Go to page of
Similar user manuals
-
Outdoor Storage
Rubbermaid 5L10
12 pages 7.23 mb -
Outdoor Storage
Rubbermaid 5L40
36 pages 0.93 mb -
Outdoor Storage
Rubbermaid 1S84
16 pages 4.27 mb -
Outdoor Storage
Rubbermaid 5L20
18 pages 14.99 mb -
Outdoor Storage
Rubbermaid P0-5L20-P0
18 pages 12.49 mb -
Outdoor Storage
Rubbermaid P0-5F21-P0
2 pages 0.26 mb -
Outdoor Storage
Rubbermaid 5H80
2 pages 1.15 mb -
Outdoor Storage
Rubbermaid 1S85
9 pages 2.05 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Rubbermaid P0-5L20-P0, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Rubbermaid P0-5L20-P0 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Rubbermaid P0-5L20-P0. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Rubbermaid P0-5L20-P0 should contain:
- informations concerning technical data of Rubbermaid P0-5L20-P0
- name of the manufacturer and a year of construction of the Rubbermaid P0-5L20-P0 item
- rules of operation, control and maintenance of the Rubbermaid P0-5L20-P0 item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Rubbermaid P0-5L20-P0 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Rubbermaid P0-5L20-P0, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Rubbermaid service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Rubbermaid P0-5L20-P0.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Rubbermaid P0-5L20-P0 item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
5L20 76 ¾" 51 ½" 55 ¼" P0-5L20-P0 Note: Be sure to keep this instruction manual and your original store receipt to ensure our Consumer Service Department can accurately and quickly assist you if necessary . Congratulations and thank you for pur chasing a Rubbermaid storage building . BEFORE YOU BEGIN – BUILDING CODES Be sure to [...]
-
Page 2
Description Part Number Assembly Letter Quantity Required T ools T wo Person Assembly Floor Front Floor 5L01 A 1 Repeat Floor 5L11 B 1 Walls Repeat Left Side 5L12 C 1 Left Back 5L04 D 1 Repeat Right Side 5L13 E 1 Right Back 5L05 F 1 Front Left Side 5L02 G 1 Front Right Side 5L03 H 1 Wall Connector 5H75 Q 15 Doors Left Door 5L06 L 1 Right Door 5L07 [...]
-
Page 3
Build a solid, level surface for the shed foundation. Consult your local building authority for ordinances, restrictions, or permits required before building any structure at your home. Note: Minimum dimensions for foundations shown. FLOOR PLAN: Size the construction site to fit the entire floor . OPTIONAL STEP: If desired, recessed anchor locati[...]
-
Page 4
A B 2. 0 Floor Installation A Using a rubber mallet and screwdriver , knock out the tabs for the door hinge, 2 places on Front Floor (A) . c. Drill pilot hole through top surface of floor , 2 places on Front Floor (A) . d. A Using a rubber mallet and screwdriver , punch out the screw holes along the connection edge of Repeat Floor (B) . a. B Using[...]
-
Page 5
A B 2 .1 Floor Installation Connect and align Repeat Floor (B) to Front Floor (A) and install Screws (AA) 9 places; keep panels aligned and even while installing screws. a. AA (9) HELPFUL HINT : Pilot holes may be drilled for the screws using a 1/8" drill bit. CAUTION: Do not overtighten screws. 3. 0 W all Panel C Installation Using a screwdri[...]
-
Page 6
3. 1 W all Panel D Installation Snap Repeat Left Side (C) into the back position of Repeat Floor (B) . b. C ALIGN ALIGN click Hold Repeat Left Side (C) upright to prevent it from falling (until Left Back (D) is installed). c. C D D Using a screwdriver , punch out the screw holes on the top of Left Back (D) 4 places. a. Screw Holes[...]
-
Page 7
1 2 D C C OVERHEAD VIEW DETAIL 3-1_B SCALE 1/1 DETAIL 3-3_E SCALE 1/1 DETAIL 3-3_B SCALE 1/1 DETAIL 3-4_B AND 3-5_B SCALE 1/1 DETAIL 3-6_B AND 3-7_B SCALE 1/1 Connect Left Back (D) into dovetails of Repeat Left Side (C) . b. Engage snaps on bottom of Left Back (D) into Repeat Floor (B) . c. HELPFUL HINT : Lubricate dovetails with liquid soap. D 1 2[...]
-
Page 8
Snap Repeat Right Side (E) into the back position of Repeat Floor (B) . b. Hold Repeat Right Side (E) upright to prevent it from falling (until Right Back (F) is installed). c. E ALIGN ALIGN click click 3.3 W all Panel F Installation Using a screwdriver , punch out the screw holes on the top of Right Back (F) 4 places. a. F F Screw Holes[...]
-
Page 9
Connect Right Back (F) onto dovetails of Repeat Right Side (E) . Align the lap joint between Left Back (D) and Right Back (F). b. Engage snaps on bottom of Right Back (F) into Repeat Floor (B) . c. DETAIL 3-1_B SCALE 1/1 DETAIL 3-3_E SCALE 1/1 DETAIL 3-3_B SCALE 1/1 DETAIL 3-4_B AND 3-5_B SCALE 1/1 DETAIL 3-6_B AND 3-7_B SCALE 1/1 HELPFUL HINT : Lu[...]
-
Page 10
Drill a pilot hole (using 1/8" drill bit) in front lower corner at location indicated by screw target. Note: This pilot hole is to be drilled through both walls. b. 3.4 W all Panel G Installation Align the lap joint between Repeat Left Side (C) and Front Left Side (G). c. Using a screwdriver , punch out the screw holes on the top of Front Left[...]
-
Page 11
Snap Front Left Side (G) into Front Floor (A) . d. 2 1 click ALIGN ALIGN G Install Wall Connector (Q) 5 places, connecting Repeat Left Side (C) and Front Left Side (G). Position connectors in slots and slide down to snap in place. e. 2 1 click OVERHEAD VIEW G G 1 Q C 3.5 W all Panel H Installation H H Screw Holes Using a screwdriver , punch out the[...]
-
Page 12
Align the lap joint between Front Right Side (H) and Repeat Right Side (E). c. H Drill a pilot hole (using 1/8" drill bit) in front lower corner at location indicated by screw target. Note: This pilot hole is to be drilled through both walls. b. OVERHEAD VIEW DETAIL 3-1_B SCALE 1/1 DETAIL 3-3_E SCALE 1/1 DETAIL 3-3_B SCALE 1/1 DETAIL 3-4_B AND[...]
-
Page 13
4 .0 Roof Panel M (back position) Installation M RB Install one Repeat Roof (M) onto back section. The overlap edge of roof points toward the back of the shed. Align tongues on top of back wall to the outside of the roof panel overlap. Align tongues on top of side walls into grooves in roof. a. Slightly raise front edge of roof enough to allow posi[...]
-
Page 14
From inside the shed, install four Screws (AA) into the roof, two on each side wall. Note: The screws also have to go through the Roof Brace (RB) at each end to properly secure the roof! A second person on the outside of the shed should hold down the edge of the roof firmly at each screw location. d. RB M AA (4) Ensure Repeat Roof (M) is positione[...]
-
Page 15
4 .2 Roof Panel J (front position) & Door Installation Install one Front Roof (J) onto front section: roof gable edge toward front of shed. Align tongues on top of side walls into grooves in roof. a. Slightly raise front edge of roof enough to allow positioning of Roof Brace (RB) onto the side walls as shown. Lower the roof onto the walls and a[...]
-
Page 16
From inside the shed, install four Screws (AA) into the roof, two on each side wall. Note: The screws also have to go through the Roof Brace (RB) at each end to properly secure the roof! A second person on the outside of the shed should hold down the edge of the roof firmly at each screw location. e. Make sure Front Roof (J) is positioned tightly [...]
-
Page 17
5. 0 Finishing Installation Install Screws (AA) into 8 locations shown at bottom of wall panels to secure walls to floor . a. AA (8) HELPFUL HINT : Pilot holes may be drilled for the screws. CAUTION: Do not overtighten screws. 5 .1 Door Finishing Installation Install Lock Hasp (X) into opening on Right Door (K). a. Install Door Handle (T) onto Lef[...]
-
Page 18
Printed in U.S.A. 2010 Rubbermaid Incorporated, Huntersville, NC U.S.A. 28078-1801 Customer Service T oll Free: 1-888-895-2110 M–F 8:30 a.m. to 5 p.m. EST or visit us at www .rubbermaid.com MAINTENANCE & SAFETY • Periodically check shed to assure it remains stable and the site remains level. • In areas of high winds it is recommended to a[...]