blaine Street Michigan City , IN 46360-2388 http://www .weil-mclain.com VIII P arts list Figure 6 Ref . No. Descri ption Size Vendor /Part Nu mber Weil- McLain P art Number 1 Main flame sen sor Honeyw ell 392956 511-724- 274 Main bur ner with pilo [...]