Go to page of
Similar user manuals
-
Switch
Cisco Systems WSC2960S24TSSRF
94 pages 3.76 mb -
Switch
Cisco Systems MGX 8900
636 pages 10.56 mb -
Switch
Cisco Systems WSC2960X24PDL
112 pages 3.1 mb -
Switch
Cisco Systems SR2024
36 pages 1.94 mb -
Switch
Cisco Systems 2960
680 pages 7.98 mb -
Switch
Cisco Systems ME3600X24FSM
14 pages 1.77 mb -
Switch
Cisco Systems SFS 7000D
80 pages 5.87 mb -
Switch
Cisco Systems WSC2960X24PSL
112 pages 3.1 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Cisco Systems 15600, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Cisco Systems 15600 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Cisco Systems 15600. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Cisco Systems 15600 should contain:
- informations concerning technical data of Cisco Systems 15600
- name of the manufacturer and a year of construction of the Cisco Systems 15600 item
- rules of operation, control and maintenance of the Cisco Systems 15600 item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Cisco Systems 15600 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Cisco Systems 15600, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Cisco Systems service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Cisco Systems 15600.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Cisco Systems 15600 item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
CH A P T E R 17-1 Cisco ONS 15600 Procedure Guide, R8.0 17 DLPs E100 to E199 Note The terms "Unidirectional Path Swit ched Ring" and "UPSR" may appear in Cisco lit erature. These t erms do not refer to using Cisco ONS 15xxx products in a unidirectio nal path switched ring conf iguratio n. Rather , these terms, as w ell as "[...]
-
Page 2
17-2 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E101 Apply a Lock On in a 1+1 Group If the Force switch is successful, CTC sh ows both por ts as [FORCE T O PR OTECT] (or [FORCE TO WORKING]). This indicat ion is sho wn whether or not the ON S 15600 system has been able to mov e traf f ic from one port to the other . If t[...]
-
Page 3
17-3 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E102 Apply a Lockout in a 1+1 Group Step 6 Click Ye s in the conf irmatio n dialog box. The lock on has been applied and traf f ic ca nnot be s witched from t hat port. See the “DLP-E168 Clear a Lock On or Lockou t in a 1+1 Protection Group ” task on page 17-53 as need[...]
-
Page 4
17-4 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E104 Initiate a Force Switc h to a Path Protection Circuit Step 2 Click the path you wa nt to switch and then cl ick Edit . Step 3 In the Edit Circuit windo w , click the P ath Protection Selectors tab . Step 4 In the Switch State column, click the row fo r the p ath you w[...]
-
Page 5
17-5 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E105 Create a DCC Tunnel DLP-E105 Create a DCC Tunnel Note The ONS 15600 can support up to 64 DCC tunnels. T erminated SDCCs cannot be used as a DCC tunnel endpoint, and an SDCC that is used as a DCC tunnel endpo int cannot be terminated. Y ou must delete the terminated SD[...]
-
Page 6
17-6 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E106 Clean Fiber Connectors Step 5 In the Destination area, complete the following: • Node—Choose the destination node. • Slot—Choose the destination slot. • Port—Choose the destination p ort. • Channel—Sho wn if you cho se DCC T unnel-D1-D3 as the tunnel t[...]
-
Page 7
17-7 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E107 Clean the Fiber Adapters b. Place the connector tip at the top of the slot at a slight angle. In a single stroke, mo v e the connector do wn the wipe without li fting the connecto r from the wipe. Before lifting t he connector from the wipe, straighten the connector .[...]
-
Page 8
17-8 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E108 Verify that a 1+1 Working Port is Active d. Remov e and insert the scrub t ool tip se v eral times to clean the f iber adapter . Step 3 T o remov e loose particles from the f iber adapter: a. Remove the dust cap from the rinse tool. Note If the absorb ent pad on t he [...]
-
Page 9
17-9 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E109 Drill Holes to Anchor and Provide Access to the Bay Assembly c. Click Ye s in the con fi rmation dialog box. Step 4 V erify that the worki ng slot is carrying traf f ic (W orking/Active). Note If the slot is not acti v e, look for condi tions or alarms that might be p[...]
-
Page 10
17-10 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E109 Drill Holes to Anchor and Provide Access to the Bay Assembly Figur e 1 7 -1 Floor T emplate Step 2 Use the corner indicators “C” to determine the closest recommended position of an adja cent 900-mm (35.4-inch) bay assembly . Step 3 Use a marking pen to mark th e [...]
-
Page 11
17-11 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E110 Assign a Name to a Port DLP-E110 Assign a Name to a Port Step 1 Double-click the card that has the port you want t o provisio n. Step 2 Click the Pro visioning tab . Step 3 Click the Por t N a m e column for the port number you are assi gning a name to and enter the [...]
-
Page 12
17-12 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E112 Provision a Half Circuit So urce and Destination on a BLSR or 1+1 • Re version time—If Re ve rti ve is check ed, click the Re v ersion time f ield and choose a re v ersion time from the drop-do w n list. The range is 0.5 to 12 .0 minutes. The def ault is 5.0 minu[...]
-
Page 13
17-13 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E113 Provision a Half Circuit Source and Destination on a Path Protection DLP-E113 Provision a Half Circuit Source and Destination on a Path Protection Step 1 From the Node drop-do wn list, choose the node that will contain th e half circuit. Step 2 From the Slot drop -do[...]
-
Page 14
17-14 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E114 Provision Section DCC Terminations DLP-E114 Provision Section DCC Terminations Step 1 In node vie w , click the Pr ovision ing > Comm Channels > SDCC tabs. Step 2 In the SDCC T erminations area, click Create . Step 3 In the Create SDCC T e rminations dialog box[...]
-
Page 15
17-15 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E114 Provision Section DCC Terminations Step 8 If you check ed OSI, complete the follo wing st eps. If you checked IP o nly , continue with Step 9 . a. Click Next . b. Provisio n the follo wing fi elds: – Router—Choose the OSI rout er . – ESH—Sets the End System H[...]
-
Page 16
17-16 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E115 Change the Se rvice State for a Port DLP-E115 Change the Service State for a Port Step 1 In node vie w , double-click th e card with the port(s) you wa nt to put in or out of serv ice. The card vie w appears. Step 2 Click the Pro visioning > Line tabs. Step 3 In t[...]
-
Page 17
17-17 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E116 Remap the K3 Byte Step 8 Return to your ori ginating procedure (NTP). DLP-E116 Remap the K3 Byte Caution If you remap the K3 b yte, remap to the same e xtended b yte (Z2, E2, or F1) on ei ther side of the span. Step 1 In node vie w , double-click the card t hat conne[...]
-
Page 18
17-18 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E120 Remove the Narrow CRMs Step 3 From the A uto-refresh drop-do wn list choose one of the follo wing opt ions: • None : This option disab les the auto-refresh feature. • 15 Seconds : This option sets the windo w auto-refresh to 15-secon d time interv als. • 30 Sec[...]
-
Page 19
17-19 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E120 Remove the Narrow CRMs Figur e 1 7 -2 Nar r o w CRMs Step 2 Lift the cable rout er slightl y and pull it a way from th e bay . Step 3 Repeat this proc edure for the router on t he other side. Step 4 Unscrew and remo ve the cable radius pieces at the lo wer right and [...]
-
Page 20
17-20 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E121 Replace the Existing 600-mm Ki ck Plates with 900-mm Kick Plates DLP-E121 Replace the Existing 600-mm Kick Plates with 900-mm Kick Plates Step 1 Using the screwdri ver , remove the f i ve scre ws located on the 600-mm (23.6- inch) kick plate on the front of the bay .[...]
-
Page 21
17-21 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E123 Clear a Manual Switch on a Node Timing Refere nce This operation commands the node to switch t o the refe rence you ha ve selected if the SSM quality of the reference is not lo wer than the current timi ng reference. Step 4 Click the A pply bu tton. Step 5 Click Ye s[...]
-
Page 22
17-22 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E124 Set the Optical Po wer Received Nominal Value DLP-E124 Set the Optical Power Received Nominal Value Step 1 In node vie w , double-click the O C-N card that you w ant to pro vision. The card vie w appears. Step 2 Click the Pro visioning > SONET Thr esholds tabs. St[...]
-
Page 23
17-23 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E126 Provision the IIOP List ener Port on the CTC Computer • Other Constant—If Port 683 is not used, type the IIOP port specif ied b y your f ire wall ad ministrator . Step 3 Click Apply . Step 4 When the Change Netw ork Conf ig uration message appears, click Ye s . B[...]
-
Page 24
17-24 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E127 Edit Path Protectio n Circuit Path Selectors DLP-E127 Edit Path Protection Circuit Path Selectors Step 1 Click the Circ uits tab . Step 2 In the Circuits tab, click th e path protection circuit that you w ant to edit. T o change the settings for multiple circuits, pr[...]
-
Page 25
17-25 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E128 Change the Node Name, Date, Time, and Contact Information DLP-E128 Change the Node Name, Date, Time, and Contact Information Note Changing the date, time, or time zone might in validate node perf ormance monitoring counters. Step 1 In node vie w , click the Pr ovisio[...]
-
Page 26
17-26 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E129 Enable Dialog Box Do-Not-Display Option DLP-E129 Enable Dialog Box Do-Not-Display Option Note If any user wh o has rights to perform an operation ( f or example, creating a circuit) selects the “Do not sho w this dialog again” check box on a dialo g box, the dial[...]
-
Page 27
17-27 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E131 Change Security Policy on Multiple Nodes Step 3 In the User Lockout area, you can modify the following: • Failed Login s Before Lockou t—Choose the number of failed login attempts a user can mak e before the user is lock ed out from the node. Y ou can choose a va[...]
-
Page 28
17-28 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E132 Change User Password and Security Levels for a Single Node • Manual Unlock b y Superuser—Check th is box if you w ant to allo w a user with Superuser p ri vile ges to manually unlock a user wh o has been locked out fro m a node. The user wil l remain locked out u[...]
-
Page 29
17-29 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E133 Change User and Security Setting s for Multiple Nodes Note User settings t hat you chang ed during thi s task will not appear until that user logs off and logs back in again. Step 5 Return to your ori ginating procedure (NTP). DLP-E133 Change User and Security Settin[...]
-
Page 30
17-30 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E135 Log Out a Us er on a Single Node DLP-E135 Log Out a User on a Single Node Step 1 In node vie w , click the Pr ovisioning > Securi ty > Active Logi ns tabs. Step 2 Choose the user you wa nt to log out. Step 3 Click Logout . Step 4 In the Logout User dialog box, [...]
-
Page 31
17-31 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E137 Check the Network for Alarms and Conditions Step 7 Click OK . A conf irmation dial og box appears. Step 8 Click OK . Step 9 Return to your ori ginating procedure (NTP). DLP-E137 Check the Network for Alarms and Conditions Step 1 From the V ie w menu, choose Go T o Ne[...]
-
Page 32
17-32 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E141 Disable Proxy Service Us ing Netscape (Win dows and UNIX) Note If your computer is running W indo ws XP , you can select Control P anel direct ly from the Start menu. Make sure that you are in Classic V iew before conti nuing with this proced ure. Step 2 In the Contr[...]
-
Page 33
17-33 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E142 Install the Narrow CRMs DLP-E142 Install the Narrow CRMs Step 1 On the bottom left and bot tom right, install the cable radi us (2 scre ws). Step 2 Lift the right-si de narro w CRM and align it with the three scre w holes you wil l use to mount the CRM. Step 3 Use a [...]
-
Page 34
17-34 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E143 Install the Wide CRMs DLP-E143 Install the Wide CRMs Note If you are installing CRMs o n more than one shelf, it is easiest to install t he lo west CRMs fir st. Note If your site uses under -floor cabling, mou nt the CRMs on the sides of the bay di rectly ne xt to th[...]
-
Page 35
17-35 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E143 Install the Wide CRMs Figur e 1 7 -3 CRM Scr ew Holes (F r ont) Step 7 Align the front of the CRM k eyh oles with the scre ws and carefully slide the C RM down so it rests on the screws. T ighten the scre ws, starting with the bottom screw and proceedin g up to the m[...]
-
Page 36
17-36 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E144 Use the Reinitialization Tool to Clear the Da tabase and Upload Software (Windows) Step 9 Repeat Steps 5 through 8 for the left-side CRM. Step 10 Return to your ori ginating procedure (NTP). DLP-E144 Use the Reinitialization Tool to Clear the Database and Upload Soft[...]
-
Page 37
17-37 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E145 Connect the PDU Ground Cables to the PDU • Acti v ate/Re vert—Check this bo x to acti v ate the uploaded softw are (if the software is a later than the installed v ersion) or re v ert to the uploaded softw a re (if the software is earl ier than the installed vers[...]
-
Page 38
17-38 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E145 Connect the PDU Gr ound Cables to the PDU Note A shunt is preinstalled betw een logic and frame grou nd to bond the two grounds. If you are providing a separate logic ground, remove this shunt on both sid es before installing the PDU frame ground. Figure 1 7 -5 Pow e[...]
-
Page 39
17-39 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E146 Install Isolated Logic Ground DLP-E146 Install Isolated Logic Ground Step 1 Remov e the PDU safety co v er on the right side. Step 2 Remov e the metal shun t connecting the fr ame ground to the l ogic ground terminals. T erminal designations are marked on the top o f[...]
-
Page 40
17-40 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E147 Check BLSR or Path Protection Alarms and Conditions DLP-E147 Check BLSR or Path Pr otection Alarms and Conditions Step 1 From the V iew menu , choose Go to Network V iew . V erify that all BLSR or path protecti on spans on the network map are green. Step 2 Click the [...]
-
Page 41
17-41 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E152 Install Public-Key Security Certificate b. In the Set W est Protection Operation dia log box, choose C LEAR from the drop-do wn list. Cl ick OK . c. In the Conf irm BLSR Operation dialo g box, click Ye s . Step 5 T o clear a Force switch on the east line: a. Right-cl[...]
-
Page 42
17-42 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E153 Changing the Maximum Number of Session Entries for Alar m History • Ye s —Removes t he modifi ed Jav a po licy f ile from yo ur PC. Choose this option only if you will log into ONS 15600s ru nning Softw are R1.1 or later . • No —Does not remov e the m odif ie[...]
-
Page 43
17-43 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E154 Delete Alarm Severity Profiles Step 3 Click Apply and OK . Note Setting the Maximum History Entries v alue to t he high end of t he range uses more CTC memo ry and could impair CTC performance. Note This task changes the maximum history entries reco rded for CTC sess[...]
-
Page 44
17-44 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E155 Enable Alarm Filtering Step 9 T o remo ve the alar m profi le from the Prov isioning > Alarm Prof iles > Alarm Prof ile Editor windo w , right-click the column o f the prof ile you d eleted and choose Remo ve fro m the shortcut menu. Note If a node and prof ile[...]
-
Page 45
17-45 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E155 Enable Alarm Filtering Figur e 1 7 -7 Conditio ns Window Filt er Dialog Bo x Step 3 In the Sho w Se verity area, alarm se v erities appear . All of the applicable se verities are checked b y def ault. If a se v erity is chec ked, it ap pears in the alarm list . Note [...]
-
Page 46
17-46 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E156 Modify Alarm and Condition Filtering Parameters DLP-E156 Modify Alarm and Condition Filtering Parameters Step 1 In the node, network , or card vie w , click the Alarms tab . Step 2 Click the Filter button at the lo wer -left of the bottom too lbar . The Alarm Filter [...]
-
Page 47
17-47 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E157 Disable Alarm Filtering DLP-E157 Disable Alarm Filtering Step 1 In the node, network , or card vie w , click the Alarms tab . Step 2 Click the Filter tool at the lo wer -ri ght side of the bottom to olbar . Alarm filt ering is enabled if the t ool is selected and dis[...]
-
Page 48
17-48 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E159 Manually Lock or Un lock a User on Multiple Nodes Step 6 Click OK . Step 7 Return to your ori ginating procedure (NTP). DLP-E159 Manually Lock or Unl ock a User on Multiple Nodes Step 1 From the V iew menu, chose Go T o Network V iew . Step 2 Click the Pro visioning [...]
-
Page 49
17-49 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E160 Verify BLSR Extension Byte Mapping DLP-E160 Verify BLSR Extension Byte Mapping Step 1 In network vie w , double-click one of t he BLSR nodes with OC-N trunk cards t h at will be reconnected after a BLSR node remov al. Step 2 Double-click one OC-N BLSR trunk card to o[...]
-
Page 50
17-50 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E161 Single Shelf Control Card Switch Test d. In node vie w , click the Maintenance > Pr eferr ed Copy tabs. e. From the Set Preferred d rop-down list, choose Copy B . Click Apply . f. Remov e the SSXC card from Slot 8. (The SSX C card faceplate e xtends to cover Slot [...]
-
Page 51
17-51 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E163 Delete Circuits DLP-E163 Delete Circuits Step 1 Complete the “NTP-E69 Back Up th e Database” proced ure on page 14-4 . Step 2 In v estigate all network alarms and resolv e any problems that could be af fected by the circuit deletion. If necessary , refer to the C[...]
-
Page 52
17-52 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E165 Change an OC-N Card Step 10 Complete the “NTP-E69 Back Up th e Database” proced ure on page 14-4 , if ne eded. Note If a schedule is established for database backup, you do not need to complet e a backup after e very circuit add ition and delet ion. Step 11 Retur[...]
-
Page 53
17-53 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E167 Clear a Manual or Force Switch in a 1+ 1 Protection Group Step 6 Complete the “NTP-E11 Install the OC-N Cards” procedure on page 2-4 . Step 7 Return to your ori ginating procedure (NTP). DLP-E167 Clear a Manual or Force Switch in a 1+1 Protection Group Step 1 In [...]
-
Page 54
17-54 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E169 Initiate a Lockou t on a Path Protection Path Step 2 In the Protection Groups ar ea, choose the protection grou p that contai ns the card you w ant to clear . Step 3 In the Selected Group area, choo se the card you want to clear . Step 4 In the Inhibit Switching area[...]
-
Page 55
17-55 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E170 Clear a Switch or Lockout o n a Path Protection Circuit DLP-E170 Clear a Switch or Lockout on a Path Protection Circuit Step 1 Click the Circ uits > Cir cuits tabs. Step 2 Click the path you want to switch and click Edit . Step 3 In the Edit Circuit windo w , clic[...]
-
Page 56
17-56 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E171 Verify Fan Operation Figure 17 -8 ONS 15600 Shelf with One Fa n T ra y and Air Filt er Remov ed Step 2 T o ensure the three front fa ns are op erating, carefully place your hand in the card cage two to three inches (50 to 76 mm) from the top o f the cage, palm up, to[...]
-
Page 57
17-57 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E172 Install Fiber-Optic Cables for Path Protection Configurations DLP-E172 Install Fiber-Optic Cables for Path Protection Configurations Caution T o a void lo ss of traff i c, do not create a path protec tion usi ng two por ts on the same card. Y ou can create a path pro[...]
-
Page 58
17-58 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E176 Edit Path Protection Dual-Ri ng Interconnect Circ uit Hold-Off Timer DLP-E176 Edit Path Protection Dual-Ri ng Interconnect Circuit Hold-Off Timer Note Cisco recommends that you set the DRI port HO T v alue to zero and the circuit pa th selector HO T v alue to a numbe[...]
-
Page 59
17-59 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E177 Change Tunnel Type DLP-E177 Change Tunnel Type Step 1 From the V ie w menu, choose Go to Network V iew . Step 2 Click the Pro visioning > Overhead Cir cuits tabs. Step 3 Click the circuit tunnel that y ou want to con vert. Step 4 Click Edit . Step 5 In the Edit Ci[...]
-
Page 60
17-60 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E179 Repair an IP Tunnel Step 1 From the V ie w menu, choose Go to Network V iew . Step 2 Click the Pro visioning > Overhead Cir cuits tabs. Step 3 Click the ov erhead circuit th at you wa nt to delete. Step 4 Click Delete . Step 5 In the conf irmation dial og box, cli[...]
-
Page 61
17-61 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E180 Provision Path Trace on Circuit Source and De stination Ports DLP-E180 Provision Path Trace on Ci rcuit Source and Destination Ports Note This task assumes you are sett ing up path trace on a bidirectional circuit and setting up transmit strings at the circuit source[...]
-
Page 62
17-62 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E180 Provision Path Trace on Ci rcuit Source and Destination Ports Figur e 1 7 -9 Selecting the Edit P ath T race Option b. In the New T ransmit String field , enter the circu it source transmit string. Enter a stri ng that makes the source port easy to identify , such as[...]
-
Page 63
17-63 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E180 Provision Path Trace on Circuit Source and De stination Ports c. Click the Disable AIS and RDI if T IM-P is detected check box if you want to suppress the alarm indication si gnal (AIS) an d remote defect ind i cation (RDI) when the STS Path T race Identif ier Mismat[...]
-
Page 64
17-64 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E181 Provision Path Trace on OC-N Ports The expect and receive strings are updated every fe w s econds if the Path T race Mo de f ield is set to Auto or Manual. Step 11 Click Close . The detailed circuit window indicates path trace with an M (manual path trace) or an A (a[...]
-
Page 65
17-65 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E18 2 Create Logi n Node Gro ups Step 7 If you set the Path T race Mode f ield to Manual, enter the string that the OC-N port should recei ve in the Ne w Expected String f ield. T o do this, trace the circ uit path on the detail ed circuit w indow to determine whether the[...]
-
Page 66
17-66 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E183 Delete a Node from t he Current Session or Login Group Figur e 1 7 -1 0 Login Node Gr oup Step 8 Return to your ori ginating procedure (NTP). DLP-E183 Delete a Node from t he Current Session or Login Group Step 1 From the V ie w menu, choose Go to Network V iew . Ste[...]
-
Page 67
17-67 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E184 Configure the CTC Alerts Dialog Box for Automatic Popup DLP-E184 Configure the CTC Alerts Dialog Box for Automatic Popup Step 1 Click the CTC Alerts toolbar icon. Step 2 In the CTC Alerts dialog box, choose o ne of the follo wing: • All alerts —Sets the CTC Alert[...]
-
Page 68
17-68 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E186 Remove Pa ss-through Connections Step 6 From the File menu, choose Exit . Step 7 In the conf irmation dial og box, click Ye s . Step 8 Return to your ori ginating procedure (NTP). DLP-E186 Remove Pass-through Connections Step 1 Log into the deleted node. Step 2 In th[...]
-
Page 69
17-69 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E187 Delete a Node from a Specified Login Node Group DLP-E187 Delete a Node from a Specified Login Node Group Step 1 From the CTC Edit menu, choose Pr efer ences . Step 2 In the Preferences dialog box, click the Login Node Groups tab . Step 3 Click the login node group t [...]
-
Page 70
17-70 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E189 Provision Line DCC Terminations • OOS,MT—Puts the circuit cross-connects in the OO S-MA,MT service state. This se rvice state does not interrupt traf fic flo w and allo ws loopb acks to be performed on the circuit, but suppresses alarms and conditions. Use the OO[...]
-
Page 71
17-71 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E189 Provision Line DCC Terminations Note User can provision SDCCs an d LDCCs (Line DCC) on dif ferent ports . User can pro vision the SONET Line DCCs and SDCCs (when not used as a DCC termi nation by the ON S 15600) as DCC tunnels. See the “DLP-E105 Create a DCC T unne[...]
-
Page 72
17-72 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E190 Provision a Proxy Tunnel – IIH—Sets the Intermediate System to In termed iate System Hello PDU propa gation frequency . The IS-IS Hello PDUs establish and maintain adj acencies between ISs. The default is 3 seconds. The range is 1 to 600 seconds. – IS-IS Cost?[...]
-
Page 73
17-73 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E191 Provision a Firewall Tunnel Step 5 Continue with your originating pro cedure (NTP). DLP-E191 Provision a Firewall Tunnel Note If the proxy serv er is conf igured as proxy-o nly or is disabled, you canno t set up a f ire wall tunn el. Step 1 Click the Pro visioning &g[...]
-
Page 74
17-74 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E192 Delete a Proxy Tunnel DLP-E192 Delete a Proxy Tunnel Step 1 Click the Pro visioning > Network > Proxy su btabs. Step 2 Click the proxy tunnel that you w ant to delete. Step 3 Click Delete . Step 4 Continue with your originating pro cedure (NTP). DLP-E193 Delete[...]
-
Page 75
17-75 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E196 Change a Section DCC Termination DLP-E196 Change a Section DCC Termination Step 1 Click the Pro visioning > Comm Channels > SDCC tabs. Step 2 Click the SDCC that you want to change. Step 3 Click Edit . Step 4 In the SDCC T ermination Editor di alog box, complet[...]
-
Page 76
17-76 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E198 Delete a Section DCC Termination • Far End i s Foreign— Check this box to specify that the LDCC termination is a no n-ONS node. • Far end IP—If you checked the Far End is Foreign ch eck box, type the IP address of the f ar-end node or lea ve the 0 .0.0.0 defa[...]
-
Page 77
17-77 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E199 Delete a Line DCC Termination Step 4 Return to your ori ginating procedure (NTP).[...]
-
Page 78
17-78 Cisco ONS 15600 Procedure Guide, R8.0 Chapter 17 DLPs E100 to E199 DLP- E199 Delete a Line DCC Termination[...]