A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Smith Cast Iron Boilers GS110W, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Smith Cast Iron Boilers GS110W one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Smith Cast Iron Boilers GS110W. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Smith Cast Iron Boilers GS110W should contain:
- informations concerning technical data of Smith Cast Iron Boilers GS110W
- name of the manufacturer and a year of construction of the Smith Cast Iron Boilers GS110W item
- rules of operation, control and maintenance of the Smith Cast Iron Boilers GS110W item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Smith Cast Iron Boilers GS110W alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Smith Cast Iron Boilers GS110W, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Smith Cast Iron Boilers service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Smith Cast Iron Boilers GS110W.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Smith Cast Iron Boilers GS110W item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    GS110W NA TURAL OR PR OP ANE GAS BOILERS INST ALLA TION & OPERA TION MANU AL GS110IOM-2 INST ALLER, THESE INSTR UCTIONS T O BE AFFIXED ADJA CENT T O THE HEA TER. CONSUMER, RET AIN THESE INSTR UCTIONS FOR FUTURE REFERENCE PURPOSES. W ARNING: If the information in this man ual is not follo wed exactl y , a fire or explosion ma y result causing pr[...]

  • Page 2

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 2 A VERTISSMENT . Assurez-v ous de bien suivre les instructions données dans cette notice pour réduire au minim um le risque d’incendie ou d’explosion ou pour éviter tout dommoge matériel, toute blessure ou la mort Ne pas entreposer ni utiliser d’essence ou ni d’a[...]

  • Page 3

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 3 Figure 1 - Clearances to Combustib le Construction The installation must conf or m to the requirements of the authority having jurisdiction or , in the absence of such requirements, to the National Fuel Gas Code , ANSI Z223.1-latest re vision. In Canada, the installation mu[...]

  • Page 4

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 4 All Combustion Air Fr om Inside The Building Older houses often hav e enough “leakage” to pro vide an adequate amount of combustion air pro vided that the demand f or combustion air is not too great, Figure 3. Homes that are relatively ne w or “tight” will most like[...]

  • Page 5

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 5 When calculating the free area necessar y to meet the make-up air requirements of the enclosure , consideration must be giv en to the bloc kage effects of louvers , grills and screens. Screens must ha ve a minimum mesh siz e of 1/4" (6.4mm). If the free area through a [...]

  • Page 6

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 6 Intake Air Option - General Guidelines This configuration provides comb ustion air directly to the boiler using a dedicated pipe. Combustion air can be dra wn in hor izontally through an outside w all or ver tically through the roof , see Figures 6, 7, 8, 9 & 10. W ARNI[...]

  • Page 7

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 7 Figure 6 - V er tical P ositive Pressure V enting with Outdoor Combustion Air (Cat. III) All joints in metal intake air systems m ust be secured using corrosion resistant f asteners and sealed using a suitable Silicone caulk. If PVC or CPVC is used, the joints must be clean[...]

  • Page 8

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 8 Figure 7 - Horizontal P ositive Pressure V enting with Outdoor Combustion Air Figure 8 - Horizontal P ositive Pressure V enting with Outdoor Combustion Air Smit h[...]

  • Page 9

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 9 Figure 9 - V er tical Negative Pressure Masonry Chimney System using Outside Comb ustion Air (Cat. I) Figure 10 - V er tical P ositive Pressure V enting using Outside Comb ustion Air (Cat. III)[...]

  • Page 10

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 10 Cer tified v ent systems are manufactured b y the following companies: Heat-f ab , Inc. 130 Industrial Blvd., T ur ners F alls, MA 01376 (800) 772-0739. Z-Flex U.S., Inc. 20 Commerce P ar k North, Bedford, NH 03110-6911 (800) 654-5600. Protech Systems Inc. 26 Ganse voor t [...]

  • Page 11

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 11 Horizontal v ent systems shall ter minate at least 4 feet (1.3 m) below , 4 f eet (1.3 m) hor izontally from or 1 f oot (0.23 m) abov e any door , window or gra vity air inlet into any b uilding. It must not terminate less than 4 feet (1.3 m) horizontally from, and in no c[...]

  • Page 12

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 12 VER TICAL VENT POSITIVE PRESSURE SYSTEMS See Figure 11. The vent materials used in vertical positive pressure vent systems must be certified to UL 1738 for installations in the United States, ULS636 for installations in Canada. The maximum v ent lengths are listed in T abl[...]

  • Page 13

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 13 Figure 11 - V er tical P ositive Pressure V enting (Cat. III) The vent connector should be sloped up to ward the chimney 1/4" per foot. Ensure that the vent connector is properly supported and each connection securely fastened with at least 3 corrosion resistant sheet[...]

  • Page 14

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 14 Dans la mesure du possible , fermer toutes les portes et les fenêtres du bâtiment et toutes les portes entre l'espace où les appareils toujours raccordés du système d'év acuation sont installés et les autres espaces du bâtiment. Mettre en marche les séch[...]

  • Page 15

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 15 W ARNING: Failure to connect a condensate trap or pump to the flue collector can result in excessive le vels of carbon monoxide whic h can cause severe per sonal injur y or death! HEA TING SYSTEM PIPING CA UTION: All heating system piping m ust be installed in accor dance [...]

  • Page 16

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 16 Ensure that the boiler is level from front to back and from side to side. Use metal shims to le vel the boiler . NEVER use combustible materials for shims. Bypass Piping CA UTION: Never connect this boiler directl y to a large v olume system, in-floor radiant system, sno w[...]

  • Page 17

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 17 Piping For Use With Cooling Units The boiler , when used in connection with a refrigera-tion system must be installed so the chilled medium is piped in parallel with the boiler . Appropriate valves m ust be used to prevent the chilled water from entering the boiler . When [...]

  • Page 18

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 18 GAS SUPPL Y PIPING The GS110 hot water boiler comes from the f actor y ready to be piped to the gas supply . The gas supply can be piped from the left or right side of the boiler . If f or any reason the boiler is not for the type of gas av ailable at the installation site[...]

  • Page 19

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 19 installed in Canada. Install a separate 120 volt 15 amp circuit f or the boiler . A properly rated shut-off switch should be located at the boiler . The boiler must be grounded in accordance with the authority having jurisdiction, or if none, the latest re vision of the Na[...]

  • Page 20

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 20 Figure 19A - Wiring Connection Diagram[...]

  • Page 21

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 21 Figure 19B - Wiring Ladder Dia gram B[...]

  • Page 22

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 22 W ARNING: If you do not follo w these instrucitons exactl y , a fire or explosion may result causing property damage, personal injury or loss of life. FOR Y OUR SAFETY READ BEFORE OPERA TING A . This appliance does not hav e a pilot. It is equipped with an ignition de vice[...]

  • Page 23

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 23 POUR V O TRE SÉCURITÉ LISEZ A V ANT DE METTRE EN MARCHE INSTRUCTIONS DE MISE EN MARCHE COÙPURE DE L'ARRIVE DE GAZ A LA CHA UDIERE A VERTISSEMENT . Quinconque ne respecte pas à la lettre les instructions dans la présente notice risque de déclenc her un incendie o[...]

  • Page 24

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 24 BOILER SET UP NO TE: Before starting the boiler , turn off the electrical supply going to it. Make sure that gas is av ailable at the gas valve inlet. Open the valves in the return and supply piping. Failure to take these precautions will prevent the boiler fr om operation[...]

  • Page 25

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 25 Figure 20- Air and Manifold Pressure BOILER CHECKING & ADJUSTMENT INPUT RA TE Gas appliances are rated based on sea level operation with no adjustment required at elevations up to 2000 f eet. At ele vations abov e 2000 f eet, input ratings should be reduced by 4% for e[...]

  • Page 26

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 26 Main Burner Flame A properly adjusted main burner flame will produce a tight blue flame pattern about 1/2 inch tall from the burner’ s surf ace, Figure 21. A yellow floating or tall stringy flame is not nor mal and must be corrected. W ARNING: Y ellow , floating flames i[...]

  • Page 27

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 27 INSTR UCTIONS T O THE INST ALLER The INST ALLER must giv e this copy of the INST AL- LA TION AND OPERA TING INSTR UCTIONS to the boiler owner and make sure that the owner or operator has a basic understanding of the following: 1 . The operating instructions, the type of ig[...]

  • Page 28

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 28[...]

  • Page 29

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 29 SER VICE AND REPLA CEMENT P AR TS LIST 1 Rear , T op , Front & Inner P anels 59450 1 59451 1 59452 1 59453 1 59454 1 2 Left Jacket Side Panel 59495 11111 3 Right Jacket Side Panel 59496 11111 4 Gas V alve , White Rodgers 36E65 50064 1 1 1 Gas V alve, White Rodgers 36D2[...]

  • Page 30

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 30 Ref # Name of Part P a r t # 34567 Model Size with Item Quantities Below 29 Thermal Switch 59481 11111 30 Block Assemb ly 72076 1 72077 1 72078 1 72079 1 72080 1 31 Jacket Bracket 59456 66666 32 Frame Cross Members 59459 1 59460 1 59461 1 59462 1 59463 1 33 Flue Collector [...]

  • Page 31

    GS110 DIRECT VENT BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Page 31[...]

  • Page 32

    260 NORTH ELM STREET WESTFIELD, MA 01085 TEL. (413) 562-9631 F AX: (413) 562-3799[...]