Go to page of
Similar user manuals
-
Network Router
Cisco Systems SN 5428-2
16 pages 0.12 mb -
Network Router
Cisco Systems OL-17037-01
80 pages 1.47 mb -
Network Router
Cisco Systems OL-11497-03
344 pages 11.99 mb -
Network Router
Cisco Systems SCE 1000 2xGBE
131 pages 1.06 mb -
Network Router
Cisco Systems 861WGNPK9RF
66 pages 2.45 mb -
Network Router
Cisco Systems AIRCT576025K9
36 pages 2.61 mb -
Network Router
Cisco Systems OL-27407-01
254 pages 12.51 mb -
Network Router
Cisco Systems 831
16 pages 0.08 mb
A good user manual
The rules should oblige the seller to give the purchaser an operating instrucion of Cisco Systems SCE 2000 4xGBE, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.
What is an instruction?
The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Cisco Systems SCE 2000 4xGBE one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.
Unfortunately, only a few customers devote their time to read an instruction of Cisco Systems SCE 2000 4xGBE. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.
What should a perfect user manual contain?
First and foremost, an user manual of Cisco Systems SCE 2000 4xGBE should contain:
- informations concerning technical data of Cisco Systems SCE 2000 4xGBE
- name of the manufacturer and a year of construction of the Cisco Systems SCE 2000 4xGBE item
- rules of operation, control and maintenance of the Cisco Systems SCE 2000 4xGBE item
- safety signs and mark certificates which confirm compatibility with appropriate standards
Why don't we read the manuals?
Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Cisco Systems SCE 2000 4xGBE alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Cisco Systems SCE 2000 4xGBE, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Cisco Systems service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Cisco Systems SCE 2000 4xGBE.
Why one should read the manuals?
It is mostly in the manuals where we will find the details concerning construction and possibility of the Cisco Systems SCE 2000 4xGBE item, and its use of respective accessory, as well as information concerning all the functions and facilities.
After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.
Table of contents for the manual
-
Page 1
Corporate Headquarters Cisco S ystem s, In c. 170 West Tasman Driv e San Jose, CA 9 5134-1706 USA http://www.cisco.com Tel: 408 526-4000 800 553-NETS ( 6387) Fax: 408 526-4100 Customer Order Number: DOC-7824-02= Text Part Number: OL -7824-02 SCE 2000 4xGBE Inst allation and Configuration Guide Version 2.5.7 OL-7824-02[...]
-
Page 2
THE SPECIFICATIONS AND INFORMATION REGARDING THE PRO DUCTS IN THIS MANUAL ARE SUBJ ECT TO CHANGE WI THOUT NOTICE. ALL S TATEMENTS, INFORMATION, AND RECOMMENDATIONS IN THIS MANUAL ARE BELI EVED TO BE ACCURATE BUT ARE P RESENTED WITHOUT WARRANTY OF ANY KIN D, EXPRESS OR IMPLIED. USERS MUST TAKE FULL RESPONS IBILITY FOR THEIR APPLICATION OF ANY PRODUC[...]
-
Page 3
SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 i Preface v Audience v Organization vi Related Publications vii Document Conventions viii Obtaining Documentation ix Cisco.com ix Documentation Feedback ix Obtaining Technical Assistance ix Cisco Technical Support Website ix Submitting a Service Request x Definitions of Service Request [...]
-
Page 4
Content s SCE 2000 4xGBE Installation and Configuration Guide ii OL-7824-02 Functionality 3-2 Number of links 3-2 Redundancy 3-2 Link Continuity 3-3 Physical Topologies 3-4 Single SCE 2000 Topologies 3-4 Two Cascaded SCE 2000s For Dual Links 3-6 Topology-Related Parameters 3-7 Installation and Maintenance 4-1 Preparing to Install the SCE 2000 Platf[...]
-
Page 5
Contents SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 iii Step 1: Configuring Initial Settings 5-6 Step 2: Configuring the Hostname 5-7 Step 3: Setting the Passwords 5-7 Step 4: Configuring Time Settings 5-8 Step 5: Configuring the DNS Settings 5-10 Step 6: Configuring the RDR Formatter Destination 5-12 Step 7: Configuring Access [...]
-
Page 6
Content s SCE 2000 4xGBE Installation and Configuration Guide iv OL-7824-02 Rebooting the SCE Platform 7-11 Shutting Down the SCE Platform 7-12 Troubleshooting 8-1 Troubleshooting Overview 8-1 Troubleshooting Tools 8-2 Problem Solving Using a Subsystems Approach 8-9 Identifying Startup Problems 8-9 Troubleshooting the Power Subsystem 8-9 Troublesho[...]
-
Page 7
SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 v This preface describes who should read the SCE 2000 4xGBE Installation and Configuratio n Guide , how it is or ganized, a nd its document conventions Audience This guide is for the networking or computer tec hnician responsible for installing and confi guring the SCE 2000 platform on-[...]
-
Page 8
Preface Organization SCE 2000 4xGBE Installation and Configuration Guide vi OL-7824-02 Organization The major sections of this guide are as follows: Chapter Title Description 1 Introduction (on page 1-1 ) This chapte r provides a brief int roduction t o Cisco Se rvice Control. 2 Overview ( on page 2-1 ) This chapte r provides a hardw are overvie w [...]
-
Page 9
Preface Related Publications SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 vii Related Publications Y our SCE 2000 platform and the software running on it contain extensive features and functionality , which are documented in the following resources: • Cisco CLI software: • Cisco Service Control Engine (SCE) Softw are Conf igur[...]
-
Page 10
Preface Document Conventions SCE 2000 4xGBE Installation and Configuration Guide viii OL-7824-02 Document Conventions Command descriptions use the following conventions: boldface font Commands a nd keyw ords are i n boldface . italic font Arguments for whic h you sup ply values are in i talics . [ ] Elements in square brackets are optional. {x | y [...]
-
Page 11
Preface Obtaining Documentation SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 ix Obtaining Documentation Cisco documentation and additiona l literature are available on Cisco.com http://www .cisco.com . Cisco also provides several ways to obtain technical assistance and other technical resources. These sections explain how to obtai[...]
-
Page 12
Preface Obtaining Additional Public ations and Information SCE 2000 4xGBE Installation and Configuration Guide x OL-7824-02 Submitting a Service Request Using the online T AC Service Request T ool ( http://www .cisco.com/techsupport/servicerequest ) is the fastest way to open S3 and S4 service requests. (S3 and S4 service requests are those in whic[...]
-
Page 13
Preface Obtaining Additional Public ations and Information SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 xi • Cisco Pr ess ( http://www .ciscopress.com ) publishes a wide range of general networking, training and certification titles. Both new a nd experienced users will benefit from these publications. For current Cisco Press ti[...]
-
Page 14
[...]
-
Page 15
SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 1-1 This chapter contains the following sections: • SCE Platform Management Interfaces 1-2 The Service Control Engine family of programmable network devices is capable of performing stateful flow inspection of IP traffic, and contro lling that traffic based on configur able rules. The[...]
-
Page 16
Chapter 1 Introduction SCE Platform Management Interfaces SCE 2000 4xGBE Installation and Configuration Guide 1-2 OL-7824-02 SCE Platform Management Interfaces Y ou can manage the SCE 2000 platform through either of its managem ent interfaces, CLI or SNMP . Both these interfaces provide management access to the same database of the SCE 2000 platfor[...]
-
Page 17
SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 2-1 This chapter provides a brief overview of the Ci sco Service Control concept and an introduction to the SCE 2000 4xGBE Platform, the Service Control hardware component. This chapter contains the following sections: • Service Control and the SCE Platform 2-1 • Front Panel 2-3 •[...]
-
Page 18
Chapter 2 Overview of the SCE 2000 Platform Service Control and the SCE Platform SCE 2000 4xGBE Installation and Configuration Guide 2-2 OL-7824-02 T able 2-1 SCE Platf o rm Model Information Model number SCE 2020 4xGBE Link Type Gigabit Ethe rnet Number of Port s 4 Number of Links 2 Service Control Management The Service Control solution includes [...]
-
Page 19
Chapter 2 Overview of the SCE 2000 Platform Front Panel SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 2-3 Front Panel The SCE 2000 Front Panel consists of ports and LED s as shown in the following figure and tables. Figure 2-2: SE20 00 Front Panel[...]
-
Page 20
Chapter 2 Overview of the SCE 2000 Platform Front Panel SCE 2000 4xGBE Installation and Configuration Guide 2-4 OL-7824-02 T able 2-2 SCE 2000 Por ts Port Quantity Description Connect This Port To… Mng1/ Mng2 2 10/100/1 000 Ether net RJ-45 ports for manageme nt of the SCE 2000 . Mng 2 is cu rrently not operational . CLI designatio n: 0/ 0. A LAN [...]
-
Page 21
Chapter 2 Overview of the SCE 2000 Platform Front Panel SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 2-5 LED Groups Description Bypass • Continuous green: indi cates that the traffi c bypasses the SCE 2000 through an internal electri cal bypass m odule. Single SCE 2000 topol ogy: The SCE 2000 is either i n bypass o r sniffing mo[...]
-
Page 22
Chapter 2 Overview of the SCE 2000 Platform Back Panel SCE 2000 4xGBE Installation and Configuration Guide 2-6 OL-7824-02 Back Panel The SCE 2000 platform back-panel contains the following components: • T wo field-replaceable power supply units with ON/OFF switches • A field-replaceable fan drawer • Ground connections • T wo connectors to t[...]
-
Page 23
Chapter 2 Overview of the SCE 2000 Platform Checking the Shipping Container Contents SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 2-7 Checking the Shipping Container Contents Use the SCE 2000 Components List to check the contents of the SCE 2000 platform shipping container . Do not discard the shipping container . Y ou need the co[...]
-
Page 24
Chapter 2 Overview of the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide 2-8 OL-7824-02 Note W e no long er ship the entire SCE 2000 documentation set automatically with each system . Y ou must specifically or der the docum entation as part of the sales order . If you ordered d ocumentati on and did not receive it, we will sh[...]
-
Page 25
Chapter 2 Overview of the SCE 2000 Platform SCE 2000 Installation Checklist SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 2-9 T able 2-5 SCE 2000 Installa tio n Chec klist Task Verified By Date Date SCE 2000 received SCE 2000 and all accessories unpacked Safety recomm endations an d guideli nes reviewed Topology verified: n umber o[...]
-
Page 26
[...]
-
Page 27
SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 3-1 This chapter describes the possible deployment topologies of the SCE 2000 . The Cisco SCE solution offer s a number of basic topolog y options that permit the user to tailor the SCE Platform to fit the needs of a particular installation. An understanding of the various issues and op[...]
-
Page 28
Chapter 3 T opology T opology Consider ations SCE 2000 4xGBE Installation and Configuration Guide 3-2 OL-7824-02 • Number of links: The SCE 2000 m ay be connected to one or tw o GBE links. This is relevant for both bump-in-the-wire and Receive-Only topologies. • Redundancy: Must the system be designed to guarantee uninterrupt ed SCE 2000 functi[...]
-
Page 29
Chapter 3 T opology T opology Consider ations SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 3-3 Link Continuity The bypass mechanism of the SCE 2000 allows traffic to continue to flow , if desired, even if the device itself is not functioning. Note that when the SCE 2000 is connected to the network throug h an optical splitter , a [...]
-
Page 30
Chapter 3 T opology Physical T opologies SCE 2000 4xGBE Installation and Configuration Guide 3-4 OL-7824-02 Single Link: Receive-only T opology In this topology , an optical sp litter resides physically on the GBE link between the subscribers and the network. The traf fic passes through the op tical splitter, which splits traf fic to the SCE 2000 .[...]
-
Page 31
Chapter 3 T opology Physical T opologies SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 3-5 Single Link: Inline T opology T y pically , the SCE 2000 is connected in a full duplex GBE link bet ween two devices (Router , BRAS, etc.). When the SCE 2000 is installed as a bum p-in-the-wire, it physically resides on the data link between [...]
-
Page 32
Chapter 3 T opology Physical T opologies SCE 2000 4xGBE Installation and Configuration Guide 3-6 OL-7824-02 Dual Link: Receive-Only T opology In this topology , one SCE 2000 is connected in receive-only m ode to two full duplex, GBE links using optical splitters. If the two links are load-s hared, asymmetrical routing might occur , and some of the [...]
-
Page 33
Chapter 3 T opology Physical T opologies SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 3-7 T wo Cascaded SCE 2000s: Inline T opology This topology allows both control and monitori ng functionality where re dundancy is required and “inline” connection is used. The two SC E 2000 s are cascaded, so the primary SCE 2000 process the[...]
-
Page 34
Chapter 3 T opology Physical T opologies SCE 2000 4xGBE Installation and Configuration Guide 3-8 OL-7824-02 SCE 2000 Configuration There are four topology-related parameters: • Connection mode : Can be any one of the following, depending on the physical installation of the SCE 2000 : • Inline: single SCE 2000 inline • Receive-only: single SCE[...]
-
Page 35
Chapter 3 T opology Physical T opologies SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 3-9 Physically Connected Links Parameter If the system consists of more than one device, this parameter defines which link is connected to this SCE 2000 . Currently the system supports a maximum of two links, which are designated link 0 and link [...]
-
Page 36
[...]
-
Page 37
SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-1 This chapter explains how to install a SCE 2000 platform in a rack or in a general tabletop or workbench installation. Additionally , this chapter contains instructions for install ing or replacing the power supply units and fan modules. Warning Before you install, operate, or servi[...]
-
Page 38
Chapter 4 Installation and Maintenance Preparing to Install the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide 4-2 OL-7824-02 Figure 4-1: SCE 2000 Measur ements T able 4-1 SCE 2000 Dimensio ns Dimension Measurement Height 3.47 inches (9.5 cm) Width 17.4 inches (4.43 cm ) Depth 18 inches (4.6 cm ) Weight 33 lb (15 kg) T ools a[...]
-
Page 39
Chapter 4 Installation and Maintenance Preparing to Install the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-3 • Rack-mounting kit (option al) • A new AC-input or DC-input power supply • A new fan module Site Requirement Guidelines The environmental monitoring functionality in the SCE 2000 protects the sy[...]
-
Page 40
Chapter 4 Installation and Maintenance Installing the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide 4-4 OL-7824-02 Site Requirement s The following tables contain the site requirement specifications for the SCE 2000 . T able 4-2 SCE 2000 Environmental Requirements Specification Acceptable Range Temperature - nominal 41°F to[...]
-
Page 41
Chapter 4 Installation and Maintenance Installing the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-5 If you are not rack-mounting your SCE 2000 , place it on a sturdy tabletop or workbench. A rubber feet kit is included for tabletop installations. This section provides instructions fo r the physical installatio[...]
-
Page 42
Chapter 4 Installation and Maintenance Installing the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide 4-6 OL-7824-02 Installing the SCE 2000 on a Workbench or T abletop Y ou can install the SCE 2000 platform on any flat surface as long as the surface is large enough for the SCE 2000 (see the table in SCE 2000 Dimensions), and [...]
-
Page 43
Chapter 4 Installation and Maintenance Installing the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-7 Rack-Mounting a SCE 2000 Platform Y ou can mount the SCE 2000 platform to a 19” rack. There are two standard types of equipment racks, and the appropriate brackets for ea ch are provided in the enclosed kit. ?[...]
-
Page 44
Chapter 4 Installation and Maintenance Installing the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide 4-8 OL-7824-02 Att aching the Bracket s to the SCE 2000 Before installing the SCE 2000 in the rack, you must first install an appropriate rack-m ount bracket on each side of the front of the SCE 2000 , as illustrated in the fo[...]
-
Page 45
Chapter 4 Installation and Maintenance Installing the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-9 Figure 4-5: A ttaching the Mounting Br ack ets (2-post) Step 3 Repeat steps 1 and 2 on the other side of the SCE 2000 . This completes the steps for attaching the rack -mount brackets to the SCE 2000 . If mounti[...]
-
Page 46
Chapter 4 Installation and Maintenance Installing the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide 4-10 OL-7824-0 2 T o install the crossrail supports on a four-post r ack (both front an d back posts), complete the following steps: Step 1 Assemble the two crossrail supports as illu strated below . Use three screws for each [...]
-
Page 47
Chapter 4 Installation and Maintenance Installing the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-11 Step 4 Insert and tighten two screws to the Back posts of the rack. Figure 4-7: A ttaching the Crossrails t o the Rack Step 5 Repeat steps 2 through 4 on the other side of the rack, keeping the brackets flush a[...]
-
Page 48
Chapter 4 Installation and Maintenance Installing the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide 4-12 OL-7824-0 2 A rack with both front and back posts will have th e cro ssrail supports installed. Slid e the SCE 2000 onto these crossrails and push it all the way back. Figure 4-8 : Sliding the SCE 2000 into t he Rack[...]
-
Page 49
Chapter 4 Installation and Maintenance Installing the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-13 Step 4 While keeping the brackets flush against the posts or m ounting strips, align the holes in the brackets with the holes on the rack or m ounting strip. Figure 4-9: Securing the SCE 20 00 to the Rack Step [...]
-
Page 50
Chapter 4 Installation and Maintenance Installing the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide 4-14 OL-7824-0 2 T o connect the grounding cable to the chassis grounding connector on the SCE 2000 , complete the following steps: Step 1 From the enclosed Grounding kit, remove th e necessary materials: the grounding cable ([...]
-
Page 51
Chapter 4 Installation and Maintenance Installing the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-15 Figure 4-11: Gr ounding the Unit (DC) This completes the procedure for installing the SCE 2000 chassis. Proceed to the next section, Connecting to the Power Supply , to continue the installation.[...]
-
Page 52
Chapter 4 Installation and Maintenance Power Supply Overview SCE 2000 4xGBE Installation and Configuration Guide 4-16 OL-7824-0 2 Power Supply Overview The SCE 2000 is available in two power options: • Dual line feed AC power: SCE 2000 is shipped with two appropr iate AC power supply cords. • Dual line feed DC power: requires appropriate cables[...]
-
Page 53
Chapter 4 Installation and Maintenance Power Supply Overview SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-17 The handle of the DC unit is at the top of the unit. Figure 4-13: DC Po w er Modul e LEDs The following LEDs are used to monitor the functioning of the power supply u nits: • On the power supply unit (both AC-input and [...]
-
Page 54
Chapter 4 Installation and Maintenance Power Supply Overview SCE 2000 4xGBE Installation and Configuration Guide 4-18 OL-7824-0 2 T a ble 4-5 OK LED Status for A C-input and DC-input Pow er Supply Units LED State Power Supply Unit Condition On (green) Th e outpu t vo ltage is in the re quired range (between 11.9 and 12.1 VDC) . Off The output vo lt[...]
-
Page 55
Chapter 4 Installation and Maintenance Removing and Replaci ng a Power Supply Unit SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-19 Note For AC-input power , we recommend p owering the SCE 2000 platform fr om a 120 V AC, 15A receptacle U.S. (240 V AC, 10A international) at the power source. Removing and Replacing a Power Supply U[...]
-
Page 56
Chapter 4 Installation and Maintenance Removing and Replaci ng a Power Supply Unit SCE 2000 4xGBE Installation and Configuration Guide 4-20 OL-7824-0 2 Powering Down an AC-Input Power Suppl y T o power down an AC-input power supply to the SCE 2000 platform, complete the following steps: Warning Make sure that the power supply unit is switched off b[...]
-
Page 57
Chapter 4 Installation and Maintenance Removing and Replaci ng a Power Supply Unit SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-21 Step 4 Remove the screw from one DC power line input lead receptacle and pull the lead from the connector . Repeat this step for the remaining lead. This completes the procedure for powering down a D[...]
-
Page 58
Chapter 4 Installation and Maintenance Removing and Replaci ng a Power Supply Unit SCE 2000 4xGBE Installation and Configuration Guide 4-22 OL-7824-0 2 Note The power supply is not fully seated un til you tig hten the installation screw on the faceplate. This completes the procedures for replacing a power supply in a SCE 2000 platform. Reconnecting[...]
-
Page 59
Chapter 4 Installation and Maintenance Removing and Replaci ng a Power Supply Unit SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-23 Note For AC-input power , we recommend p owering the SCE 2000 platform fr om a 120 V AC, 15A receptacle U.S. (240 V AC, 10A international) at the power source. 15 A branch circui t protectio n is rec[...]
-
Page 60
Chapter 4 Installation and Maintenance Removing and Replaci ng a Power Supply Unit SCE 2000 4xGBE Installation and Configuration Guide 4-24 OL-7824-0 2 Step 3 Insert one receptacle screw into the hex or loop connector on one p ower line input, insert the screw with the connector into the co rresponding lead receptacle and tighten the receptacle scr[...]
-
Page 61
Chapter 4 Installation and Maintenance Fan Module Overview SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-25 This completes the steps for reconnec ting the DC-input power supply to the SCE 2000 platform . Fan Module Overview The fan module provides cooling for the internal components. The fan drawer is a field- replaceable unit co[...]
-
Page 62
Chapter 4 Installation and Maintenance Fan Module Overview SCE 2000 4xGBE Installation and Configuration Guide 4-26 OL-7824-0 2 ESD Warning Do not remove or install modules without usi ng appropriate anti-static guard m easures. T he SCE 2000 includes an anti-static wrist strap in t he accessory kit. Attach the copper tape strap to an unpainted m e[...]
-
Page 63
Chapter 4 Installation and Maintenance Fan Module Overview SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 4-27 Step 3 Gently , but firmly , slide the module into the chassis until its faceplate is flush with the chassis rear panel. Figure 4-17: Inser ting th e Fan Module Warning When inserting a fan m odule into the SCE 2000 platf o[...]
-
Page 64
Chapter 4 Installation and Maintenance Replacing the Battery SCE 2000 4xGBE Installation and Configuration Guide 4-28 OL-7824-0 2 Replacing the Battery The SCE 2000 has a lithium battery on its main circuit board. When the battery loses its charge, call Cisco T echnical Support to replace the battery . Warning Do not attempt to replace this battery[...]
-
Page 65
SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-1 This chapter explains how to connect the SCE 2000 platform to a local console and perform the initial system configuration via the setup wizard that runs automatically . Additionally , this chapter contains instructi ons for cabling the Fast Ethernet Managem ent interface. Note When[...]
-
Page 66
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Connecting the Local Cons ole SCE 2000 4xGBE Installation and Configuration Guide 5-2 OL-7824-02 Setting Up the Local Console This section provides instructions for setting up your local term inal at your workstation, to enable you to perform the initial sys[...]
-
Page 67
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-3 Step 4 Press Enter several times until the Cisco logo appears on the local terminal and the setup configuration dialog is entered. --- System Configuration Dialog[...]
-
Page 68
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide 5-4 OL-7824-02 admin passwo rd Admin level p assword. Character string from 4-100 character s beginni ng with an al pha character . root passwo rd Root level password. Character[...]
-
Page 69
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-5 SNMP agent st atus Enabl e or disabl e SNMP managem ent. GET community nam es Community strings to a llow GET access and associated ACLs (m axim um 20). SET commu[...]
-
Page 70
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide 5-6 OL-7824-02 • In certain cases, there will be two or more logi cally related parameters within a menu. In these situations, it is not permitted to jum p to the end of the s[...]
-
Page 71
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-7 E XA MPL E : The following example displays a typical conf iguration of the IP ad dress (10.1.5.109), subnet mask (255.255.0.0), and default gateway (10.1.1.3). S[...]
-
Page 72
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide 5-8 OL-7824-02 Note Passwords are case sensitive. Note The default passwor d for all l evels is “ cisc o ”. T o change the passwords, co mplete the following steps: Step 1 T[...]
-
Page 73
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-9 Y ou must enter the time setting menu in order to conf igure SNTP settings. Y ou may choose to skip the time settings menu if you wish to accept all default value[...]
-
Page 74
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide 5-10 OL-7824-0 2 • T o accept the display ed default value, press Enter . • T o change the value, type the desi red number of seconds (64 through 1024 ) and press Enter . En[...]
-
Page 75
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-11 Enable IP DNS-based ho stname translat ion? [yes]: If you choose to disable DNS lookup, sk ip the rest of this section and go to Step 6: C onfigurin g the RDR Fo[...]
-
Page 76
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide 5-12 OL-7824-0 2 Step 6: Configuring the RDR Formatter Destination The SCE 2000 passes Raw Data Records (RDR s) to an external collection sy stem via the RDR- Formatter . In ord[...]
-
Page 77
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-13 Step 7: Configuring Access Control Lists (ACLs) The SCE 2000 can be configured with Access Control Lists (ACLs), which are used to permit or deny incoming connec[...]
-
Page 78
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide 5-14 OL-7824-0 2 Order of Entries The order of the entries in the list is important. The entries in the list are tested sequentially , and the action is determined by the first [...]
-
Page 79
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-15 Type “ any ” and press Ent er to include any IP address in th e ACL. Note that there is no default for th is parameter. Enter IP addres s or the wo rd ‘any[...]
-
Page 80
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide 5-16 OL-7824-0 2 E XA MPL E : This example illustrates a common access control scenario. Let us assume the following: • W e want to permit every station to access the SCE on t[...]
-
Page 81
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-17 Step 8: Configuring SNMP Managing the SCE 2000 is possible also via a Network Management System (NMS) that supports SNMP . By default, SNMP is disabled on the SC[...]
-
Page 82
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide 5-18 OL-7824-0 2 The SNMP agent that resides inside the SCE 2000 will respond only to SET requests that use this communit y string. Enter SNMP SET communi ty name: Note that the[...]
-
Page 83
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-19 • T o disable the Authentication Failure trap, press Enter . • T o enable the Authentication Failure trap, ty pe y and press Enter . Enable the ‘Aut hentic[...]
-
Page 84
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide 5-20 OL-7824-0 2 Step 9: Configuring the T opology-Dependent Parameters The topology configuration me nu is a series of guide d questions relating to the de ployment of the SCE [...]
-
Page 85
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-21 • Secondary • On-Failure behavior : Determines the behavior of the SCE 2000 u pon failure, or reboot. One of the following link modes may be chosen for the S[...]
-
Page 86
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide 5-22 OL-7824-0 2 • T o specify Primary , press Enter . • T o specify Secondary , type 2 and press Enter . Enter SCE 2000 priori ty: 1- primary 2- secondary Enter your choice[...]
-
Page 87
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-23 E XA MPL E #2: Following is a sample topology configuration fo r a non-redundant bump-in-the-wire (inline) topology . In this topology , a single SCE 2000 is con[...]
-
Page 88
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide 5-24 OL-7824-0 2 Step 10: Completing and Saving the Configuration When you have completed the entire configuratio n, the system checks for errors. If errors are found, a warning[...]
-
Page 89
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Initial System Configuration SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-25 Do you want to save a copy of the startu p configura tion file i n a remote station? [no]: To save the configuration to a remote station, type y and press Enter [...]
-
Page 90
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Connecting the Management Interface SCE 2000 4xGBE Installation and Configuration Guide 5-26 OL-7824-0 2 E XA MPL E #2: Following is an example of a configuration that w as applied and sa ved to the startup configur ation as well as to an FTP site. Although [...]
-
Page 91
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Connecting the Management Interface SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-27 Cabling the Management Port The SCE 2000 has two management ports, labeled Mng1 and Mng 2. Use the Mng 1 port. Th e Mng 2 port is currently not operationa[...]
-
Page 92
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Connecting the Management Interface SCE 2000 4xGBE Installation and Configuration Guide 5-28 OL-7824-0 2 V erifying Management Interface Connectivity If the SCE 2000 platform has been powered up, test no w to verify that connectivity has been established bet[...]
-
Page 93
Chapter 5 Connecting the Management Interfaces and Performing Initial System Configur ation Connecting the Management Interface SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 5-29 This completes the procedures for connecti ng the management interfaces and for initial configuration of the SCE 2000 platform. Proceed to the next chapte[...]
-
Page 94
[...]
-
Page 95
SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 6-1 This chapter provides instructions for cabling the Gigabit Ethernet ports for both one and two SCE 2000 topologies, and for configuring Gigabit Ethernet (GBE) interface parameters. In a topology utilizing two SCE 2000 s (cascade), this includes the cascade ports as well as the line [...]
-
Page 96
Chapter 6 Cabling the Line Ports and Completing the Installation Connecting the line ports to the network SCE 2000 4xGBE Installation and Configuration Guide 6-2 OL-7824-02 Cabling Diagrams Before beginning, find the appropriate cabling di agra m for the topology in your installation: • Single SCE 2000 topologies • Single Link: Inline T opology[...]
-
Page 97
Chapter 6 Cabling the Line Ports and Completing the Installation Connecting the line ports to the network SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 6-3 Single Link: Receive-only T opology In this topology , an optical splitter r esides physically on the GBE link that the SCE 2000 should monitor . The optical splitter is connect[...]
-
Page 98
Chapter 6 Cabling the Line Ports and Completing the Installation Connecting the line ports to the network SCE 2000 4xGBE Installation and Configuration Guide 6-4 OL-7824-02 As with the single link cabling, inline topologies require both Receive and T ransmit fibers, while Receive-only systems use only Receive fibers. Note Receive-only topologies ca[...]
-
Page 99
Chapter 6 Cabling the Line Ports and Completing the Installation Connecting the line ports to the network SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 6-5 Dual Link: T wo SCE 2000s T opology In this topology , two SCE 2000 s are connected to two full duplex, GBE links, providing full redundancy through cascading the two SCE 2000 s[...]
-
Page 100
Chapter 6 Cabling the Line Ports and Completing the Installation Connecting the line ports to the network SCE 2000 4xGBE Installation and Configuration Guide 6-6 OL-7824-02 Inline topologies require connecting both Receive and T ransmit fibers to the SCE 2000 . Cascade ports always require both Receive a nd T ransmit fibers to be conne cted. The fo[...]
-
Page 101
Chapter 6 Cabling the Line Ports and Completing the Installation Connecting the line ports to the network SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 6-7 Configuring the GBE Interface Parameters By default, the SCE 2000 GBE line interface ports are configured with auto-negotiation disabled. The procedure for enabling auto-negotia[...]
-
Page 102
Chapter 6 Cabling the Line Ports and Completing the Installation Connecting the line ports to the network SCE 2000 4xGBE Installation and Configuration Guide 6-8 OL-7824-02 Connecting the GBE Line Interface Ports The following sections present the general procedure for cabling the GBE interface ports. Refer to Cabling Diagrams (on page 6-2 ) to fin[...]
-
Page 103
Chapter 6 Cabling the Line Ports and Completing the Installation Connecting the line ports to the network SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 6-9 Make sure to push on the conn ector un til you hear a click, which indicates th at th e connector is fully inserted and secured i n the receptacle. Always make sure that you ins[...]
-
Page 104
Chapter 6 Cabling the Line Ports and Completing the Installation Connecting the line ports to the network SCE 2000 4xGBE Installation and Configuration Guide 6-10 OL-7824-0 2 T esting Connectivity: Examining Link LEDs and Counters If the SCE 2000 platform has been powered up, test no w to verify that connectivity has been established on all links. [...]
-
Page 105
Chapter 6 Cabling the Line Ports and Completing the Installation Connecting the line ports to the network SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 6-11 E XA MPL E : The following example displays a system response. SCE 2000 # show inte rface Gigab itEthernet 0/1 Auto negotiatio n configure d: Enabled Actual Status: Link is on [...]
-
Page 106
Chapter 6 Cabling the Line Ports and Completing the Installation Installing a Cascaded System SCE 2000 4xGBE Installation and Configuration Guide 6-12 OL-7824-0 2 Installing a Cascaded System This section outlines the installation procedur es for a redundant solution with t wo cascaded SCE 2000 platforms. Refer to the Cisco Service Contr ol Engine [...]
-
Page 107
Chapter 6 Cabling the Line Ports and Completing the Installation Installing a Cascaded System SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 6-13 Step 11 Y ou can now start working with the Subscriber Manager . CLI Commands This section presents CLI commands relevant to th e configuration and monitoring of a redundant system. Use th[...]
-
Page 108
Chapter 6 Cabling the Line Ports and Completing the Installation Installing a Cascaded System SCE 2000 4xGBE Installation and Configuration Guide 6-14 OL-7824-0 2 T o configure the connection mode: Step 1 From the SCE 2000 (conf ig if )# prompt, type connection-mode inline- cascade/receive-only-cascade [p hysically-connected-links {link-0/link-1} ][...]
-
Page 109
Chapter 6 Cabling the Line Ports and Completing the Installation Installing a Cascaded System SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 6-15 • Sniffing: allows the SCE 2000 platform to forward traf fic on the specified link through the bypass mechanism while still analyzing the traffic passively . Sniffing is perm itted to be[...]
-
Page 110
Chapter 6 Cabling the Line Ports and Completing the Installation Loading and Activating a Service Control Ap plicati on SCE 2000 4xGBE Installation and Configuration Guide 6-16 OL-7824-0 2 T o view the current link mode: Step 1 From the SCE 2000 # prompt, type show interface linecard 0 link mode and press Enter . T o view the current link mappings:[...]
-
Page 111
SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 7-1 This chapter describes how to start up the SCE 2000 platform, reboot, and shutdown. It also describes how to manage configurations. This chapter contains the following sections: • Starting the SC E 2000 Platform 7-1 • Managing SCE 2000 Configurations 7-4 • Performing Complex C[...]
-
Page 112
Chapter 7 Basic SCE 2000 Platform Operations S tarting the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide 7-2 OL-7824-02 Y ou are now ready to start your SCE 2000 platform. Proceed to the section S tarting the System and Observing Initial Conditions (on pa ge 7-2 ). Starting the System and Observing Initial Conditions After i[...]
-
Page 113
Chapter 7 Basic SCE 2000 Platform Operations S tarting the SCE 2000 Platform SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 7-3 Final T ests The procedures for performing the fi nal tests to verify that the SCE 2000 is func tioning properly are explained in the following sections: • V erifying Operational S tatus (on page 7-3 ) ?[...]
-
Page 114
Chapter 7 Basic SCE 2000 Platform Operations Managing SCE 2000 Confi gurations SCE 2000 4xGBE Installation and Configuration Guide 7-4 OL-7824-02 E XA MPL E : The following example shows the current User -File-Log device counters. SCE 2000 # show logg er device u ser-file-log c ounters Logger device U ser-File-Lo g counters: Total info messages: 1 [...]
-
Page 115
Chapter 7 Basic SCE 2000 Platform Operations Managing SCE 2000 Confi gurations SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 7-5 T o view the running configuration, complete the following steps: Step 1 At the SCE 2000 # prompt, type show running-config . The system shows the running c onfiguration . SCE 2000 # show running-config #[...]
-
Page 116
Chapter 7 Basic SCE 2000 Platform Operations Managing SCE 2000 Confi gurations SCE 2000 4xGBE Installation and Configuration Guide 7-6 OL-7824-02 T o show the version information for the SCE 2000 platform software and hardware, complete the following steps: Step 1 At the SCE 2000 # prompt, type show version . The system shows the versio n inform at[...]
-
Page 117
Chapter 7 Basic SCE 2000 Platform Operations Managing SCE 2000 Confi gurations SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 7-7 T o show the s ystem uptime for the SCE 2000 platform software and hardware, complete the following steps: Step 1 At the SCE 2000 # prompt, type show system-uptime. The system shows how long t he system h[...]
-
Page 118
Chapter 7 Basic SCE 2000 Platform Operations Managing SCE 2000 Confi gurations SCE 2000 4xGBE Installation and Configuration Guide 7-8 OL-7824-02 E XA MPL E : The following example shows the running configuration file. SCE 2000 # show running-config #This is a gene ral configu ration file (r unning-conf ig). #Created on 15: 50:56 CET MON February 1[...]
-
Page 119
Chapter 7 Basic SCE 2000 Platform Operations Managing SCE 2000 Confi gurations SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 7-9 Recovering a Previous Configuration When you save a new configuration, the system automatically backs up the old configuration in the directory tffs0:system/prevconf/ . Up to nine versions of the startup [...]
-
Page 120
Chapter 7 Basic SCE 2000 Platform Operations Performing Complex Configur ations SCE 2000 4xGBE Installation and Configuration Guide 7-10 OL-7824-0 2 E XA MPL E : The following example displays a saved configuratio n file and then restores the file to overwrite the current configuration. SCE 2000 # more tffs0:system/prevconf/config.tx1 #This is a ge[...]
-
Page 121
Chapter 7 Basic SCE 2000 Platform Operations Rebooting and Shutting Do wn the SCE Platform SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 7-11 Rebooting and Shutting Down the SCE Platform Rebooting the SCE Platform Rebooting the SCE 2000 platform is required after installing a new firmware, in order for that firmware to take effect.[...]
-
Page 122
Chapter 7 Basic SCE 2000 Platform Operations Rebooting and Shutting Do wn the SCE Platform SCE 2000 4xGBE Installation and Configuration Guide 7-12 OL-7824-0 2 Shutting Down the SCE Platform Shutting down the SCE 2000 platform is required before turnin g the power off. This helps to ensure that non-volatile memory devices in the SCE 2000 platform a[...]
-
Page 123
SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 8-1 Y our SCE 2000 platform went through extensive testing before leaving the factory . However , if you encounter problems starting it, use the information in this chapter to help isolate the cause of the problems. The procedures in this chapte r assume that you are troubleshooting the[...]
-
Page 124
Chapter 8 T roubleshooting T roubleshooting Overvie w SCE 2000 4xGBE Installation and Configuration Guide 8-2 OL-7824-02 The following table shows the general troubleshooting strategy described in th is chapter . Refer to this table, as necessary , to follo w the steps to isolate problems to a specific subsystem and resolve the problem if possible.[...]
-
Page 125
Chapter 8 T roubleshooting T roubleshooting Overvie w SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 8-3 SCE 2000 (config)# boot system ftp://vk:vk@10.1.1.230/downloads/SENum.pkg.pkg Verifying package fil e SENum.pkg. pkg… Package file ve rified OK. • T roubleshooting the management subsystem: • show interface Fast Ethernet 0/[...]
-
Page 126
Chapter 8 T roubleshooting T roubleshooting Overvie w SCE 2000 4xGBE Installation and Configuration Guide 8-4 OL-7824-02 ip address: 10. 1.6.145 subnet mask: 255.255. 0.0 Configured duplex: auto AutoNegotiation is On, lin k is Up, actua l duplex: h alf • show interface GigabitEthernet 0/# counters: Displays the values of counters of a GBE interfa[...]
-
Page 127
Chapter 8 T roubleshooting T roubleshooting Overvie w SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 8-5 Copying the User Log Y ou can view the log file by copying it to an external source or to disk. This command copies both log files to the local SCE 2000 platform disk or any external host running a FTP server . T o copy the user [...]
-
Page 128
Chapter 8 T roubleshooting T roubleshooting Overvie w SCE 2000 4xGBE Installation and Configuration Guide 8-6 OL-7824-02 Clearing the User Log Y ou can clear the contents of the user log at an y time. It is reco mmended that a copy be made before the log is cleared. T o clear the user log, complete the following steps: Step 1 From the SCE 2000 # pr[...]
-
Page 129
Chapter 8 T roubleshooting T roubleshooting Overvie w SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 8-7 Generating a File for T echnical Support In order for technical support to be most ef fective, the user should provide them with the information contained in the system logs. Use the logger get support-file command to generate a [...]
-
Page 130
Chapter 8 T roubleshooting T roubleshooting Overvie w SCE 2000 4xGBE Installation and Configuration Guide 8-8 OL-7824-02 SCE 2000 Operational St atus The following table lists the operational states of the SCE 2000 . The S tatus LED on the SCE 2000 Front Panel reflects the current SCE 2000 operational status. The operational status can be displayed[...]
-
Page 131
Chapter 8 T roubleshooting Problem Solving Using a Subs ystems Approa ch SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 8-9 Problem Solving Using a Subsystems Approach Identifying Startup Problems Startup probl ems are commonly due to the source power or to a poor cable connection. When you start up the SCE 2000 platform for the fir[...]
-
Page 132
Chapter 8 T roubleshooting Problem Solving Using a Subs ystems Approa ch SCE 2000 4xGBE Installation and Configuration Guide 8-10 OL-7824-0 2 T a ble 8-3 T roubleshootin g the P ower Subsystem Symptom Possible Cause Possible Solution Power LED on the front panel and LED s on the power sup ply unit a re not lit, or do n ot remain lit continuously. P[...]
-
Page 133
Chapter 8 T roubleshooting Problem Solving Using a Subs ystems Approa ch SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 8-11 T roubleshooting the Firmware Package Installation Check the following to help isolate a problem in the installation of the firmware package. Problems related to the installation of the firm ware package could[...]
-
Page 134
Chapter 8 T roubleshooting Problem Solving Using a Subs ystems Approa ch SCE 2000 4xGBE Installation and Configuration Guide 8-12 OL-7824-0 2 T roubleshooting the Management Subsystem Check the following to help isolate a problem in the management subsystem. Problems in the management subsystem could be any of the following: • Management link is [...]
-
Page 135
Chapter 8 T roubleshooting Problem Solving Using a Subs ystems Approa ch SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 8-13 • Telnet connection cannot be estab lished • Mng LINK LED is lit (link is up) CLI comman d : show telnet status Telnet server is disabled En ab le Telnet server: service telnetd CLI comman d : show telnet [...]
-
Page 136
Chapter 8 T roubleshooting Problem Solving Using a Subs ystems Approa ch SCE 2000 4xGBE Installation and Configuration Guide 8-14 OL-7824-0 2 T roubleshooting the Link Interface Subsystem Check the following to help isolate a pr oblem in the link interface subsystem. In general, the case where no traffic is coming out of the SCE 2000 is often cause[...]
-
Page 137
Chapter 8 T roubleshooting Problem Solving Using a Subs ystems Approa ch SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 8-15 • GBE link is up (GBE interface link LED is continuous gr een and GBE interface Tx LED is flashing) • Peer does not receive traffic from SCE 2000 CLI comman ds : • show interface GigabitEtherne t 0/# cou[...]
-
Page 138
[...]
-
Page 139
SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 A-1 The SCE 2000 platform External Optical Bypass module preserves the service provider GBE links in case of complete power failure of the SCE 2000 platform, or for implementing a maintenance window . The SCE 2000 platform state-of-the-art Service Control platform is being deployed at I[...]
-
Page 140
Appendix A The External Optical Bypass Module External Optical Byp ass Functionality SCE 2000 4xGBE Installation and Configuration Guide A-2 OL-7824-02 External Optical Bypass Functionality The External Optical Bypass module is connected bu mp-in-the-wire in the GBE link. It is then connected to the SCE 2000 platform with two types of connections: [...]
-
Page 141
Appendix A The External Optical Bypass Module External Optical Byp ass Functionality SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 A-3 The figure below illustrates the operation of the bypass module when it is active (in bypass). The data traffic flows through the bypass module, and the GBE link no longer includes the SCE 2000 plat[...]
-
Page 142
Appendix A The External Optical Bypass Module The External Optical Bypass Module Front Pane l SCE 2000 4xGBE Installation and Configuration Guide A-4 OL-7824-02 The External Optical Bypass Module Front Panel The front panel of the External Optical bypass module contains the following com ponents: • SUB Rx/Tx: GBE port that connects to the networ [...]
-
Page 143
Appendix A The External Optical Bypass Module Installing the External Bypass Module SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 A-5 Installing the External Bypass Module Installation of the External Optical Bypass modul e requires two main steps, which are described in detail in the following sections. T o install the External Op[...]
-
Page 144
Appendix A The External Optical Bypass Module Installing the External Bypass Module SCE 2000 4xGBE Installation and Configuration Guide A-6 OL-7824-02 Cabling the External Optical Bypass Module The following procedure describes how to cable the External Optical Bypass module. Note the following: • All connections to the External Optical Byp ass m[...]
-
Page 145
Appendix A The External Optical Bypass Module Installing the External Bypass Module SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 A-7 The following figure illustrates the connectivity of the External Optical Bypass module. T o cable the External Optical By pass module: Step 1 Connect an optical cable (user supplied) be tween the GB[...]
-
Page 146
Appendix A The External Optical Bypass Module Installing the External Bypass Module SCE 2000 4xGBE Installation and Configuration Guide A-8 OL-7824-02 Bypass module is now active (in bypass ), and is pe rformi ng a loopback on t hese interfaces . Step 6 Connect the control cable (supplied in the kit) from the Bypass 9-pin D-T ype connector on the r[...]
-
Page 147
Appendix A The External Optical Bypass Module S pecificati ons SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 A-9 Specifications Item Value Optical Connectors SC Switching Spe ed 15 m s max Operating Wav e l e ngt h • Multi Mo de: 850 nm • Single Mode: 13 1 0 nm Operating Tem perature -10° C to + 65° C (14° F to 149° F) Stor[...]
-
Page 148
[...]
-
Page 149
SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 1 A Access control lists • 5-12 Airflow • 4-3 Application loading and testing • 6-15 Attaching a Chassis Ground Connection • 4- 12 Attaching the Brackets to the SCE 2000 • 4- 7 Attaching the Crossrail Supports to the Rack • 4-9 audience • v Audience • v Auto-negotiation [...]
-
Page 150
Index SCE 2000 4xGBE Installation and Configuration Guide 2 OL-7824-02 D Definitions of Service Request Severity • ix Document content • v conventions • vii Document Conventions • vii Documentation Feedback • viii Domain Name Server (DNS) • 5-10 Dual link Inline Installation • 3-5 Dual Link Receive-Only Topology • 3-6 Single SCE 200[...]
-
Page 151
Index SCE 2000 4xGBE Installation and Configuration Guide OL-7824-02 3 Physically connected link • 3-9, 5-19, 6- 12 Physically Connected Links Parameter • 3-9 Power turning on • 7-2 Power Supply Overview • 4-14 Power Supply Specifications • 4-17 Powering Down a DC-Input Power Supply Unit and Removing the DC-Input Leads • 4-19 Powering D[...]
-
Page 152
Index SCE 2000 4xGBE Installation and Configuration Guide 4 OL-7824-02 Configuring SNMP • 5-16 Step 9 Configuring the Topology-Dependent Parameters • 5-19 Submitting a Service Request • ix support • viii T Testing Connectivity Examining Link LEDs and Counters • 6- 9 The External Optical Bypass Module • A-1 The External Optical Bypass Mo[...]