Jacuzzi 2 Wall and 3 Wall manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Jacuzzi 2 Wall and 3 Wall, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Jacuzzi 2 Wall and 3 Wall one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Jacuzzi 2 Wall and 3 Wall. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Jacuzzi 2 Wall and 3 Wall should contain:
- informations concerning technical data of Jacuzzi 2 Wall and 3 Wall
- name of the manufacturer and a year of construction of the Jacuzzi 2 Wall and 3 Wall item
- rules of operation, control and maintenance of the Jacuzzi 2 Wall and 3 Wall item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Jacuzzi 2 Wall and 3 Wall alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Jacuzzi 2 Wall and 3 Wall, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Jacuzzi service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Jacuzzi 2 Wall and 3 Wall.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Jacuzzi 2 Wall and 3 Wall item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    SUMMER RAIN ™ 2 W ALL & 3 W ALL W ALK-IN SHOWER SYSTEMS INST ALLA TION AND OPERA TING INSTRUCTIONS[...]

  • Page 2

    Note: This is a professional grade product. A knowledge of construction techniques, plumbing and electrical installation according to codes are required for proper installation and user satisfaction. We recommend that a licensed contractor perform the installation of all Jacuzzi Whirlpool Bath products. Our warranty does not cover improper installa[...]

  • Page 3

    Owner's Record Save These Instructions for Future Use. Date Purchased ____________________________________________________________ Purchased From ____________________________________________________________ Installed By ________________________________________________________________ Serial Number ______________________________________________[...]

  • Page 4

    Important: Read complete instructions before beginning installation. Each unit arrives ready for installation, equipped with base, glass and associated hardware. Remove the unit from the carton. Retain the shipping carton until satisfactory inspection of the product has been made. Immediately upon receipt, inspect the base and other components befo[...]

  • Page 5

    3 2 W ALL ROUGH-IN REFERENCE 60" 42-5/16" 33-3/4" 27-15/16" 84" 23" 21-1/2" FRONT VIEW TOP VIEW 1/2" RIGID COPPER PIPE UNDER BASE COLD SUPPL Y 1-1/2" TILE FLANGE HOT SUPPL Y MINIMUM W A TER PRESSURE FOR THE SYSTEM IS 40PSI[...]

  • Page 6

    2 W ALL COMPONENT IDENTIFICA TION 4 HEX WRENCH (1) (PROVIDED) STRAIGHT GLASS W ALL MOUNTING POST STRAIGHT GLASS P ANEL MOUNTING POST CAP (2) 3 SCREWS AND 3 W ALL ANCHORS PER MOUNTING POST CURVED GLASS W ALL MOUNTING POST TOWER WITH PLUMBING, FIXTURES, MAGNETIC GASKET , BOTTOM PLA TE AND TOP COVER (PREASSEMBLED) GLAZING GASKET (3) TOWER MOUNTING BOL[...]

  • Page 7

    5 PRELIMINARY ROUGH-IN SPREAD MORT AR OR LEVELING COMPOUND ETC. EVENL Y OVER ENTIRE AREA STRAINER DRAIN ASSEMBLY SILICONE SEALANT SHOWER BASE RUBBER W A SHER FIBER W A SHER NUT APPL Y LUBRICANT The floor structure beneath the unit must be able to support a total weight of the unit and bather. Refer to the table under total weight. STEP 1 Provide an[...]

  • Page 8

    6 TIGHTEN SEALING NUT TOOL (INCLUDED) GAP TILE FLANGE INCORRECT SHIM STUD CORRECT TILE FLANGE STUD USE SCREWS (PROVIDED) USE SCREWS (PROVIDED) STEP 5 With a large screwdriver and the tool included with the drain, tighten the inside compression nut to seal the drain pipe connection. After drain is fully installed, test for proper drainage. If the sh[...]

  • Page 9

    7 2 W ALL BASE INST ALLA TION STUD CEMENT BOARD 1/4" MINIMUM GAP SILICONE SEALANT TILE TILE ADHESIVE 1/4" MINIMUM GAP SILICONE SEALANT STUD CEMENT BOARD 1/8" GAP GROUT STUD SHIM IF NECESSARY DO NOT FILL CEMENT BOARD TILE SILICONE SEALANT 1-1/8" MAXIMUM NO MINIMUM STEP 7 Apply tile (or other finishing material) leaving a 1/8"[...]

  • Page 10

    8 STEP 1 Position the wall posts so the edge of the post is set back 3/4" (19 mm) in from the edge of the base STEP 2 Level both wall posts in their proper position and mark where screw holes are to be drilled. Drill 3/16" holes and secure with wall anchors and screws provided. Cut a 12" strip of tape (provided) and apply firmly over[...]

  • Page 11

    STEP 5 Place the tower onto base. Ensure the curved glass locates into the glazing channel. Install bolt but do not tighten. STEP 6 Insert tower support rail into glass panel rail but do not tighten at this time. 9 STEP 4 Slide the glass panel into the wall post. Make sure that the corner notch is positioned toward the base of the tower. 2 W ALL: T[...]

  • Page 12

    STEP 11 Secure the rails. 10 AT T ACH RAIL BRACKET T O W ALL SECURE RAIL T O BRACKET (TURN CW TO TIGHTEN) MOVE COVER CAP OVER BRACKET STEP 9 Place the front rail and tower support rail against the walls. Check level and mark the position for the rail mounting bracket. The screw position will be above the rail. Drill the wall with a 3/16" bit a[...]

  • Page 13

    11 2 W ALL: T OWER, FIXED W ALL AND CURVED GLASS INST ALLA TION STEP 13A Insert fixed glass support rail into panel post and tighten set screw. GLASS P ANEL SUPPORT RAIL DRILL 1/8" PILOT HOLE AND SCREW M3.5X9.5 mm SCREW INTO HOLE STEP 13B Drill a 1/8" pilot hole into tower support rail using the hole in the glass panel support rail. Screw[...]

  • Page 14

    2 W ALL: TOWER, FIXED W ALL AND CUR VED GLASS INST ALLA TION TOWER COVER INSERT THIS SIDE FIRST TOWER COVER T OWER T OP PLA TE 12 STEP 16 Turn on water supply and check for leaks. Correct any leaks before installing tower cover. STEP 17 Install tower cover as shown. Insert cover at top first. STEP 18 Seal all around the base of tower with silicone [...]

  • Page 15

    13 Important: Read complete instructions before beginning installation. Each unit arrives ready for installation, equipped with base, glass and associated hardware. Remove the unit from the carton. Retain the shipping carton until satisfactory inspection of the product has been made. Immediately upon receipt, inspect the base and other components b[...]

  • Page 16

    3 W ALL ROUGH-IN REFERENCE 60" 42-5/16" 33-3/4" 27-15/16" 84" 23" 21-1/2" FRONT VIEW TOP VIEW 1/2" RIGID COPPER PIPE UNDER BASE COLD SUPPL Y 1-1/2" TILE FLANGE HOT SUPPL Y MINIMUM W A TER PRESSURE FOR THE SYSTEM IS 40PSI 14[...]

  • Page 17

    3 W ALL COMPONENT IDENTIFICA TION HEX WRENCH (1) (PROVIDED) MOUNTING POST CAP 3 SCREWS AND 3 W ALL ANCHORS CURVED GLASS W ALL MOUNTING POST TOWER WITH PLUMBING, FIXTURES, MAGNETIC GASKET , BOTTOM PLA TE AND TOP COVER (PREASSEMBLED) TOWER MOUNTING BOL T & W ASHER CURVED GLASS GLAZING GASKET (2) FRONT RAIL BRACKET COVER (2) W ALL MOUNT BRACKET (2[...]

  • Page 18

    3 W ALL BASE INST ALLA TION The floor structure beneath the unit must be able to support a total weight of the unit and bather. Refer to the table under total weight. STEP 1 Provide an opening in the subfloor no less than 5" x 5" square. This opening should be located on the center lines of the shower base drain hole (See Product Chart). [...]

  • Page 19

    3 W ALL BASE INST ALLA TION STEP 5 With a large screwdriver and the tool included with the drain, tighten the inside compression nut to seal the drain pipe connection. After drain is fully installed, test for proper drainage. If the shower base does not drain properly, rectify this condition before proceeding with the installation. Jacuzzi Whirlpoo[...]

  • Page 20

    STEP 7 With a large screwdriver and the tool included with the drain, tighten the inside compression nut to seal the drain pipe connection. After drain is fully installed, test for proper drainage. If the shower base does not drain properly, rectify this condition before proceeding with the installation. Jacuzzi Whirlpool Bath is not respon- sible [...]

  • Page 21

    3 W ALL: T OWER AND CUR VED GLASS INST ALLA TION STEP 1 Position the wall post so the edge of the post is set back 3/4" (19 mm) in from the finish wall. STEP 2 Level the post in its proper position and mark where screw holes are to be drilled. Drill 3/16" holes and secure with wall anchors and screws provided. Cut a 12" strip of tape[...]

  • Page 22

    3 W ALL: TOWER AND CURVED GLASS INST ALLA TION STEP 5 Insert support rails into brackets in top moulding of tower but do not tighten at this time. STEP 6 Slide mounting bracket covers and mounting brackets onto front rail and tower support rail. TOWER SUPPOR T RAIL FRONT RAIL RAIL W ALL MOUNTING BRACKET MOUNTING BRACKET COVER RAIL STEP 7 Place the [...]

  • Page 23

    3 W ALL: T OWER AND CUR VED GLASS INST ALLA TION STEP 9 Secure the rails. STEP 10 Tighten the tower base bolt. Two shut-off valves are provided. To hook up supply lines, unscrew valves from braided line. Using thread sealant, screw valve to stub outs at bottom of tower. Then reconnect braided line using provided gasket. Do not twist or kink supply [...]

  • Page 24

    STEP 13 Turn on water supply and check for leaks. Correct any leaks before installing tower cover. STEP 14 Install tower cover as shown. Insert cover at top first. 3 W ALL: TOWER AND CURVED GLASS INST ALLA TION TOWER COVER INSERT THIS SIDE FIRST TOWER COVER T OWER T OP PLA TE STEP 15 Seal all around the base of tower with silicone sealant. Also sea[...]

  • Page 25

    2 & 3 W ALL OPERA TION 23 STOP RELEASE T emperature V alve The temperature of the mixed water is adjusted by means of the graduated handle. This handle has a safety stop set at 100 ° F (38 ° C). T o increase the temperature, press the red button to release the stop and keep turning the handle. Shower Head There are four selectable positions: [...]

  • Page 26

    24 2 & 3 W ALL MAINTENANCE To remove any lime scale from the shower head and body sprays , rub with your finger the outer ring of nozzles on the shower head and all nozzles on the body spray. To clean the foot temperature tester, unscrew the nozzle and back flush the wire mesh filter. Do not use metal tools (such as scissors or screwdrivers, et[...]

  • Page 27

    T OWER FIXTURES REP AIR P ARTS 1. C546000 Lock Nut, 1/2" NPT WP (5X) 2. G559000 Ring Compression SS (5X) 3. G560000 W asher Rubber (5X) 4. U546000 (Part of U547000) Nut T ransfer V alve, Chrome 5. U566000 Gasket, 1.41 ID X .063 Thick 6. U547000 V alve, Mixer/T ransfer Assembly 7. U550827 (Part of U547000) 567000Nut, Mixer V alve, Chrome 8. U56[...]

  • Page 28

    T OWER PLUMBING REP AIR P ARTS 1. A944000 (9X) Spring Clamp, .625 OD Hose 2. U405000 L=31.0" T ubing, PVC Reinforced, 10mm Barb 3. U405000 L=5.5" T ubing, PVC Reinforced, 10mm Barb 4. A945000 (7X) Spring Clip, .75 OD Hose 5. U400000 FTG, Straight, 1/2" FTS X 10mm Barb 6. U403000 (2X) Cap, 1/2" FST 7. U71 1000 (2X) Strainer W ash[...]

  • Page 29

    1 2 3 4 5 (2X) 6 (2X) 7 (6X) 8 9 10 11 12 13 (6X) 15 17 16 18 20 21 14 (6X) 1. U134827 Rail Back W alk-in 2. U133827 Rail 2 W all W alk-in 3. U245827 Rail Assembly Walk-in 4. U149000 Bracket, Mounting Rail 5. U1 19827 W all Post, Panel 6. U138827 Cap, W all Post 7. J686000 T ape High Bond, 2 Sided 8. U159000 Gasket,Vinyl, Glass Panel 9. U479XXX Gla[...]

  • Page 30

    3 W ALL UNIT REP AIR P ARTS 1. U134827 Rail Back W alk-in 3 W all 2. U245827 Rail Assembly Walk-in 3 W all 3. U149000 Bracket, Mounting Rail 4. U1 19827 W all Post, Panel 5. U138827 Cap, W all Post 6. U124XXX T ower Cover 7. U257XXX Final Shell, T ower , W alk-in 3-Wall U126XXX T ower Body Walk-in U136XXX Cap, T op T ower U137XXX Cap, Bottom, T owe[...]

  • Page 31

    Jacuzzi Whirlpool Bath P .O. Box 702168 Dallas, TX 75370-2168 WARRANTY COVERAGE Jacuzzi Whirlpool Bath (the “Company”) offers the following express limited warranty to the original purchaser of any Jacuzzi Whirlpool Bath Designer Collection Bath Product (“unit”) who purchases the product for personal or single family use (“user”). The C[...]

  • Page 32

    RESPONSIBILITIES OF OTHERS Inspecting the unit prior to installation is the responsibility of the installer or building contractor who acts on behalf of the user. They are responsible for ensuring the unit is free of defect or damage. Notices are placed on and in the unit and on the shipping carton advising the installer of this responsibility. In [...]