Rubbermaid 5L10 manual

1
2
3
4
5
6
7
8
9
10
11
12

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Rubbermaid 5L10, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Rubbermaid 5L10 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Rubbermaid 5L10. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Rubbermaid 5L10 should contain:
- informations concerning technical data of Rubbermaid 5L10
- name of the manufacturer and a year of construction of the Rubbermaid 5L10 item
- rules of operation, control and maintenance of the Rubbermaid 5L10 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Rubbermaid 5L10 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Rubbermaid 5L10, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Rubbermaid service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Rubbermaid 5L10.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Rubbermaid 5L10 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    Congratulations and thank you for pur chasing a Rubbermaid storage building . BEFORE YOU BEGIN – BUILDING CODES Be sure to check your local building codes, ordinances and restrictions, and applicable neighborhood governances. BEFORE YOU BEGIN – SURF ACE PREP ARA TION T o ensure proper assembly and performance your shed needs to be built on a so[...]

  • Page 2

    Description Part Number Assembly Letter Quantity Required T ools T wo Person Assembly Floor Front Floor 5L01 A 1 Walls Left Back 5L04 D 1 Right Back 5L05 F 1 Front Left Side 5L02 G 1 Front Right Side 5L03 H 1 Wall Connector 5H75 Q 5 Doors Left Door 5L06 / 5L41 L 1 Right Door 5L07 / 5L42 K 1 Door Handle 5L74 T 1 Lock Hasp 5F58 X 1 Hardware #14 x 3/4[...]

  • Page 3

    Build a solid, level surface for the shed foundation. Consult your local building authority for ordinances, restrictions, or permits required before building any structure at your home. Note: Minimum dimensions for foundations shown. FLOOR PLAN: Size the construction site to fit the entire floor . OPTIONAL STEP: If desired, recessed anchor locati[...]

  • Page 4

    2 . 0 Floor Installation A Using a rubber mallet and screwdriver , knock out the tabs for the door hinge, 2 places on Front Floor (A) . b . Drill pilot hole through top surface of floor , 2 places on Front Floor (A) . c . A Using a utility knife, cut the long side of each wall slot tab and then use a rubber mallet and screwdriver to knock it out 8[...]

  • Page 5

    3 . 0 W all Panel G Installation Using a screwdriver , punch out the screw holes on the top of Front Left Side (G) 2 places. a . G Screw Holes G A Snap Front Left Side (G) into Front Floor (A) . Hold Front Left Side (G) upright to prevent it from falling (until Left Back (D) is installed). c . G ALIGN ALIGN click A Drill a pilot hole (using 1/8&quo[...]

  • Page 6

    1 2 D G C OVERHEAD VIEW DETAIL 3-1_B SCALE 1/1 DETAIL 3-3_E SCALE 1/1 DETAIL 3-3_B SCALE 1/1 DETAIL 3-4_B AND 3-5_B SCALE 1/1 DETAIL 3-6_B AND 3-7_B SCALE 1/1 3 . 1 W all Panel D Installation Connect Left Back (D) into dovetails of Front Left Side (G) . b . Engage snaps on bottom of Left Back (D) into Front Floor (A) . c . D D Using a screwdriver ,[...]

  • Page 7

    3 . 2 W all Panel H Installation Using a screwdriver , punch out the screw holes on the top of Front Right Side (H) 2 places. a . H H Screw Holes H Snap Front Right Side (H) into Front Floor (A) . Hold Front Right Side (H) upright to prevent it from falling (until Right Back (F) is installed). c . H Drill a pilot hole (using 1/8" drill bit) in[...]

  • Page 8

    Connect Right Back (F) onto dovetails of Front Right Side (H) . Align the lap joint between Left Back (D) and Right Back (F). b . Engage snaps on bottom of Right Back (F) into Front Floor (A) . c . DETAIL 3-1_B SCALE 1/1 DETAIL 3-3_E SCALE 1/1 DETAIL 3-3_B SCALE 1/1 DETAIL 3-4_B AND 3-5_B SCALE 1/1 DETAIL 3-6_B AND 3-7_B SCALE 1/1 HELPFUL HINT : Lu[...]

  • Page 9

    Install Wall Connector (Q) 5 places, connecting Left Back and Right Back Panels (D and F). Position connectors in slots and slide down to snap in place. d . 2 1 1 click D F OVERHEAD VIEW D F Install Wall Connectors Q 4 . 0 Roof Panel J & Door Installation Install Front Roof (J) onto side sections. Align tongues on top of side walls into grooves[...]

  • Page 10

    Ensure Front Roof (J) is positioned against the back wall tongues. From outside the shed, install one Screw (AA) at each corner . Hold the edge of the roof down firmly at the corners while installing each screw . Install remaining screws into remaining locations of back walls. c . AA (8) J 1. 2. 3. Helpful Hint: Installation is easier using a magn[...]

  • Page 11

    From inside the shed, install four Screws (AA) into the roof, two on each side wall. Note: The screws also have to go through the Roof Brace (RB) at each end to properly secure the roof! A second person on the outside of the shed should hold down the edge of the roof firmly at each screw location. e . J Install Left Door (L) and Right Door (K) int[...]

  • Page 12

    5 . 1 Door Finishing Installation Install Lock Hasp (X) into opening on Right Door (K). a . Install Door Handle (T) onto Left Door (L) using four Screws (AA). b . click X K T L AA (4) Printed in U.S.A. 2010 Rubbermaid Incorporated, Huntersville, NC U.S.A. 28078-1801 Customer Service T oll Free: 1-888-895-2110 M–F 8:30 a.m. to 5:00 p.m. EST or vis[...]