A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Lochinvar SIT119, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Lochinvar SIT119 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Lochinvar SIT119. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Lochinvar SIT119 should contain:
- informations concerning technical data of Lochinvar SIT119
- name of the manufacturer and a year of construction of the Lochinvar SIT119 item
- rules of operation, control and maintenance of the Lochinvar SIT119 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Lochinvar SIT119 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Lochinvar SIT119, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Lochinvar service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Lochinvar SIT119.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Lochinvar SIT119 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    Installation & Operation Manual Models: SIT030 - SIT119 This manual must only be used by a qualified heating installer / service technician. Read all instructions before installing. Perform steps in the order given. Failure to comply could result in severe personal injury, death, or substantial property damage.  WARNING Save this manual for [...]

  • Page 2

    2 Hazard definitions The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk level s or to important information concerning the life of the product.  DANGER  WARNING  CAUTION CAUTION NOTICE DANGER indicates an imminently hazardous situation which, if not avoided, will result[...]

  • Page 3

    Installation & Operation Manual Please read before proceeding Installer – Read all instructions before installing. Perform steps in the order given. Have this indirect water heater serviced/ inspected by a qualified service technician, at least annually. Failure to comply with the above could result in severe personal injury, death or substan[...]

  • Page 4

    Installation & Operation Manual 1 General information The Lochinvar SIT series indirect water heater (FIG. 1-1) is designed to generate domestic hot water in conjunction with a hot water boiler using forced boiler water circulation. This indirect water heater consists of a 316L Stainless Steel tank in which a smooth 304L stainless steel coil is[...]

  • Page 5

    Installation & Operation Manual 5 2 Pre-installation 1. The installation must conform to the instructions in this manual and all applicable local, state, provincial, and national codes, laws, regulations, and ordinances. Installations in Canada must conform to B149.2 Installation Code. 2. Be certain the domestic water supply to the tank has phy[...]

  • Page 6

    Installation & Operation Manual 6 Multiple tank connections (boiler side) Multiple tank installations must be done in the “reverse-return” manner. The reason for this is to create the same pressure drop (and therefore, the same flow) through the coil of each tank. The boiler manifold piping must be sized so that each coil has the flow rate [...]

  • Page 7

    Installation & Operation Manual 7 SOLUTION BOILER SQUIRE COLD WATE R IN TEMPERATUR E / PRESSURE GAUGE AIR SEPARATO R BALL VALVE (TYPICAL) UNION (TYPICAL) PRESSURE RELIEF VALVE DRAIN PO INT (TYPICAL) MA KE UP WA TE R BOILER CIRCULAT OR BACKFLOW PREVENTER PRESSURE REDUCING VA LVE PRESSURE GAUGE EXPAN SION TANK ZONE CIRCULA TORS (TYPICAL) FLOW CHE[...]

  • Page 8

    8 Installation & Operation Manual SOLUTION BOILER ANTI-SCALD MIX ING VALVE COLD WAT ER IN TEMPERATUR E / PRESSURE GAUGE AIR SEPARATO R BALL VALVE (TYPICAL) UNION (TYPICAL) PRESSURE RELIEF VALVE DRAIN POI NT (TYPICAL) MA KE UP WA TE R HOT WATE R OUT BOILER CIRCULATOR BACKFLOW PREVENTER PRESSURE REDUCING VA LVE PRESSURE GAUGE EXPAN SION TANK ZONE[...]

  • Page 9

    Installation & Operation Manual 9 KNIGHT BOILER DOMESTIC HOT W ATER CIRCULATOR BACKFLOW PREVENTER PRESSURE REDUCIN G VALVE PRESSURE GAUGE ANTI-SCALD MIXING V ALV E COLD WATE R IN TEMPERATUR E / PRESSURE GAUGE AIR SEPARATOR EXPANSIO N TANK BALL VALVE (TYPICAL) UNION (TYPICAL) PRESSURE RELIEF VA LVE DRAIN POI NT (TYPICAL) MAKE UP WA TER FROM SYST[...]

  • Page 10

    Installation & Operation Manual 10 3 Boiler side piping KNIGHT BOILER DOMESTIC HOT W ATER CIRCULATOR TEMPERATURE / PRESSURE GAUGE UNION (TYPICAL) DRAIN DRAIN POINT (TYPICAL) HOT WA TER OUT BOILER CIRCULATOR PRESSURE RELIEF VALVE Y-STRAINER (RECOMMENDED ) COLD WA TER IN ANTI-SCALD MIXING VALVE RECIRCULATION PUMP DRAIN ( FIELD SUPPLY ) RELIEF VAL[...]

  • Page 11

    Installation & Operation Manual 11 4 Domestic side (tank) piping Basic domestic piping Figure 4-2 on page 14 shows typical domestic water piping for a tank. The function of the components shown are as follows: a. Shut-off valves (recommended) - Used to isolate the tank for servicing. b. Backflow Preventer (required by some codes) - Used to prev[...]

  • Page 12

    12 Installation & Operation Manual 4 Domestic side (tank) piping Temperature & pressure (T&P) relief valve For protection against excessive temperatures and pressure, install temperature and pressure protective equipment required by local codes. This equipment shall not be less than a combination temperature and pressure relief valve ce[...]

  • Page 13

    Installation & Operation Manual 13 NOTICE Verify that the combination temperature and pressure relief valve complies with local codes. If the combination temperature and pressure relief valve does not comply with local codes, replace it with one that does. Follow the installation instructions in this section. NOTICE The Lochinvar SIT series wat[...]

  • Page 14

    14 Installation & Operation Manual 4 Domestic side (tank) piping EXPAN SION TANK UNION (TYPICAL) SHOCK ARR ESTOR SHUT-OFF VALVE SHUT-OFF VALVE BACKFLOW PREVENTOR SHUT-OFF VALVE SHUT-OFF VALVE ANTI-SCALD MIX ING VALVE DRAIN ( FIELD SUPPL Y) RECIRCULATI ON PUMP TO BOILER FROM BOIL ER CHECK VA LVE TANK SENSOR/ AQUASTAT SQUIRE Figure 4-2 Recommende[...]

  • Page 15

    Installation & Operation Manual 5 Wiring Indirect water heater sensor setup (Knight boiler) Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation.  CAUTION 1. Install the sensor inside the tank as depicted in FIG. 5-1. 2. Connect the wire leads to the DHW Tank Sensor (AUX) co[...]

  • Page 16

    16 Installation & Operation Manual 5 Wiring Indirect water heater controlled using Aquastat and zone circulator / valve 1. Install Aquastat to tank. Aquastat control (TST20016) can be ordered from your local Lochinvar distributor. 2. Connect Aquastat to the zone controller for the Indirect Water Heater Zone. 3. Adjust Aquastat to the desired te[...]

  • Page 17

    Installation & Operation Manual 17 6 Start-up and check-out 1. Make sure the system is free of leaks and that air is purged from the system. CAUTION Fix any leaks found before proceeding further. Leakage from the boiler piping can result in severe damage to the boiler. 2. Many soldering fluxes contain Zinc Chloride which can cause severe corros[...]

  • Page 18

    18 Installation & Operation Manual 7 Maintenance * Make sure that the rest of the boiler and domestic water piping is free of leaks. * If there is an oil lubricated circulator in the system, make sure it is lubricated as called for by the circulator manufacturer. * Make sure that the boiler is maintained in accordance with the boiler manufactur[...]

  • Page 19

    Installation & Operation Manual 19 8 Performance data Squire Indirect Water Heater I=B=R Rating Indirect Water Heater Model Number Potable Water Volume Gal. Heat Source Water Volume Gal. Standby Heat Loss F/hr Continuous Draw Rating Gal/hr First Hour Rating Gal/ hr Minimum Heat Output Rate from Heat Source Btu/hr Minimum Heat Source Flow Rate G[...]

  • Page 20

    Installation & Operation Manual 20 8 Performance data How to properly Size Your Indirect Water Heater Use the First Hour Rating (FHR) to properly size your Indirect Water Heater. The First Hour Rating is the amount of hot water in gallons the heater can supply per hour (starting with a tank full of hot water), depending on tank capacity, source[...]

  • Page 21

    - Installation & Operation Manual 21 First Hour Rating - 180°F Boiler Loop Water (Knight Boiler - Models SIT030 - SIT050) Model SIT030 SIT040 SIT050 Circulator Flow GPM 5 8 12 16 20 5 8 12 16 20 5 8 12 16 20 Domestic Outlet 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 W[...]

  • Page 22

    Installation & Operation Manual 22 First Hour Rating - 180°F Boiler Loop Water (Universal Sizing - 45,000 - 295,000 Btu/hr) Model SIT030 SIT040 SIT050 Circulator Flow GPM 5 8 12 16 20 5 8 12 16 20 5 8 12 16 20 Domestic Outlet 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140 115 140[...]

  • Page 23

    Installation & Operation Manual 23 Table 8D First Hour Rating 200°F Boiler Loop Water (Universal Sizing) First Hour Rating - 200°F Boiler Loop Water (Universal Sizing - 45,000 - 295,000) Model SIT030 SIT040 SIT050 Circulator Flow GPM 5 8 12 16 20 5 8 12 16 20 5 8 12 16 20 Domestic Outlet 115 140 115 140 115 140 115 140 115 140 115 140 115 140[...]

  • Page 24

    Revision Notes: Revision A (ECO C05265) initial release. Revision B (ECO C05399) reflects the addition of the Pressure Drop Chart and updates made to the Performance Data Charts. Revision C (ECO C05587) reflects the update of tables 3A and 3B (Pressure Drop charts) on page 6, table 4A on page 13, the update of the “Domestic water piping” paragr[...]