Go to page of
Similar user manuals
-
Power Supply
Xantrex Technology XDC 20-300
284 pages 6.29 mb -
Battery Charger
Xantrex Technology 30
48 pages 0.55 mb -
Battery Charger
Xantrex Technology MS3000
2 pages 0.61 mb -
Battery Charger
Xantrex Technology XC3012
80 pages 1.23 mb -
Network Card
Xantrex Technology SW Communications Adapter
36 pages 0.71 mb -
Battery Charger
Xantrex Technology SW4024
8 pages 0.75 mb -
Battery Charger
Xantrex Technology TC40+
80 pages 0.63 mb -
Battery Charger
Xantrex Technology 10A12V
66 pages 0.53 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Xantrex Technology STXR2500, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Xantrex Technology STXR2500 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Xantrex Technology STXR2500. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Xantrex Technology STXR2500 should contain:
- informations concerning technical data of Xantrex Technology STXR2500
- name of the manufacturer and a year of construction of the Xantrex Technology STXR2500 item
- rules of operation, control and maintenance of the Xantrex Technology STXR2500 item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Xantrex Technology STXR2500 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Xantrex Technology STXR2500, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Xantrex Technology service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Xantrex Technology STXR2500.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Xantrex Technology STXR2500 item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
Xantrex Sun Tie XR STXR1500 STXR2500 Installatio n and Op erati on Guide[...]
-
Page 2
Sun Tie XR Installation and Operation Guide[...]
-
Page 3
About Xant rex Xantrex T echnology Inc. is a world-leading supp lier of advan ced power electronics and controls with prod ucts from 50 watt mobile units to one MW utility-scale systems for wind, solar , batteries, fuel cells, microturbines, and backup power applications in b oth grid-connected and stand-alone systems. Xantrex pro ducts include inv[...]
-
Page 4
About This Guide Purpos e The Sun T i e XR In stallation and Operation Gui de contai ns information f or a qualifie d instal ler and authori zed service pe rson to inst all, oper ate and t r oubl eshoot the Xantr ex Sun T ie XR. Scope The guide p r ovide s safety guidelin es, installation , operati on, troubleshooting, and warr anty i nforma tion f[...]
-
Page 5
About T his Gu ide ii 975-0053-01-01 Organization This guid e is organi zed into four chapters a nd two append ixes: Chapter 1 , “Introduct ion” , ou tlines t he main performanc e and safet y featur es of the Sun Ti e XR. Readi ng this c hapter will giv e you a cle a r underst anding of the inv erter ’ s capabili ties. Chap ter 2, “Ins tall[...]
-
Page 6
About T h is Guide 975-0053-01-01 iii Rela ted Info rmation Y ou can fi nd more information a bout Xantrex T echnology Inc. and its products and services at www .xantrex .com Note: Notes des cribe additional information which may add t o your underst a nding of how to install or use th e Sun T ie XR.[...]
-
Page 7
iv 975-0053-01-01[...]
-
Page 8
1 Introduction Abo ut the Su n Tie X R- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–2 Stan dard Fe ature s - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–3 Acce ssori es - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -[...]
-
Page 9
Conte nts vi 975-0053- 01-01 Facto rs Af fecting Sun T ie XR P erform ance - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 –10 PV Arr ay Fa ctors - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–10 Othe r Facto rs - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -[...]
-
Page 10
Important Safety Instructions For safe i nstallat ion and opera tion: • All e lectric al work must be d one in a ccordance with local a nd nationa l electric al codes. • Before in stalling or u sing this d evice, read all in structions and ca utionary markings located in the manual, on t he Sun T ie XR and on the PV array . W ARN ING: SA VE TH [...]
-
Page 11
Important Safety Instructions viii 975-0053-01-01 • Do not expose th is unit to rain, snow o r liquid s of any type wi thout the Rain Shield install e d. The Rain Shie ld does not, ho wever , make the Sun T ie XR water proof. • T o reduc e the ch ance of short ci rcuit s when instal ling or worki ng wit h the inve rter or the PV ar ray , use in[...]
-
Page 12
Introduction Chapter 1, “Introduction” , describes the standard feat ures and accessorie s for the Sun T i e XR.[...]
-
Page 13
Introduction 1–2 975-0053-01-01 About the Sun Tie XR The Xantre x Sun T ie XR grid- connect s olar inverter is desig ned to convert a home or business into a “green” po w er g eneratin g station. The Sun T ie XR conver t s so lar electric (photovolta ic, or PV) power i nto utili ty-grade electricit y that can be used by the home or sold to th[...]
-
Page 14
About the Sun Tie XR 975-0053-01-01 1 – 3 Standard Features All-in- one desig n All nece ssary DC input a nd AC output c onnections, disc onnects an d circui t breaker s are housed with in the Sun T ie XR’ s eas ily inst alled, compact en closure. A built -in LCD display panel provides e asy-to-read system st atus and daily c umulative ener gy [...]
-
Page 15
1 – 4 975-0053-01-01[...]
-
Page 16
Installation Chapter 2, “I nstallatio n” provides information about planning for and installing the Sun T ie XR. It contains information to help you plan wire routes, AC and DC connections, and find a suitable location for installation. It also discusses requirements for grounding the Sun T ie XR and your PV array . This chapter then provides p[...]
-
Page 17
Installation 2 – 2 975-0053-01-01 Installation Planning Overview Before yo u begin to insta ll the Sun T ie XR you need to consider the followi ng: • tools r e quir ed • hardware and material s require d • mounti ng locati on • routes for AC and DC wir ing • AC and DC co nnection wi re size r equiremen ts • groundin g requirements •[...]
-
Page 18
Installation Pl anning 975-0053-01-01 2 – 3 Locating the Sun Tie XR The S un T ie XR shou ld be installe d in lo catio ns th at meet the f ollowi ng requir ements: Routing the wires T ypical configu rations Determine all wire route s to and fr om the Sun T ie XR. T ypical rout ing configur ations include : • AC wiring f rom the Sun T ie XR to t[...]
-
Page 19
Installation 2 – 4 975-0053-01-01 All wiri ng and inst allation method s should conform t o applica ble electr ical and buildi ng codes. Conduit ho les Pre-pla n the wire and cond uit runs. Knock outs for c onduit holes ar e locate d on the bottom of t he unit. Se e Figure 2- 9 . Acceptabl e wire siz es The DC termi nal blocks in the Sun T ie XR [...]
-
Page 20
Installation Pl anning 975-0053-01-01 2 – 5 A C circuit breaker r equirements The main se rvice panel must dedicate a 15 amp min imum, double pole breaker (120/240 volts AC) to operat e the Sun T ie XR. Planning DC Connection s DC connecti ons incl ude all the wire s and connec tors between your PV array a nd the Sun T ie XR’ s combiner boar d.[...]
-
Page 21
Installation 2 – 6 975-0053-01-01 F igure 2-1 Combiner b oard with PV array wiring to in dividual termin al connections F igure 2-2 Combiner board with PV array wiring to b ypass terminals Ground ing Requirements AC groundin g The Sun T ie XR must be conn ected to a grounded, pe rmanent wir i ng syste m. PV Arr ay Fuses (F1 to F6) Negative PV Arr[...]
-
Page 22
Installation Pl anning 975-0053-01-01 2 – 7 DC groundin g The negative PV conductor must be bond ed to the groundin g system at only one p oint in the s ystem. See Figur e 2-3 for the locatio n of the Sun T ie XR ground bar . The size f or the conduc tor is u sually based on the size of the l arg est conductor in the DC system. Nega tive/gr ound [...]
-
Page 23
Installation 2 – 8 975-0053-01-01 Note: The MPP T algorith m does not work with wind power or batter ies. CA UTION Although t he nominal volta ge range suggests that you c an use string s of five modules in serie s, this i s not safe for the u nit, as the PV array may ex ceed the invert er ’ s maximum input (120 VDC). W ARN ING: SHOCK HAZARD Wh[...]
-
Page 24
Inst alla tion 975-0053-01-01 2 – 9 Installation Overview Instal lation steps There are four main st eps in the insta llation of th e Sun T i e XR: 1. Mounting t he unit 2. Making the DC connectio ns from the PV arra y to the Sun T ie XR 3. Making the AC connections fro m the ser vice utilit y panel to the Sun T ie XR 4. Grounding the PV array Th[...]
-
Page 25
Installation 2 – 10 975-0053-01-01 T o mount the Sun T ie XR: 1. L ocate the ar ea wh ere th e Sun Tie XR is t o be in stall ed. In stall ing it as clos e to the utilit y servic e panel as possi ble is recommended. Th e bottom of the unit must be at least 36 inches from the floor or gr ound when mounted . 2. Using a l e vel, pl ace the mounting b[...]
-
Page 26
Inst alla tion 975-0053-01-01 2 – 11 F igure 2-4 Br ack et mounting Wall bra c ket, screws, and w ashers (s upplied) Mount 70 inches (minim um) from ground F igure 2-5 Enclosure mounting Enclo sure mo unt ed on w all br acke t Scre w holes 8 55/64 " 3.20" 26 21/ 32" 19/64" 9 41/64 " 4 13/16" Sun T ie XR enc losure l [...]
-
Page 27
Installation 2 – 12 975-0053-01-01 F ig ure 2-6 Externa l cover compon ents Upper co ver Remove sc rews (one on ea ch side) External breaker c over (remove dur ing install ation)[...]
-
Page 28
Inst alla tion 975-0053-01-01 2 – 13 F igure 2-7 Inner break er cover F i gur e 2-8 Mount ing holes Locking tabs Lift up an d pull forward t o remove Remove b reaker screw s remove breaker co ver grounding screw Internal m ounting holes PV combiner b oard[...]
-
Page 29
Installation 2 – 14 975-0053-01-01 F i gure 2 -9 Bott om hol e condui t loca tions (bot tom view) 3 3 8 1 8 (2X ) 2 3 4 (2X) 7 8 2 5 8 1 2 10 3 8 1 3 8 3 4 5 1 2 10 3 8 3 8 3 1 8 4 3 8 7 5 8 8 7 8 3 4 1 1 5 8 all dime nsions are i n inches front of inverte r[...]
-
Page 30
Inst alla tion 975-0053-01-01 2 – 15 Connecting DC Wiring Fuse requ irements The combine r board in the Sun Tie XR ac cepts up to six i ndividual PV array c ircuits (positive and n egative wi res). Each ci rcuit on the combiner board con tains a fuse to protect agains t over-cu rrent. Always repl ace this fuse wit h one of the same t ype and rat [...]
-
Page 31
Installation 2 – 16 975-0053-01-01 4. Connect t he negati ve (–) wire f rom the PV arr a y to t he PV MINUS 1 (leftm ost) term inal. C heck th at the wire i s in the proper locat ion an d tighte n the screw . 5. Repeat t his procedure for each PV array circu it, connec ting the #2 PV positi ve wire to the te rminal la beled PV PLUS 2, and so on[...]
-
Page 32
Inst alla tion 975-0053-01-01 2 – 17 T o wire the main utility panel to the Sun T ie XR: 1. Run conduit from the main uti lity bre aker pane l to the lower se ction of the Su n T ie XR. Run the two HOT wires (L1 a nd L2) and gr ound through t he conduit and i nto the Sun Tie XR’ s lower s ection. Metal conduit is highly recommend ed. 2. Instal [...]
-
Page 33
Installation 2 – 18 975-0053-01-01 Grounding the System PV groundin g The Sun T ie XR is des igned to have all PV pos itive, n egative and gr ound conducto rs connected ins ide its access area. The PV e quipment ground should be conn ected to the Sun T ie XR ground bar . This ground bar must also be conn ected to the main util ity breaker panel ?[...]
-
Page 34
Inst alla tion 975-0053-01-01 2 – 19 Required additional groundin g If the PV array is loca ted a considera ble distance ( over 100 feet) from the Sun T ie XR, then an additi onal groun d rod must be insta lled clo se to the PV array f or the most reliabl e light ning prote ction, as shown in Figure 2- 13 . The grounde d frame of the PV ar ray pr[...]
-
Page 35
Installation 2 – 20 975-0053-01-01 F igure 2-13 Long dis tance groun ding F igure 2-14 Simplified electric al wiring diagram ST Unit Main Utility Breaker Panel Utility Mete r Sola r Arr ay DC Wi ring (and gr ound) AC Wiri ng Array Gr ound Ro d Utili ty Gr ound Rod Utili ty Gr ound W ire Ground Bar Ground Bar > 100 f eet ( 30 m) Array Gr ound W[...]
-
Page 36
Inst alla tion 975-0053-01-01 2 – 21 Connecting Inverters in P arallel Reasons a nd requir ements Sun T ie XR inverte r s may be connected in a pa rallel confi guration to harvest additional ene rgy f r om the sun. In this c onfigura tion, a separat e solar a r ray i s requir ed for ea ch Sun T ie XR unit. The output of each Sun T ie XR feeds a d[...]
-
Page 37
Installation 2 – 22 975-0053-01-01 Installing the Optional Remote Monitor Remo te Moni tor functi on The opti onal Remote Monitor provides addi tional functions which a re not direct ly avail able on the front panel LCD di splay . It can be mounted in a more acce ssible l ocation such as t he garage , kitchen, l iving room, and so on. Refer to th[...]
-
Page 38
Inst alla tion 975-0053-01-01 2 – 23 T o wire the Remote Monitor to the Sun Tie XR: 1. Route the Remote Monitor ’ s six-conducto r cable separate f rom the other wi ring to pr event noise and i nterfer ence fro m being intr oduced into the data cable. Refer t o Figure 2-17 and Figu re 2-18 . The connecto r is located i n the up per right -hand [...]
-
Page 39
Installation 2 – 24 975-0053-01-01 F igure 2-18 Remote Monitor connection a nd cable Route Remote Monitor cable away from AC and DC wires Remote Mo nitor conne ction CPU boar d (cover remo ved for clari ty)[...]
-
Page 40
Oper ation Chapter 3, “Operation” provides procedure s for starting up and operating the Sun T ie XR. It also explains the messages that appear on the front panel display . The chapter ends with informat ion about factors that affect how much power the Sun T ie XR can gath er from the PV arra y and deliver to t he utility grid.[...]
-
Page 41
Operation 3 – 2 975-0053-01-01 Startup Pr ocedure S tarting up the Sun T ie XR requires se veral steps. Y ou wi ll need t o: 1. Check the PV array DC vol tage. 2. Check the AC utility voltage. 3. S tart up the Sun T i e by s witching o n the DC and AC circ uit break ers inside the unit. 4. Reassemble the Sun T ie XR and repl ace the ext ernal co [...]
-
Page 42
Startup Procedure 975-0053-01-01 3 – 3 Checking the AC U tility V oltage T o check the AC ut ility voltage : 1. Switch on t he main 240 V brea kers in th e building’ s electri cal service panel. 2. Ensure al l circuit br eakers lo cated in the Sun T ie XR unit are i n the of f (down) positio n. 3. Using an AC vo ltmeter , measure the AC o pen c[...]
-
Page 43
Operation 3 – 4 975-0053-01-01 Starting up the Sun Tie XR T o s tart u p the in vert er: 1. Switch on the 10 0-amp DC cir c uit breaker l ocated in the Sun T ie XR unit. Thi s breaker suppli es the DC powe r from the PV arra y to the Sun Tie uni t. Refe r to Figure 3-3 , item 1. 2. Switch on the 1 and 100 amp (ganged) PVGFP breaker s. These break[...]
-
Page 44
Startup Procedure 975-0053-01-01 3 – 5 Monitoring the Front P anel Display During startup Durin g startup, t he invert er ’ s front panel LCD dis play shows the fi rst four messages d escribed in “Readin g the Fr ont Panel D isp lay” . During waiti ng period When the fi ve-minute timer begins, the inver t er d isplays t he countdown time r [...]
-
Page 45
Operation 3 – 6 975-0053-01-01 Reading the Front P anel Display During st artup During startup , the Sun T ie XR will dis play several mes sages on its fr ont panel LCD di splay . These mes sages appear in the fol lowing ord er . F igure 3-4 F r ont p anel displa y location Front panel LCD display Message Display Dur ation XANTREX TECH INC. STXR2[...]
-
Page 46
Startup Procedure 975-0053-01-01 3 – 7 After s tartup After t he 300-second count down timer and d uring normal operation, the Sun T ie will di splay four messages t hat repea t every mi nute. *If the inverter is di sconnect ed due to a line c ondition, this d isplay will show one of the following mes sages: • AC NOT PRESENT •A C M A I N S L [...]
-
Page 47
Operation 3 – 8 975-0053-01-01 Reassembling the Sun Tie XR Once the Su n Tie XR i s oper ating normally an d producing power , you need to r e plac e the panels and c overs tha t were removed duri ng instal lation and sta r tup. T o reas semble the S un Tie XR: 1. Replace t he circu it breaker pane l, as shown i n Figure 3- 5 . a) Instal l the ci[...]
-
Page 48
Startup Procedure 975-0053-01-01 3 – 9 F igure 3-5 Circ uit bre ak er co ver and screws Repl ace s cre ws in the circui t breakers repl ace br eaker co ver groun ding sc rew F igure 3-6 Outer cover an d screws Replace s c rews (one on ea ch side) Lock ho le[...]
-
Page 49
Operation 3 – 10 975-0053-01-01 F actors Affecting Su n Tie XR P erformance This sec t ion de scribes severa l factors tha t will af fect the a mount of power that a p r operl y installed a nd operati ng Sun T ie XR can produ ce. PV Array F actors PV array r atings P V arrays are rate d at idea l factory condi tions, suc h as specified illumin at[...]
-
Page 50
F actors Af fecting Sun Tie XR P erforman ce 975-0053-01-01 3 – 11 T emperatur e and reduced out put PV array t emperature a ffects th e output of the e ntire system. As t he temperat ure on the array surface heats up, i t s ene rgy output goes down. Roof-mount ed arrays also c ollect t he heat generat ed by the r oof surface (or tr apped under t[...]
-
Page 51
3 – 12 975-0053-01-01[...]
-
Page 52
T r oubleshooting Chapter 4, “T roubleshooting” describes how to view the status indicator lights (LEDs) inside the Sun T ie XR and use them to troubleshoot the unit. It also provides troubleshooting information with suggestions for solving the problems that the light s may indicate.[...]
-
Page 53
T roubleshooti ng 4 – 2 975-0053-01-01 T r oubleshooting the Sun Tie XR Viewing the Status LEDs Invert er status LEDs T o aid in t r ouble shooting the Sun T ie XR, there ar e two red and green lights (LEDs) inside the unit. The LE D s li ght to i ndicate t he invert er ’ s status according to the troubleshoo ting ref erence ta ble on page 4–[...]
-
Page 54
T roubleshoo ting the Sun T ie XR 975-0053-01-01 4 – 3 F igure 4-1 R ain Sh ield and lo wer panel remova l Remove screws (one on e ach side) Remo ve screws (two on each side)[...]
-
Page 55
T roubleshooti ng 4 – 4 975-0053-01-01 F igure 4-2 Status LEDs location (with circuit break er cover removed) CA UTION The P .C. com. port next t o the status LEDs is n ot enabled . Connecti ng a computer to th is port may resul t in damage to the invert er or the computer . LEDs are located above the circuit breakers Red LED Green L ED Mode co n[...]
-
Page 56
T roubleshoo ting Reference T able 975-0053-01-01 4 – 5 T r oubleshooting Reference T able Problem Cause Remedy Inverter CP U does not illuminate the red or green LEDs and does not operate in suf ficient sunlight, or the display read s “AC Mains Not Present” or the VDC reading is 0. PVGFP , AC or DC breakers are switched of f. No AC grid or D[...]
-
Page 57
T roubleshooti ng 4 – 6 975-0053-01-01 100 amp DC breaker trips. Current fr om the array exceeds the DC inpu t breaker rating. A ligh tning st rike hit near the PV array . Check array si ze and ensure the DC input does not exceed the breaker rating. Check ligh tning arres tor , breakers, pan els, diodes, DC wir e insulati on and oth er compon ent[...]
-
Page 58
Specifications Appendix A cont ains th e elec trical and me chanical s pecific ations for the Sun T ie XR. These include the AC output ranges and characteristics, operating temper ature ranges, dimensions, and weight. Appendix A also lists standard features, options, and regulatory information for the Sun T ie XR.[...]
-
Page 59
Specifica tions A – 2 975-0053-01-01 Electrical Sp ecifications AC outpu t volt age 2 40 V AC AC output voltage rang e 21 1–264 V AC Continuo us AC output at 32–1 13 °F (0– 45 °C) 1500 V A (STXR 1500), 25 00 V A (STXR 2500) Efficiency (peak ) 91% AC output characteristics Current sour ce Frequency 60 Hz (+0 .5 Hz, -0. 7 Hz) W akeup DC vol[...]
-
Page 60
Mechan ical Specific ations 975-0053-01-01 A – 3 Mechanical Sp ecifications Specified temperature range Operating: -38 to 1 13 °F (-39 to 45 °C) Listed to: 32 to 1 13 °F (0 to 45 °C) Enclosure type Outdoor , rainproof (with Rain Shield), powder-coated aluminum enclosure, fully screen ed Inverter d imensions (H × W × D) 33.25 " × 13.25[...]
-
Page 61
Specifica tions A – 4 975-0053-01-01 Standa rd F eatures and Option s Feature Des cri ption PV ground fault protection syst em Sta nda rd PV combiner b oard with 6 fused i nputs, 20 amps maximum p er input Sta nda rd Lightning ar restor- combined AC/DC protection Sta nda rd Rain Shield Optional STRS protective Rain Shield (required for outdoor in[...]
-
Page 62
Efficienc y Curve 975-0053-01-01 A – 5 Efficiency Curve Figur e A-1 Sun T ie XR efficiency curve 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00% 80.00% 90.00% 100.0 0% 0.00 500.00 1000.00 1500.0 0 2000.00 2500.00 AC Power Output Efficiency[...]
-
Page 63
Specifica tions A – 6 975-0053-01-01 T empe ratur e Derati ng Curve Figur e A-2 Sun T ie XR2500 temperature derating curve* *from our testi ng, the se are th e expected output characterist ics to 60 °C with Ra in Shield installed. Thermal charac terist ics are enhanced if the unit is installed indoors wi th no Rain Shield a ttached. 0 500 1000 1[...]
-
Page 64
W arr anty and Product Information Appendix B contains warranty and return procedur e information for the Sun T i e XR.[...]
-
Page 65
W arranty and Product Information B – 2 975-0053-01-01 Limited W arranty What does this warran ty cover? This Limi ted W arranty is pro vided by Xantre x T echnolo gy , Inc. ("Xant rex") and cover s defects in workmanshi p and materi als in your Xantr ex Sun T ie XR. This warranty lasts for a W arranty Per iod of two (2) ye ars from t h[...]
-
Page 66
Limited W a rranty 975-0053-01-01 B – 3 Direct returns may be performed acco rding to t he Xantrex Return Material Authoriz ation Poli cy described i n your produ ct manual. For some produc ts, Xantrex maint ains a net work of region al Authori z ed Service Centers. Call Xant rex or check our website to see if your product can be re paired at one[...]
-
Page 67
W arranty and Product Information B – 4 975-0053-01-01 Disclaimer Product THIS LIMITED W ARRANTY IS THE SOLE AND EXCLUSIVE W ARRANTY PROVID ED BY XANTREX IN CONNECTION WITH YOUR XANTREX PRODUCT AND IS, WHERE PERMI TTED BY LA W , IN LIEU OF ALL OTHER W ARRANTI ES, CONDITI ONS, GUARANTEES, REPRESEN T A TIONS, OBLIGA TIONS AND LIABILITIES, EXPRE SS [...]
-
Page 68
Return Material Author ization P ol icy 975-0053-01-01 B – 5 Please not e that the Xantrex Sun T ie XR inverte r is not intend ed for use as an unint erruptible power supply an d Xantrex makes no war ranty or repres entation in connection wit h any use of the pr oduct for such purpo ses. Return Material Authorization P olicy Before r eturning a p[...]
-
Page 69
W arranty and Product Information B – 6 975-0053-01-01 If you ar e retur ning a pr oduct fr om outside of the USA or Canada In addit i on t o the above, you MUST incl ude return fre ight funds and are fully r esponsibl e for all documen t s, dut ies, tarif fs, and d eposits. If you ar e retur ning a pro duct to a Xant rex Aut horized Service Cent[...]
-
Page 70
975-0053-01-01 Index – 1 A AC circuit breaker requirements 2–5 C combiner bo ard connecting PV array s 2–16 DC connect ion points 2–6 location 2–15 conduit hole loca tions 2–14 D DC wiring connecting 2–1 5 E electrical specifications A–2 external cover locking 3–8 removin g 2–12 F front p anel displa y 1–3 , 3–5 , 3–6 G gr[...]
-
Page 71
Index – 2 975-0053-01-01 P parallel configuration 1–3 , 2–21 peak ef ficiency of Sun T ie XR 1–3 PV arrays angle of the s un 3–11 connecting to co mbiner board 2 –16 effect o f shade on performance 3–1 1 factory ratings 3– 10 ground f ault protection 2–7 , 3–4 , A–4 grou nding 2– 18 requirem ents 2– 7 temperature aff ecti [...]
-
Page 72
Xantrex Technol ogy Inc. 360 435 8826 Tel 360 925 5143 Fax customerservi ce@xantrex.com www.xantr ex.com 975-0053-01-01 Printed in the USA[...]